메뉴 건너뛰기




Volumn 37, Issue 4, 1997, Pages 641-647

Analysis of a two-unit warm standby system subject to degradation

Author keywords

[No Author keywords available]

Indexed keywords

CALCULATIONS; COMPUTER SOFTWARE; FAILURE ANALYSIS; INTEGRATION; LAPLACE TRANSFORMS; MATHEMATICAL MODELS; PROBABILITY; PROBABILITY DENSITY FUNCTION; RELIABILITY; REPAIR; SYSTEMS ANALYSIS;

EID: 0031126492     PISSN: 00262714     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0026-2714(96)00070-4     Document Type: Article
Times cited : (25)

References (9)
  • 1
    • 0024736085 scopus 로고
    • Profit analysis of two unit priority standby system with administrative delay in repair
    • Gupta, R. and Goel, L. R., Profit analysis of two unit priority standby system with administrative delay in repair. Int. J. Systems Sci., 1989, 20 (9), 1703-1712.
    • (1989) Int. J. Systems Sci. , vol.20 , Issue.9 , pp. 1703-1712
    • Gupta, R.1    Goel, L.R.2
  • 2
    • 0026254204 scopus 로고
    • Analysis of a two-unit cold standby system with degradation and linearly increasing failure rates
    • Gupta, R., Analysis of a two-unit cold standby system with degradation and linearly increasing failure rates. Int. J. Systems Sci., 1991, 22 (11), 2329-2338.
    • (1991) Int. J. Systems Sci. , vol.22 , Issue.11 , pp. 2329-2338
    • Gupta, R.1
  • 4
    • 0025588628 scopus 로고
    • Cost analysis of a two-dissimilar-unit cold standby redundant system with administrative delay and no priority in repair
    • Elias, S. S. and Labib, S. W., Cost analysis of a two-dissimilar-unit cold standby redundant system with administrative delay and no priority in repair. Microelectron. Reliab., 1990, 30 (6), 1155-1177.
    • (1990) Microelectron. Reliab. , vol.30 , Issue.6 , pp. 1155-1177
    • Elias, S.S.1    Labib, S.W.2
  • 5
    • 0021977055 scopus 로고
    • Cost analysis of a two unit priority standby system with imperfect switch and arbitrary distributions
    • Goel, L. R. and Gupta, R., Cost analysis of a two unit priority standby system with imperfect switch and arbitrary distributions. Microelectron. Reliab., 1985, 25 (1), 65-69.
    • (1985) Microelectron. Reliab. , vol.25 , Issue.1 , pp. 65-69
    • Goel, L.R.1    Gupta, R.2
  • 6
    • 0025751784 scopus 로고
    • Cost analysis of a three unit standby system subject to random shocks and linearly increasing failure rates
    • Gupta, R. and Bansal, S., Cost analysis of a three unit standby system subject to random shocks and linearly increasing failure rates. Reliab. Engng System Safety, 1991, 33, 249-263.
    • (1991) Reliab. Engng System Safety , vol.33 , pp. 249-263
    • Gupta, R.1    Bansal, S.2
  • 7
    • 0025842422 scopus 로고
    • Profit analysis of a two unit priority system subject to degradation
    • Gupta, R. and Bansal, S., Profit analysis of a two unit priority system subject to degradation. Int. J. Systems Sci., 1991, 22(1), 61-72.
    • (1991) Int. J. Systems Sci. , vol.22 , Issue.1 , pp. 61-72
    • Gupta, R.1    Bansal, S.2
  • 8
    • 0026399285 scopus 로고
    • Stochastic analysis of a two-unit warm standby system with two switching devices
    • Labib, S. W., Stochastic analysis of a two-unit warm standby system with two switching devices. Microelectron. Reliab., 1991, 31 (6), 1163-1173.
    • (1991) Microelectron. Reliab. , vol.31 , Issue.6 , pp. 1163-1173
    • Labib, S.W.1
  • 9
    • 0027541660 scopus 로고
    • Cost-benefit analysis of a two-unit warm standby reliability system with two types of repair facilities
    • Mokaddis, G. S., Labib, S. W. and El-Said, K. H. M., Cost-benefit analysis of a two-unit warm standby reliability system with two types of repair facilities. Microelectron. Reliab., 1993, 33 (3), 335-348.
    • (1993) Microelectron. Reliab. , vol.33 , Issue.3 , pp. 335-348
    • Mokaddis, G.S.1    Labib, S.W.2    El-Said, K.H.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.