메뉴 건너뛰기




Volumn 45, Issue 1, 1997, Pages 66-71

Single machine scheduling problems with general breakdowns, earliness and tardiness costs

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COST EFFECTIVENESS; OPERATIONS RESEARCH; OPTIMIZATION; PROCESS CONTROL; SCHEDULING;

EID: 0030674930     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.45.1.66     Document Type: Article
Times cited : (24)

References (24)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • BAKER, K., AND G. SCUDDER. 1990. Sequencing with Earliness and Tardiness Penalties: A Review. Opns. Res. 38, 22-36.
    • (1990) Opns. Res. , vol.38 , pp. 22-36
    • Baker, K.1    Scudder, G.2
  • 4
    • 17144411719 scopus 로고
    • Scheduling jobs subject to contagious breakdowns
    • BROWNE, S., AND K. GLAZEBROOK. 1992. Scheduling Jobs Subject to Contagious Breakdowns. To appear in Naval Res. Logist.
    • (1992) Naval Res. Logist.
    • Browne, S.1    Glazebrook, K.2
  • 5
    • 0001706406 scopus 로고    scopus 로고
    • The stochastic economic lot scheduling problem: Cyclical base-stock policies with idle times
    • FEDERGRUEN, A., AND Z. KATALAN. 1996. The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times. Man. Sci. 42, 783-796.
    • (1996) Man. Sci. , vol.42 , pp. 783-796
    • Federgruen, A.1    Katalan, Z.2
  • 6
    • 0027886805 scopus 로고
    • Simultaneous optimization of efficiency and performance balance measures in single machine scheduling problems
    • FEDERGRUEN, A., AND G. MOSHEIOV. 1993a. Simultaneous Optimization of Efficiency and Performance Balance Measures in Single Machine Scheduling Problems. Naval Res. Logist. 40, 951-970.
    • (1993) Naval Res. Logist. , vol.40 , pp. 951-970
    • Federgruen, A.1    Mosheiov, G.2
  • 8
    • 0018481074 scopus 로고
    • On the characterization of point processes with the order statistic property
    • FEIGIN, P. 1979. On the Characterization of Point Processes with the Order Statistic Property. J. Appl. Prob. 16, 297-304.
    • (1979) J. Appl. Prob. , vol.16 , pp. 297-304
    • Feigin, P.1
  • 9
    • 84972037062 scopus 로고
    • Stochastic sequencing on one machine with earliness and tardiness penalties
    • FORST, F. G. 1993, Stochastic Sequencing on One Machine with Earliness and Tardiness Penalties. Prob. Engr. and Inf. Sci. 7, 291-300.
    • (1993) Prob. Engr. and Inf. Sci. , vol.7 , pp. 291-300
    • Forst, F.G.1
  • 11
    • 0021444223 scopus 로고
    • Scheduling stochastic jobs on a Single Machine Subject to Breakdowns
    • GLAZEBROOK, K. 1984. Scheduling Stochastic Jobs on a Single Machine Subject to Breakdowns. Naval Res. Logist. 31, 251-264.
    • (1984) Naval Res. Logist. , vol.31 , pp. 251-264
    • Glazebrook, K.1
  • 12
    • 0023367406 scopus 로고
    • Evaluating the effects of machine breakdowns in stochastic scheduling problems
    • GLAZEBROOK, K. 1987. Evaluating the Effects of Machine Breakdowns in Stochastic Scheduling Problems. Naval Res. Logist. 34, 319-355.
    • (1987) Naval Res. Logist. , vol.34 , pp. 319-355
    • Glazebrook, K.1
  • 13
    • 0027256856 scopus 로고
    • Scheduling with monotonous earliness and tardiness penalties
    • KAHLBACHER, H. 1992. Scheduling with Monotonous Earliness and Tardiness Penalties. Eur. J. Opnl. Res. 64, 258-277.
