-
1
-
-
3743083749
-
Simulation of flexible manufacturing system-applications of computer operating techniques
-
A. Miller, ed. (Silver Spring, MD: IEEE Computer Society Press)
-
Acree, E. S. and Smith, M. L., 1985, Simulation of flexible manufacturing system-applications of computer operating techniques. Proceedings of the IEEE 18th Annual Simulation Symposium, A. Miller, ed. (Silver Spring, MD: IEEE Computer Society Press).
-
(1985)
Proceedings of the IEEE 18Th Annual Simulation Symposium
-
-
Acree, E.S.1
Smith, M.L.2
-
2
-
-
0000450049
-
Simulation of a simplified job shop
-
Baker, C. T. and Dzielinski, B. P., 1960, Simulation of a simplified job shop. Management Science, 6(3), 311-323.
-
(1960)
Management Science
, vol.6
, Issue.3
, pp. 311-323
-
-
Baker, C.T.1
Dzielinski, B.P.2
-
3
-
-
0022807123
-
A SLAM II simulation study of a simplified flow shop
-
Barrett, R. T. and Barman, S., 1986, A SLAM II simulation study of a simplified flow shop. Simulation, 47(5), 181-187.
-
(1986)
Simulation
, vol.47
, Issue.5
, pp. 181-187
-
-
Barrett, R.T.1
Barman, S.2
-
4
-
-
0019280149
-
Models for understanding flexible manufacturing systems
-
Buzacott, J. A. and Shantikumar, J. G., 1980, Models for understanding flexible manufacturing systems. AIIE Transactions, 12(4), 339-350.
-
(1980)
AIIE Transactions
, vol.12
, Issue.4
, pp. 339-350
-
-
Buzacott, J.A.1
Shantikumar, J.G.2
-
5
-
-
0022546416
-
Using SLAM to design the material handling system of a flexible manufacturing system
-
Chang, Y. L., Sullivan, R. S. and Wilson, J. R., 1986, Using SLAM to design the material handling system of a flexible manufacturing system. International Journal of Production Research, 24(1), 15-26.
-
(1986)
International Journal of Production Research
, vol.24
, Issue.1
, pp. 15-26
-
-
Chang, Y.L.1
Sullivan, R.S.2
Wilson, J.R.3
-
6
-
-
0021423836
-
Characterization of automatic guided vehicle dispatching rules
-
Egbelu, P. J. and tanchoco, J. M. A., 1984, Characterization of automatic guided vehicle dispatching rules. International Journal ofProduction Research, 22(3), 359-374.
-
(1984)
International Journal Ofproduction Research
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
7
-
-
0024480465
-
Hierarchical flow control: A framework for scheduling and planning discrete events in manufacturing systems
-
Gershwin, S. B., 1989, Hierarchical flow control: a framework for scheduling and planning discrete events in manufacturing systems. Proceedings of the IEEE, 77(1), 195-209.
-
(1989)
Proceedings of the IEEE
, vol.77
, Issue.1
, pp. 195-209
-
-
Gershwin, S.B.1
-
8
-
-
3743064656
-
-
Working paper series 7.87, Wilfrid Laurier University, Waterloo, Ontario, Canada
-
Harris, C. R., 1987, Routeing flexibility in flexible manufacturing systems, Working paper series 7.87, Wilfrid Laurier University, Waterloo, Ontario, Canada.
-
(1987)
Routeing Flexibility in Flexible Manufacturing Systems
-
-
Harris, C.R.1
-
9
-
-
3743131702
-
A simulation study of sequencing in batch production
-
Hollier, R. H., 1968, A simulation study of sequencing in batch production. Operations Research Quarterly, 19(4), 389-407.
-
(1968)
Operations Research Quarterly
, vol.19
, Issue.4
, pp. 389-407
-
-
Hollier, R.H.1
-
10
-
-
0021424669
-
A comparative study of priority dispatching rules in a hybrid assembly/job shop
-
Huang, P. Y., 1984, A comparative study of priority dispatching rules in a hybrid assembly/job shop. International Journal of Production Research, 22(3), 375-387.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 375-387
-
-
Huang, P.Y.1
-
11
-
-
0020761565
-
The design of an automated material handling system for a job shop
-
Hutchinson, G. K., 1983, The design of an automated material handling system for a job shop. Computers in Industry, 4(2), 139-145.
