|
Volumn , Issue , 1997, Pages 869-877
|
Implementation of an advanced multi-lateral system with coiled tubing accessibility
a a a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
EQUIPMENT TESTING;
FLOW CONTROL;
INSTALLATION;
MAINTENANCE;
OIL WELL CASINGS;
OIL WELL COMPLETION;
OIL WELL DRILLING;
PETROLEUM RESERVOIRS;
CASING WINDOW;
COILED TUBING;
DRILLING WHIPSTOCK;
LATERAL ACCESS SYSTEM;
WINDOW LATCH COUPLING;
OIL FIELD EQUIPMENT;
|
EID: 0030737222
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2523/37673-ms Document Type: Conference Paper |
Times cited : (1)
|
References (0)
|