    • (1992) Eur. J. Opnl. Res. , vol.64 , pp. 258-277
    • Kahlbacher, H.1
  • 14
    • 3643061275 scopus 로고
    • Deterministic and random single machine scheduling with due dates and general penalty functions
    • Dept. of Decision Sciences and Engineering Systems, Rensselaer Polytechnic Institute, Troy, New York
    • KRIEGER, A., AND M. RAGHAVACHARI. 1988. Deterministic and Random Single Machine Scheduling with Due Dates and General Penalty Functions. Technical Report, Dept. of Decision Sciences and Engineering Systems, Rensselaer Polytechnic Institute, Troy, New York.
    • (1988) Technical Report
    • Krieger, A.1    Raghavachari, M.2
  • 15
    • 0001002199 scopus 로고
    • Stochastic single machine scheduling with quadratic early-tardy penalties
    • MITTENTHAL, J., AND M. RAGHAVACHARI. 1993. Stochastic Single Machine Scheduling with Quadratic Early-tardy Penalties. Opns. Res. 41, 786-796.
    • (1993) Opns. Res. , vol.41 , pp. 786-796
    • Mittenthal, J.1    Raghavachari, M.2
  • 16
    • 0040680088 scopus 로고
    • Optimal policies in stochastic shop scheduling
    • Stochastics and Optimization, F. Archetti and F. Maffioli eds.
    • PINEDO, M. 1984. Optimal Policies in Stochastic Shop Scheduling. In Stochastics and Optimization, F. Archetti and F. Maffioli eds. Anns. Opns. Res. 1, 305-329.
    • (1984) Anns. Opns. Res. , vol.1 , pp. 305-329
    • Pinedo, M.1
  • 17
    • 0002472057 scopus 로고
    • A note on stochastic scheduling on a single machine subject to breakdown and repair
    • PINEDO, M., AND E. RAMMOUZ. 1988. A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair. Prob. Eng. Inf. Sci. 2, 41-49.
    • (1988) Prob. Eng. Inf. Sci. , vol.2 , pp. 41-49
    • Pinedo, M.1    Rammouz, E.2
  • 18
    • 77957821624 scopus 로고
    • Global optimization
    • Chapter IX G. Nemhauser, A. Rinnooy Kan and M. Todd (eds.). North Holland, Amsterdam
    • RINNOOY KAN, A., AND G. TIMMER. 1989. Global Optimization. Chapter IX in Handbook in Operations Research and Management Science 1. G. Nemhauser, A. Rinnooy Kan and M. Todd (eds.). North Holland, Amsterdam.
    • (1989) Handbook in Operations Research and Management Science , vol.1
    • Rinnooy Kan, A.1    Timmer, G.2
  • 19
    • 0000872615 scopus 로고
    • 1-martingales in stochastic optimization problems
    • 1-Martingales in Stochastic Optimization Problems. Math. Prog. Study 6, 170-187. Also in R. Wets (ed.). Stochastic Systems: Modeling, Identification and Optimization. North-Holland, Amsterdam.
    • (1976) Math. Prog. Study , vol.6 , pp. 170-187
    • Rockefellar, R.1    Wets, R.2
  • 22
    • 84974185377 scopus 로고
    • Spatiotemporal convexity of stochastic processes and applications
    • SHANTHIKUMAR, G., AND D. VAG. 1992. Spatiotemporal Convexity of Stochastic Processes and Applications. Prob. Engr. and Inf. Sci. 6, 1-16.
    • (1992) Prob. Engr. and Inf. Sci. , vol.6 , pp. 1-16
    • Shanthikumar, G.1    Vag, D.2
  • 24
    • 0001000997 scopus 로고
    • Comparing counting processes and queues
    • WHITT, W. 1981. Comparing Counting Processes and Queues. Adv. Appl. Prob. 13, 207-220.
    • (1981) Adv. Appl. Prob. , vol.13 , pp. 207-220
    • Whitt, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.