Volumn , Issue 3, 1997, Pages 4-11

Converting AC power lines to DC for higher transmission ratings

Author keywords

[No Author keywords available]

Indexed keywords

PHASE TO GROUND CLEARANCE;

EID: 0030675581     PISSN: 10133119     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (33)

References (10)
  • 3
    • 84945719087 scopus 로고
    • Feasibility study of converting one circuit of a double-circuit AC line to DC operation
    • Canadian Electrical Association Toronto, March
    • J. S. McConnach, K. G. Ringler: Feasibility study of converting one circuit of a double-circuit AC line to DC operation. Transmission & Stations Planning & Operation Subsection, Canadian Electrical Association Toronto, March 1986.
    • (1986) Transmission & Stations Planning & Operation Subsection
    • McConnach, J.S.1    Ringler, K.G.2
  • 4
    • 0025748204 scopus 로고
    • HVDC conversion of HVAC lines to provide substantial power upgrading
    • January
    • A. Clerici, L. Paris, P. Danfors: HVDC conversion of HVAC lines to provide substantial power upgrading. IEEE Transactions on Power Delivery, Vol. 6, No 1, January 1991.
    • (1991) IEEE Transactions on Power Delivery , vol.6 , Issue.1
    • Clerici, A.1    Paris, L.2    Danfors, P.3
  • 5
    • 0343098893 scopus 로고
    • Based on HVDC Transmission Research Project RP 104, Palo Alto, USA
    • EPRI. Transmission Line Reference Book, HVDC to ± 600 kV. Based on HVDC Transmission Research Project RP 104, Palo Alto, USA (1976).
    • (1976) Transmission Line Reference Book, HVDC to ± 600 kV
  • 8
    • 3142639936 scopus 로고
    • Konsequenzen der Festlegung von Feld-Grenzwerten auf die Praxis der Stromversorgung
    • G. Newi: Konsequenzen der Festlegung von Feld-Grenzwerten auf die Praxis der Stromversorgung. Elektrizitätswirtschaft 94 (1995), 1336-1341.
    • (1995) Elektrizitätswirtschaft , vol.94 , pp. 1336-1341
    • Newi, G.1
  • 10
    • 0029237434 scopus 로고    scopus 로고
    • Raising 110-kV power line towers without downtime
    • W. Krischke: Raising 110-kV power line towers without downtime. ABB Review 4/95, 26-30.
    • ABB Review , vol.4 , Issue.95 , pp. 26-30
    • Krischke, W.1