메뉴 건너뛰기




Volumn 19, Issue 1-2, 1997, Pages 3-28

Simulating electricity restructuring in California: Interactions with the regional market

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COSTS; ECONOMIC AND SOCIAL EFFECTS; ELECTRIC POWER DISTRIBUTION; ELECTRIC POWER TRANSMISSION; INDUSTRIAL ECONOMICS; REGIONAL PLANNING;

EID: 0031089272     PISSN: 09287655     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0928-7655(97)00008-0     Document Type: Article
Times cited : (12)

References (45)
  • 1
    • 0029252684 scopus 로고
    • The generalized unit commitment problem
    • Baldick, R., 1995. The generalized unit commitment problem. IEEE Transactions on Power Systems 10 (1), 465-473.
    • (1995) IEEE Transactions on Power Systems , vol.10 , Issue.1 , pp. 465-473
    • Baldick, R.1
  • 2
    • 0041965382 scopus 로고
    • California Gas and Electric Utilities
    • CGEU, 1995. California Gas Report Supplement. California Gas and Electric Utilities.
    • (1995) California Gas Report Supplement
  • 12
    • 0002586287 scopus 로고
    • An efficient electricity market: Using a pool to support real competition
    • Garber, D., Hogan, W., Ruff, L., 1994. An efficient electricity market: Using a pool to support real competition. The Electricity Journal 7 (7), 48-60.
    • (1994) The Electricity Journal , vol.7 , Issue.7 , pp. 48-60
    • Garber, D.1    Hogan, W.2    Ruff, L.3
  • 13
    • 38248999783 scopus 로고
    • Coordination in the wholesale market: Where does it work?
    • Gilbert, R., Kahn, E., White, M., 1993. Coordination in the wholesale market: Where does it work? The Electricity Journal 6 (8), 51-59.
    • (1993) The Electricity Journal , vol.6 , Issue.8 , pp. 51-59
    • Gilbert, R.1    Kahn, E.2    White, M.3
  • 14
    • 0001686436 scopus 로고
    • Markets in real electric networks require reactive prices
    • Hogan, W., 1993. Markets in real electric networks require reactive prices. The Energy Journal 14 (3), 171-200.
    • (1993) The Energy Journal , vol.14 , Issue.3 , pp. 171-200
    • Hogan, W.1
  • 16
    • 0024104081 scopus 로고
    • A two-year assessment of the computerized operational-planning program at Cincinnati Gas and Electric
    • Jackups, R., Raga, J., Le, K., Day, J., 1988. A two-year assessment of the computerized operational-planning program at Cincinnati Gas and Electric. IEEE Transactions on Power Systems 3 (4), 1840-1846.
    • (1988) IEEE Transactions on Power Systems , vol.3 , Issue.4 , pp. 1840-1846
    • Jackups, R.1    Raga, J.2    Le, K.3    Day, J.4
  • 19
    • 0000481098 scopus 로고
    • Regulation by simulation: The role of production cost models in electricity planning and pricing
    • Kahn, E., 1995. Regulation by simulation: The role of production cost models in electricity planning and pricing. Operations Research 43 (3), 388-398.
    • (1995) Operations Research , vol.43 , Issue.3 , pp. 388-398
    • Kahn, E.1
  • 21
    • 0028743547 scopus 로고
    • Reactive power is a cheap constraint
    • Kahn, E., Baldick, R., 1994. Reactive power is a cheap constraint. The Energy Journal 15 (4), 191-201.
    • (1994) The Energy Journal , vol.15 , Issue.4 , pp. 191-201
    • Kahn, E.1    Baldick, R.2
  • 22
    • 0026908802 scopus 로고
    • Evaluating dispatchability features in competitive bidding
    • Kahn, E., Marnay, C., Berman, D., 1992. Evaluating dispatchability features in competitive bidding. IEEE Transactions on Power Systems 7 (3), 1259-1265.
    • (1992) IEEE Transactions on Power Systems , vol.7 , Issue.3 , pp. 1259-1265
    • Kahn, E.1    Marnay, C.2    Berman, D.3
  • 25
    • 0029185067 scopus 로고
    • Application of static VAR compensators for the dynamic performance of the Mead-Adelanto and the Mead-Phoenix Transmission Projects
    • Lee, R., Beshir, M., Finley, A., Hayes, D., Hsu, J., Peterson, H., DeShazo, G., Gerlach, W., 1995. Application of static VAR compensators for the dynamic performance of the Mead-Adelanto and the Mead-Phoenix Transmission Projects. IEEE Transactions on Power Delivery 10 (1), 459-466.
    • (1995) IEEE Transactions on Power Delivery , vol.10 , Issue.1 , pp. 459-466
    • Lee, R.1    Beshir, M.2    Finley, A.3    Hayes, D.4    Hsu, J.5    Peterson, H.6    DeShazo, G.7    Gerlach, W.8
  • 27
    • 0029484279 scopus 로고
    • The strategy curve: A method for representing and interpreting generator bidding strategies
    • Lucas, N., Taylor, P., 1995. The strategy curve: A method for representing and interpreting generator bidding strategies. Utilities Policy 5 (1), 75-80.
    • (1995) Utilities Policy , vol.5 , Issue.1 , pp. 75-80
    • Lucas, N.1    Taylor, P.2
  • 29
    • 0029190432 scopus 로고
    • Power markets and market power
    • Newbery, D., 1995. Power markets and market power. The Energy Journal 16 (3), 39-67.
    • (1995) The Energy Journal , vol.16 , Issue.3 , pp. 39-67
    • Newbery, D.1
  • 33
    • 8744301635 scopus 로고    scopus 로고
    • Challenges to an on-line OPF implementation, optimal power flow: Solution techniques, requirements, and challenges
    • Papalexopoulos, A., 1996. Challenges to an on-line OPF implementation, optimal power flow: Solution techniques, requirements, and challenges. IEEE Tutorial 96 TP 111-0, pp. 36-51.
    • (1996) IEEE Tutorial 96 TP 111-0 , pp. 36-51
    • Papalexopoulos, A.1
  • 34
    • 21344465882 scopus 로고    scopus 로고
    • Measuring market power in electric generation
    • Perl, L., 1996. Measuring market power in electric generation. Antitrust Law Journal 64 (2), 311-321.
    • (1996) Antitrust Law Journal , vol.64 , Issue.2 , pp. 311-321
    • Perl, L.1
  • 36
    • 0026907883 scopus 로고
    • Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units
    • Scully, A., Harpur, A., Le, K., Day, J., Malone, M., Mousseau, T., 1992. Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units. IEEE Transactions on Power Systems 7 (3), 1313-1321.
    • (1992) IEEE Transactions on Power Systems , vol.7 , Issue.3 , pp. 1313-1321
    • Scully, A.1    Harpur, A.2    Le, K.3    Day, J.4    Malone, M.5    Mousseau, T.6
  • 38
    • 0042465867 scopus 로고
    • Transmission constrained production costing: As key to pricing transmission access
    • Simons, N., Garver, L., Mukerji, R., 1993. Transmission constrained production costing: As key to pricing transmission access. Public Utilities Fortnightly.
    • (1993) Public Utilities Fortnightly
    • Simons, N.1    Garver, L.2    Mukerji, R.3
  • 42
    • 0041464177 scopus 로고
    • Rep. OE-411, Western Systems Coordinating Council, Salt Lake City
    • WSCC, 1995. Coordinated bulk power supply program. Rep. OE-411, Western Systems Coordinating Council, Salt Lake City.
    • (1995) Coordinated Bulk Power Supply Program


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.