-
1
-
-
0028529211
-
Alternative quality improvement practices and organizational performance
-
October
-
Adam, E. E. Jr., 1994, Alternative quality improvement practices and organizational performance. Journal of Operations Management, 12 (1), October, 27-44.
-
(1994)
Journal of Operations Management
, vol.12
, Issue.1
, pp. 27-44
-
-
Adam, E.E.1
-
3
-
-
0347182451
-
Control chart based on the Hodges-Lehmann estimator
-
October
-
Alloway, J. A., and Raghavachari, M., 1991, Control chart based on the Hodges-Lehmann estimator. Journal of Quality Technology, 23 (4), October, 336-347.
-
(1991)
Journal of Quality Technology
, vol.23
, Issue.4
, pp. 336-347
-
-
Alloway, J.A.1
Raghavachari, M.2
-
4
-
-
0003964033
-
-
Cambridge, MA: MIT Center for Advanced Engineering Studies)
-
Deming, W. E., 1986, Out of the Crisis (Cambridge, MA: MIT Center for Advanced Engineering Studies).
-
(1986)
Out of the Crisis
-
-
Deming, W.E.1
-
5
-
-
0025838632
-
Quality monitoring of continuous flow processes
-
English, j., Krishnamurthi, M., and Sastri, T., 1991, Quality monitoring of continuous flow processes. Computers and Industrial Engineering, 20 (2), 251-260.
-
(1991)
Computers and Industrial Engineering
, vol.20
, Issue.2
, pp. 251-260
-
-
English, J.1
Krishnamurthi, M.2
Sastri, T.3
-
7
-
-
84887276418
-
An examination of the relationship between conformance and quality-related costs: Evaluating the Lundvall-Juran curve
-
Foster, S. T. Jr., 1996, An examination of the relationship between conformance and quality-related costs: evaluating the Lundvall-Juran curve. International Journal of Quality and Reliability Management, 13 (5), 49-63.
-
(1996)
International Journal of Quality and Reliability Management
, vol.13
, Issue.5
, pp. 49-63
-
-
Foster, S.T.1
-
8
-
-
0026913067
-
Utilizing a knowledge based decision support system as quality management consultant
-
September
-
Franz, L. S., and Foster, S. T. Jr., 1992, Utilizing a knowledge based decision support system as quality management consultant. International Journal of Production Research, 30 (9), September, 2159-2171.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.9
, pp. 2159-2171
-
-
Franz, L.S.1
Foster, S.T.2
-
10
-
-
0011498753
-
A control chart based on ranks
-
April
-
H ackl, P., and Ledolter, J., 1991, A control chart based on ranks. Journal of Quality Technology, 23 (2), April, 117-124.
-
(1991)
Journal of Quality Technology
, vol.23
, Issue.2
, pp. 117-124
-
-
Hackl, P.1
Ledolter, J.2
-
12
-
-
0027116148
-
Sampling for quality inspection and correction
-
November
-
Kleijnen, J., Kreins, J., Lafleur, M., and Pardoel, J., 1992, Sampling for quality inspection and correction. European Journal of Operational Research, 62 (3), November, 372-379.
-
(1992)
European Journal of Operational Research
, vol.62
, Issue.3
, pp. 372-379
-
-
Kleijnen, J.1
Kreins, J.2
Lafleur, M.3
Pardoel, J.4
-
13
-
-
0025262620
-
A computer-automated statistical process control method with timely response
-
Papadakis, E. P., 1990, A computer-automated statistical process control method with timely response. Engineering Costs and Production Economics, 18 (3), 301-310.
-
(1990)
Engineering Costs and Production Economics
, vol.18
, Issue.3
, pp. 301-310
-
-
Papadakis, E.P.1
-
14
-
-
0000313624
-
A comparison of neural networks to SPC charts
-
Pugh, G. A., 1991, A comparison of neural networks to SPC charts. Computers and Industrial Engineering, 21 (4), 253-255.
-
(1991)
Computers and Industrial Engineering
, vol.21
, Issue.4
, pp. 253-255
-
-
Pugh, G.A.1
-
15
-
-
85010525118
-
-
September, New Mexico
-
Sematech Defect Workshop, 1987, September, New Mexico.
-
(1987)
-
-
-
16
-
-
0020182981
-
Evolution and accomplishments of VLSI yield management at IBM
-
September
-
Stapper, C. H., Castrucci, P., Maeder, R., Rowe, W., and Verhelst, R., 1982, Evolution and accomplishments of VLSI yield management at IBM. IBM Journal of Research Development, 26 (5), September.
-
(1982)
IBM Journal of Research Development
, vol.26
, Issue.5
-
-
Stapper, C.H.1
Castrucci, P.2
Maeder, R.3
Rowe, W.4
Verhelst, R.5
|