-
(1983)
Computers in Industry
, vol.4
, Issue.2
, pp. 139-145
-
-
Hutchinson, G.K.1
-
12
-
-
21144480574
-
Improving delivery performance in gear manufacturing at Jeffrey Division of Dresser Industries
-
Hutchinson, G. K., Leong, G. K. and Ward, P. T., 1993, Improving delivery performance in gear manufacturing at Jeffrey Division of Dresser Industries. Interfaces, 23(2), 69-83.
-
(1993)
Interfaces
, vol.23
, Issue.2
, pp. 69-83
-
-
Hutchinson, G.K.1
Leong, G.K.2
Ward, P.T.3
-
14
-
-
0021311118
-
Simulation studies in job shop scheduling, II: Performance of priority rules
-
Kiran, A. S. and Smith, M. L., 1984, Simulation studies in job shop scheduling, II: Performance of priority rules. Computers and Industrial Engineering, 8(2), 87-93.
-
(1984)
Computers and Industrial Engineering
, vol.8
, Issue.2
, pp. 87-93
-
-
Kiran, A.S.1
Smith, M.L.2
-
15
-
-
0346935512
-
Performance of simple priority rule combinations in a flow-dominant shop
-
Laforge, R. L. and Barman, S., 1989, Performance of simple priority rule combinations in a flow-dominant shop. Production and Inventory Management Journal, 30(3), 1-4.
-
(1989)
Production and Inventory Management Journal
, vol.30
, Issue.3
, pp. 1-4
-
-
Laforge, R.L.1
Barman, S.2
-
16
-
-
0002748923
-
Job shop scheduling theory: What is relevant?
-
McKay, K. N., Safayeni, F. R. and Buzacott, J. A., 1988, Job shop scheduling theory: what is relevant? Interfaces, 18(4), 84-90.
-
(1988)
Interfaces
, vol.18
, Issue.4
, pp. 84-90
-
-
Mc Kay, K.N.1
Safayeni, F.R.2
Buzacott, J.A.3
-
18
-
-
0016483405
-
Job shop scheduling: Is manual application of dispatching rules feasible?
-
New, C. C., 1975, Job shop scheduling: is manual application of dispatching rules feasible? Operational Research Quarterly, 26, 35-43.
-
(1975)
Operational Research Quarterly
, vol.26
, pp. 35-43
-
-
New, C.C.1
-
19
-
-
3743096962
-
On the structure and logic of typical material flow system
-
Nof, S. Y. 1982, on the structure and logic of typical material flow system. International Journal of Production Research, 20(5), 575-590.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.5
, pp. 575-590
-
-
Nof, S.Y.1
-
20
-
-
0021155393
-
A survey and evaluation of static flowshop scheduling heuristics
-
Park, Y. B., Pegden, C. D. and Enscore, E. E., 1984, A survey and evaluation of static flowshop scheduling heuristics. International Journal of Production Research, 22(1), 127-141.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.1
, pp. 127-141
-
-
Park, Y.B.1
Pegden, C.D.2
Enscore, E.E.3
-
21
-
-
0020750263
-
Off-line quality control in integrated circuit fabrication using experimental design
-
Phadke, M. S., Kackar, R. N., Speeney, D. V. and Grieco, M. j., 1983, Off-line quality control in integrated circuit fabrication using experimental design. The Bell System Technical Journal, 62(5) 1273-1309.
-
(1983)
The Bell System Technical Journal
, vol.62
, Issue.5
, pp. 1273-1309
-
-
Phadke, M.S.1
Kackar, R.N.2
Speeney, D.V.3
Grieco, M.J.4
-
22
-
-
0043158992
-
An evaluation of vehicle dispatching rules and their effect on shop performance
-
Russell, R. S. and Tanchoco, j. M. A., 1984, An evaluation of vehicle dispatching rules and their effect on shop performance. Material Flow, 1, 271-280.
-
(1984)
Material Flow
, vol.1
, pp. 271-280
-
-
Russell, R.S.1
Tanchoco, J.M.A.2
-
23
-
-
0022412069
-
An evaluation of value based dispatching rules in a flow shop
-
Scudder, G. D. and Hoffmann, T. R., 1985, An evaluation of value based dispatching rules in a flow shop. European Journal of Opertional Research, 22, 310-318
-
(1985)
European Journal of Opertional Research
, vol.22
, pp. 310-318
-
-
Scudder, G.D.1
Hoffmann, T.R.2
-
24
-
-
84952242943
-
Loading and control policies for a flexible manufacturing system
-
Stecke, K. E. and Solberg, j. j., 1981, Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 16(5), 481-490.
-
(1981)
International Journal of Production Research
, vol.16
, Issue.5
, pp. 481-490
-
-
Stecke, K.E.1
Solberg, J.J.2
|