Volumn 48, Issue 2, 1997, Pages 212-220

Two-machine flowshop scheduling to minimize the number of tardy jobs

Author keywords

Flowshop scheduling; Heuristic algorithms; Minimizing tardy jobs

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; MACHINERY; OPTIMIZATION;

EID: 0031070655     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600346     Document Type: Article
Times cited : (17)

References (7)
  • 1
    • 0003075019 scopus 로고
    • Optimal two and three stage productionschedules with setup times included
    • Johnson, S.M., (1954). Optimal two and three stage productionschedules with setup times included. Naval Res Logis 1:61-68
    • (1954) Naval Res Logis , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 2
    • 0345901561 scopus 로고    scopus 로고
    • Sequencing and scheduling: Algorithmsand complexity
    • Lawler, Graves SC, RinnooyKan AHG, Zipkin PH(eds), North Holland, Amsterdam, Netherlands
    • Lawler, E.L., et al(1993). Sequencing and scheduling: algorithmsand complexity. In: Graves SC, RinnooyKan AHG, Zipkin PH(eds). Logistics of Production and Inventory. North Holland, Amsterdam, Netherlands, pp 445-522.
    • Logistics of Production and Inventory , pp. 445-522
    • Lawler, E.L.1
  • 4
    • 0024303819 scopus 로고
    • A branch and boundalgorithm to minimize number of late jobs in a permutationflow-shop
    • Hariri, A.M.A., Potts, C.N., (1989). A branch and boundalgorithm to minimize number of late jobs in a permutationflow-shop. Eur J Opl Res 38: 228-237
    • (1989) Eur J Opl Res , vol.38 , pp. 228-237
    • Hariri, A.M.A.1    Potts, C.N.2
  • 5
    • 0029244346 scopus 로고
    • Flowshop scheduling withdominant machines
    • Ho, J.C., Gupta, J.N.D., (1995). Flowshop scheduling withdominant machines. Comp and Opns Res 15: 237-246
    • (1995) Comp and Opns Res , vol.15 , pp. 237-246
    • Ho, J.C.1    Gupta, J.N.D.2
  • 6
    • 0000062028 scopus 로고
    • Ann-job, one-machine sequencing algorithmfor minimizing the number of late jobs
    • Moore, J.M., (1968).Ann-job, one-machine sequencing algorithmfor minimizing the number of late jobs. Mgmt Sci 15: 102-109
    • (1968) Mgmt Sci , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 7
    • 0000660478 scopus 로고
    • Flow-shopsequencing problems with ordered processing time matrices
    • Smith, M.L., Panwalkar, S.S., Dudek, R.A., (1975). Flow-shopsequencing problems with ordered processing time matrices. Mgmt Sci 21: 544-549
    • (1975) Mgmt Sci , vol.21 , pp. 544-549
    • Smith, M.L.1    Panwalkar, S.S.2    Dudek, R.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.