메뉴 건너뛰기




Volumn 358, Issue , 1997, Pages 25-28

Implementation of a risk-informed isi program at surry power station

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; NUCLEAR POWER PLANTS; PILOT PLANTS; RISK ASSESSMENT;

EID: 0030677314     PISSN: 0277027X     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Article
Times cited : (4)

References (4)
  • 4
    • 0027239153 scopus 로고
    • Prioritizing Aged Piping for Inspection Using a Simple Probabilistic Structural Analysis Model
    • Bishop, B. A., and Phillips, J. H., 1993, "Prioritizing Aged Piping for Inspection Using a Simple Probabilistic Structural Analysis Model," ASME PVP-Vol. 251, Reliability and Risk in Pressure Vessels and Piping.
    • (1993) Reliability and Risk in Pressure Vessels and Piping , vol.251 ASME PVP
    • Bishop, B.A.1    Phillips, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.