-
3
-
-
0001391104
-
The decomposition principle for linear programs
-
DANTZIG, G.B., AND P. WOLFE. 1960. The decomposition principle for linear programs. Op. Res. 8:101-111.
-
(1960)
Op. Res.
, vol.8
, pp. 101-111
-
-
Dantzig, G.B.1
Wolfe, P.2
-
4
-
-
0026094050
-
Integrated forest planning across multiple ownerships and decision makers
-
DAVIS, L.S., AND G. LIU. 1991. Integrated forest planning across multiple ownerships and decision makers. FOR. SCI. 37(1):200-226.
-
(1991)
For. Sci.
, vol.37
, Issue.1
, pp. 200-226
-
-
Davis, L.S.1
Liu, G.2
-
5
-
-
0000309235
-
A method for assessment of recoverable volume by log types
-
DEADMAN, M.W., AND C.J. GOULDING. 1979. A method for assessment of recoverable volume by log types. N.Z.J. For. Sci. 9(2):225-239.
-
(1979)
N.Z.J. For. Sci.
, vol.9
, Issue.2
, pp. 225-239
-
-
Deadman, M.W.1
Goulding, C.J.2
-
7
-
-
0021375656
-
Log bucking and lumber manufacturing using dynamic programming
-
FAALAND, B., AND D. BRIGGS. 1984. Log bucking and lumber manufacturing using dynamic programming. Manage. Sci. 30(2):245-257.
-
(1984)
Manage. Sci.
, vol.30
, Issue.2
, pp. 245-257
-
-
Faaland, B.1
Briggs, D.2
-
8
-
-
0011361574
-
A multilevel analysis of production capabilities of the national forest system
-
HOF, J., AND T. BALTIC. 1991. A multilevel analysis of production capabilities of the national forest system. Op. Res. 39(4):543-552.
-
(1991)
Op. Res.
, vol.39
, Issue.4
, pp. 543-552
-
-
Hof, J.1
Baltic, T.2
-
9
-
-
15644364210
-
An iterative multilevel approach to natural resource optimization: A test case
-
HOF, J., B. KENT, AND T. BALTIC. 1992. An iterative multilevel approach to natural resource optimization: a test case. Natur. Resour. Model. 6(1): 1-22.
-
(1992)
Natur. Resour. Model.
, vol.6
, Issue.1
, pp. 1-22
-
-
Hof, J.1
Kent, B.2
Baltic, T.3
-
10
-
-
0242618061
-
A pragmatic multilevel approach to large-scale renewable resource optimization: A test case
-
HOF, J.G., AND J.B. PICKENS. 1987. A pragmatic multilevel approach to large-scale renewable resource optimization: a test case. Natur. Resour. Model. 1(2):245-264.
-
(1987)
Natur. Resour. Model.
, vol.1
, Issue.2
, pp. 245-264
-
-
Hof, J.G.1
Pickens, J.B.2
-
12
-
-
0040943685
-
Two-level planning
-
KORNAI, J., AND T. LIPTAK. 1965. Two-level planning. Econometrica 33(1):141-169.
-
(1965)
Econometrica
, vol.33
, Issue.1
, pp. 141-169
-
-
Kornai, J.1
Liptak, T.2
-
14
-
-
0021452653
-
"Decision Simulators" speed implementation and improve operations
-
LEMBERSKY, M.R., AND U.H. CHI. 1984. "Decision Simulators" speed implementation and improve operations. Interfaces 14(4):1-15.
-
(1984)
Interfaces
, vol.14
, Issue.4
, pp. 1-15
-
-
Lembersky, M.R.1
Chi, U.H.2
-
15
-
-
0022439975
-
Weyerhaeuser decision simulator improves timber profits
-
LEMBERSKY, M.R., AND U.H. CHI. 1986. Weyerhaeuser decision simulator improves timber profits. Interfaces 16(1):6-15.
-
(1986)
Interfaces
, vol.16
, Issue.1
, pp. 6-15
-
-
Lembersky, M.R.1
Chi, U.H.2
-
17
-
-
0022791537
-
A two-stage decision model for log bucking and allocation
-
MENDOZA, G.A., AND B.B. BARE. 1986. A two-stage decision model for log bucking and allocation. For. Prod. J. 36(10):70-74.
-
(1986)
For. Prod. J.
