|
Volumn 41, Issue 1, 1997, Pages 5-11
|
An optimal real-time short term operation of independent hydro generator company in the open electricity market
a a |
Author keywords
Hydro generator; National market; Optimisation
|
Indexed keywords
HYDROTHERMAL SYSTEMS;
OPEN ELECTRICITY MARKET (OEM);
ALGORITHMS;
ELECTRIC LOAD DISPATCHING;
ELECTRIC POWER SYSTEM INTERCONNECTION;
HYDROELECTRIC POWER PLANTS;
MATHEMATICAL MODELS;
OPERATIONS RESEARCH;
OPTIMIZATION;
SCHEDULING;
HYDROELECTRIC GENERATORS;
|
EID: 0031118013
PISSN: 03787796
EISSN: None
Source Type: Journal
DOI: 10.1016/s0378-7796(96)01132-7 Document Type: Article |
Times cited : (6)
|
References (4)
|