-
1
-
-
0020163028
-
The two product, single machine, static demand, infinite horizon lot scheduling problem
-
BOCTOR, F., 1982, The two product, single machine, static demand, infinite horizon lot scheduling problem. Management Science, 28, 798-807.
-
(1982)
Management Science
, vol.28
, pp. 798-807
-
-
Boctor, F.1
-
2
-
-
0000326705
-
A dynamic programming approach to a lot size scheduling problem
-
BOMBERGER, E., 1966, A dynamic programming approach to a lot size scheduling problem. Management Science, 23, 778-784.
-
(1966)
Management Science
, vol.23
, pp. 778-784
-
-
Bomberger, E.1
-
3
-
-
0001923235
-
An application of bin-packing to multiprocessor scheduling
-
COFFMAN, E. G., GAREY, M. R., and JOHNSON, D. S., 1978, An application of bin-packing to multiprocessor scheduling. SIAM Journal on Computing, 7, 1-17.
-
(1978)
SIAM Journal on Computing
, vol.7
, pp. 1-17
-
-
Coffman, E.G.1
Garey, M.R.2
Johnson, D.S.3
-
4
-
-
0023420909
-
The economic lot scheduling problem: Achieving feasibility using time-varying lot sizes
-
DOBSON, G., 1987, The economic lot scheduling problem: achieving feasibility using time-varying lot sizes. Operations Research, 35, 764-771.
-
(1987)
Operations Research
, vol.35
, pp. 764-771
-
-
Dobson, G.1
-
5
-
-
0000413306
-
Economic batch size determination of multi-product scheduling
-
EILON, S., 1958, Economic batch size determination of multi-product scheduling. Operational Research Quarterly, 10, 217-227.
-
(1958)
Operational Research Quarterly
, vol.10
, pp. 217-227
-
-
Eilon, S.1
-
6
-
-
0017931081
-
The economic lot scheduling problem: Review and extensions
-
ELMAGHRABY, S. E., 1978, The economic lot scheduling problem: review and extensions. Management Science, 24, 587-598.
-
(1978)
Management Science
, vol.24
, pp. 587-598
-
-
Elmaghraby, S.E.1
-
7
-
-
3142723111
-
On the joint lot-sizing problem with zero setup costs
-
ERENGUC, S. S. and MERCAN, H. M., 1989, On the joint lot-sizing problem with zero setup costs. Decision Sciences, 20, 669-676.
-
(1989)
Decision Sciences
, vol.20
, pp. 669-676
-
-
Erenguc, S.S.1
Mercan, H.M.2
-
8
-
-
0025564737
-
Scheduling the production of several items with random demands in a single facility
-
GALLEGO, G., 1990, Scheduling the production of several items with random demands in a single facility. Management Science, 36, 1579-1592.
-
(1990)
Management Science
, vol.36
, pp. 1579-1592
-
-
Gallego, G.1
-
9
-
-
0026930528
-
Feasibility of scheduling lot sizes of three products on one machine
-
GLASS, C. A., 1992, Feasibility of scheduling lot sizes of three products on one machine. Management Science, 38, 1482-1494.
-
(1992)
Management Science
, vol.38
, pp. 1482-1494
-
-
Glass, C.A.1
-
10
-
-
0018724120
-
An improved extended basic period procedure for solving the economic lot scheduling problem
-
HAESSLER, R. W., 1979, An improved extended basic period procedure for solving the economic lot scheduling problem. AIIE Transactions, 11, 336-340.
-
(1979)
AIIE Transactions
, vol.11
, pp. 336-340
-
-
Haessler, R.W.1
-
11
-
-
0024619851
-
When is the ELSP easy?
-
JONES, P. and INMAN, R., 1989, When is the ELSP easy? IIE Transactions, 21, 11-20.
-
(1989)
IIE Transactions
, vol.21
, pp. 11-20
-
-
Jones, P.1
Inman, R.2
-
12
-
-
84990623219
-
Integrative cycle scheduling approach for a capacitated flexible assembly system
-
KIM, D., MABERT, V. A., and PINTO, P., 1993, Integrative cycle scheduling approach for a capacitated flexible assembly system. Decision Sciences, 24, 126-147.
-
(1993)
Decision Sciences
, vol.24
, pp. 126-147
-
-
Kim, D.1
Mabert, V.A.2
Pinto, P.3
-
13
-
-
0023643557
-
Production batch sizes in a repetitive flexible assembly system
-
MABERT, V. A. and PINTO, P. A., 1987, Production batch sizes in a repetitive flexible assembly system. Production and Inventory Management, 28, 34-37.
-
(1987)
Production and Inventory Management
, vol.28
, pp. 34-37
-
-
Mabert, V.A.1
Pinto, P.A.2
-
14
-
-
0021581827
-
A stepwise partial enumeration algorithm for the economic lot scheduling problem
-
PARK, K. and YUN, D., 1984, A stepwise partial enumeration algorithm for the economic lot scheduling problem. IIE Transactions, 16, 363-370.
-
(1984)
IIE Transactions
, vol.16
, pp. 363-370
-
-
Park, K.1
Yun, D.2
-
15
-
-
84985748301
-
Solving the economic lot scheduling problem using the method of prime subperiods
-
PHILIPOOM, P. R., REES, L. P., and TAYLOR, B. W., 1989, Solving the economic lot scheduling problem using the method of prime subperiods. Decision Sciences, 20, 794-809.
-
(1989)
Decision Sciences
, vol.20
, pp. 794-809
-
-
Philipoom, P.R.1
Rees, L.P.2
Taylor, B.W.3
-
16
-
-
84985817984
-
A joint lot sizing rule for fixed labor cost situations
-
PINTO, P. A. and MABERT, V. A., 1986, A joint lot sizing rule for fixed labor cost situations. Decision Sciences, 17, 139-150.
-
(1986)
Decision Sciences
, vol.17
, pp. 139-150
-
-
Pinto, P.A.1
Mabert, V.A.2
-
17
-
-
0001343645
-
Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems
-
ROUNDY, R., 1989, Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems. Management Science, 35, 1433-1442.
-
(1989)
Management Science
, vol.35
, pp. 1433-1442
-
-
Roundy, R.1
-
18
-
-
0019286974
-
Scheduling components for group technology lines
-
SPENCER, M. S., 1980, Scheduling components for group technology lines. Production and Inventory Management, 21, 43-49.
-
(1980)
Production and Inventory Management
, vol.21
, pp. 43-49
-
-
Spencer, M.S.1
-
19
-
-
0002144959
-
Computing optimal lot sizes in the economic lot scheduling problem
-
ZIPKIN, P., 1991, Computing optimal lot sizes in the economic lot scheduling problem. Operations Research, 39, 56-63.
-
(1991)
Operations Research
, vol.39
, pp. 56-63
-
-
Zipkin, P.1
|