, vol.36
, Issue.10
, pp. 70-74
-
-
Mendoza, G.A.1
Bare, B.B.2
-
18
-
-
0002087283
-
Multi-objective multi-level policy models: An application to regional and environmental planning
-
NIJKAMP, P., AND P. RIETVELD. 1981. Multi-objective multi-level policy models: An application to regional and environmental planning. Eur. Econ. Rev. 15:63-89.
-
(1981)
Eur. Econ. Rev.
, vol.15
, pp. 63-89
-
-
Nijkamp, P.1
Rietveld, P.2
-
19
-
-
84912150130
-
Design of a resource allocation mechanism for multiple use forest planning
-
Kent, B.M., and L.S. Davis (eds.). USDA For. Serv. GTR RM-161
-
PAREDES, G.L. 1988. Design of a resource allocation mechanism for multiple use forest planning. P. 35-45 in The 1988 symposium on systems analysis in forest resources, Kent, B.M., and L.S. Davis (eds.). USDA For. Serv. GTR RM-161.
-
(1988)
The 1988 Symposium on Systems Analysis in Forest Resources
, pp. 35-45
-
-
Paredes, G.L.1
-
21
-
-
5244301251
-
HW-BUCK: A computer game for improving hardwood log bucking skills
-
PICKENS, J.B., G.W. LYON, A. LEE, AND W.E. FRAYER. 1993. HW-BUCK: A computer game for improving hardwood log bucking skills. J. For. 91(8):42-45.
-
(1993)
J. For.
, vol.91
, Issue.8
, pp. 42-45
-
-
Pickens, J.B.1
Lyon, G.W.2
Lee, A.3
Frayer, W.E.4
-
22
-
-
0015300733
-
Dynamic programming in tree bucking
-
PNEVMATICOS, S.M., AND S.H. MANN. 1972. Dynamic programming in tree bucking. For. Prod. J. 22(2):26-30.
-
(1972)
For. Prod. J.
, vol.22
, Issue.2
, pp. 26-30
-
-
Pnevmaticos, S.M.1
Mann, S.H.2
-
23
-
-
0002490175
-
Making better tree-bucking decisions in the woods
-
SESSIONS, J. 1988. Making better tree-bucking decisions in the woods. J. For. 86(10):43-45.
-
(1988)
J. For.
, vol.86
, Issue.10
, pp. 43-45
-
-
Sessions, J.1
-
24
-
-
0024641669
-
Testing computer-aided bucking at the stump
-
SESSIONS, J., J. GARLAND, AND E.D. OLSEN. 1989a. Testing computer-aided bucking at the stump. J. For. 87(4):43-46.
-
(1989)
J. For.
, vol.87
, Issue.4
, pp. 43-46
-
-
Sessions, J.1
Garland, J.2
Olsen, E.D.3
-
25
-
-
0000406619
-
Tree bucking for optimal stand value with log allocation constraints
-
SESSIONS, J., E.D. OLSEN. AND J. GARLAND. 1989b. Tree bucking for optimal stand value with log allocation constraints. For. Sci. 35(1):271-276.
-
(1989)
For. Sci.
, vol.35
, Issue.1
, pp. 271-276
-
-
Sessions, J.1
Olsen, E.D.2
Garland, J.3
-
27
-
-
0242307379
-
Improving profitability by optimizing log-making
-
For. Res. Inst., Rotura. N.Z.
-
TWADDLE, A. A., AND C. J. GOULDING. 1989. Improving profitability by optimizing log-making. N.Z. For. 34(1):17-23. For. Res. Inst., Rotura. N.Z.
-
(1989)
N.Z. For.
, vol.34
, Issue.1
, pp. 17-23
-
-
Twaddle, A.A.1
Goulding, C.J.2
-
28
-
-
0011272235
-
A hierarchical approach to forest planning
-
WEINTRAUB, A., AND A. CHOLAKY. 1991. A hierarchical approach to forest planning. For. Sci. 37(2):439-460.
-
(1991)
For. Sci.
, vol.37
, Issue.2
, pp. 439-460
-
-
Weintraub, A.1
Cholaky, A.2
-
29
-
-
15644379864
-
Iterative multilevel planning with production targets
-
WEITZMAN, M. 1970. Iterative multilevel planning with production targets. Econometrica 38(1):50-65.
-
(1970)
Econometrica
, vol.38
, Issue.1
, pp. 50-65
-
-
Weitzman, M.1
|