Scheduling about a common due date with job-dependent asymmetric earliness and tardiness penalties

Author keywords

Due date assignment; Exact and approximate algorithms; General earliness and tardiness costs; Manufacturing; Scheduling sequencing

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; COSTS; MATHEMATICAL MODELS; OPTIMIZATION; SCHEDULING;

EID: 0031121947     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/0377-2217(95)00253-7     Document Type: Article
Times cited : (11)

References (23)
  • 1
    • 0024480571 scopus 로고
    • Simultaneous minimization of mean and variation of flow time and waiting time in single machine systems
    • Bagchi, U. (1989), "Simultaneous minimization of mean and variation of flow time and waiting time in single machine systems", Operations Research 37, 118-125.
    • (1989) Operations Research , vol.37 , pp. 118-125
    • Bagchi, U.1
  • 2
    • 0023440150 scopus 로고
    • Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date
    • Bagchi, U., Chang, Y.L., and Sullivan, R.S. (1987), "Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date", Naval Research Logistics 34, 739-751.
    • (1987) Naval Research Logistics , vol.34 , pp. 739-751
    • Bagchi, U.1    Chang, Y.L.2    Sullivan, R.S.3
  • 3
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, K.R., and Scudder, G.D. (1990), "Sequencing with earliness and tardiness penalties: A review", Operations Research 38, 22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 4
    • 0029378209 scopus 로고
    • Minimization of agreeably weighted variance in single machine systems
    • Cai, X. (1995), "Minimization of agreeably weighted variance in single machine systems", European Journal of Operational Research 85, 576-592.
    • (1995) European Journal of Operational Research , vol.85 , pp. 576-592
    • Cai, X.1
  • 5
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T.C.E., and Gupta, M. (1989), "Survey of scheduling research involving due date determination decisions", European Journal of Operational Research 38, 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.2
  • 6
    • 0001254311 scopus 로고
    • On the minimization of completion time variance with a bi-criteria extension
    • De, P., Ghosh, J.B., and Wells, C.E. (1992), "On the minimization of completion time variance with a bi-criteria extension", Operations Research 40, 1148-1155.
    • (1992) Operations Research , vol.40 , pp. 1148-1155
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 7
    • 0027543702 scopus 로고
    • On the general solution for a class of early/tardy problems
    • De, P., Ghosh, J.B., and Wells, C.E. (1993), "On the general solution for a class of early/tardy problems", Computers & Operational Research 20, 141-149.
    • (1993) Computers & Operational Research , vol.20 , pp. 141-149
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 8
    • 0017460225 scopus 로고
    • Minimizing waiting variance in the single machine problem
    • Eilon, S., and Chowdhury, I.G. (1977), "Minimizing waiting variance in the single machine problem", Management Science 23, 567-575.
    • (1977) Management Science , vol.23 , pp. 567-575
    • Eilon, S.1    Chowdhury, I.G.2
  • 9
    • 0027886805 scopus 로고
    • Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems
    • Federgruen, A., and Mosheiov, G. (1993), "Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems", Naval Research Logistics 40, 951-970.
    • (1993) Naval Research Logistics , vol.40 , pp. 951-970
    • Federgruen, A.1    Mosheiov, G.2
  • 10
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
    • Hall, N., and Posner, M.E. (1991), "Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date", Operations Research 39, 836-846.
    • (1991) Operations Research , vol.39 , pp. 836-846
    • Hall, N.1    Posner, M.E.2
  • 11
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date
    • Hall, N., Kubiak, W., and Sethi, S.P. (1991), "Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date", Operations Research 39, 847-856.
    • (1991) Operations Research , vol.39 , pp. 847-856
    • Hall, N.1    Kubiak, W.2    Sethi, S.P.3
  • 14
    • 0027256856 scopus 로고
    • Scheduling with monotonous earliness and tardiness penalties
    • Kahlbacher, H.G. (1993), "Scheduling with monotonous earliness and tardiness penalties", European Journal of Operational Research 64, 258-277.
    • (1993) European Journal of Operational Research , vol.64 , pp. 258-277
    • Kahlbacher, H.G.1
  • 15
    • 0017910613 scopus 로고
    • A solvable case of the one-machine scheduling problem with ready and due times
    • Kise, H., Ibaraki, T., and Mine, H. (1978), "A solvable case of the one-machine scheduling problem with ready and due times", Operations Research 26, 121-126.
    • (1978) Operations Research , vol.26 , pp. 121-126
    • Kise, H.1    Ibaraki, T.2    Mine, H.3
  • 16
    • 0026907707 scopus 로고
    • V-shape property for optimal schedules with monotone penalty functions
    • Krieger, A.M., and Raghavachari, M. (1992), "V-shape property for optimal schedules with monotone penalty functions", Computers & Operations Research 19, 533-534.
    • (1992) Computers & Operations Research , vol.19 , pp. 533-534
    • Krieger, A.M.1    Raghavachari, M.2
  • 17
    • 0027644930 scopus 로고
    • Completion time variance minimization on a single machine is difficult
    • Kubiak, W. (1993), "Completion time variance minimization on a single machine is difficult", Operations Research Letters 14, 49-59.
    • (1993) Operations Research Letters , vol.14 , pp. 49-59
    • Kubiak, W.1
  • 18
    • 0016955936 scopus 로고
    • Sequencing to minimize the weighted number of tardy jobs
    • Lawler, E.L. (1976), "Sequencing to minimize the weighted number of tardy jobs", Rev. Automat. Informat. Rec. Opnl. 10, 27-33.
    • (1976) Rev. Automat. Informat. Rec. Opnl. , vol.10 , pp. 27-33
    • Lawler, E.L.1
  • 19
    • 77957077792 scopus 로고
    • A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness
    • Lawler, E.L. (1977), "A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness", Annals of Discrete Mathematics 1, 331-342.
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 331-342
    • Lawler, E.L.1
  • 20
    • 0014571702 scopus 로고
    • A functional equation and its applications to resource allocation and sequencing problems
    • Lawler, E.L., and Moore, J. (1969), "A functional equation and its applications to resource allocation and sequencing problems", Management Science 16, 77-84.
    • (1969) Management Science , vol.16 , pp. 77-84
    • Lawler, E.L.1    Moore, J.2
  • 21
    • 0025897854 scopus 로고
    • Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date
    • Lee, C.-Y., Danusaputro, S.L., and Lin, C.-S. (1991), "Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date", Computers & Operations Research 18, 379-389.
    • (1991) Computers & Operations Research , vol.18 , pp. 379-389
    • Lee, C.-Y.1    Danusaputro, S.L.2    Lin, C.-S.3
  • 22
    • 0020748381 scopus 로고
    • Stochastic scheduling with release dates and due dates
    • Pinedo, M. (1983), "Stochastic scheduling with release dates and due dates", Operations Research 31, 559-572.
    • (1983) Operations Research , vol.31 , pp. 559-572
    • Pinedo, M.1
  • 23
    • 0022676335 scopus 로고
    • A V-shape property for optimal schedule of jobs about a common due date
    • Raghavachari, M. (1986), "A V-shape property for optimal schedule of jobs about a common due date", European Journal of Operational Research 23, 401-402.
    • (1986) European Journal of Operational Research , vol.23 , pp. 401-402
    • Raghavachari, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.