메뉴 건너뛰기




Volumn 46, Issue 1, 1997, Pages

A decision support system for ship maintenance capacity planning

Author keywords

Computer aided planning; Maintenance; Scheduling

Indexed keywords

ALGORITHMS; COMPUTER AIDED MANUFACTURING; CONSTRAINT THEORY; DATABASE SYSTEMS; DECISION MAKING; MAINTENANCE; PROCESS CONTROL; PROJECT MANAGEMENT; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0030648696     PISSN: 00078506     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0007-8506(07)60850-6     Document Type: Article
Times cited : (21)

References (12)
  • 1
    • 0030395219 scopus 로고    scopus 로고
    • Flexibility and its measurement
    • CHRYSSOLOURIS, G. Flexibility and its measurement. Annals of CIRP 45/2/1996 (1996), 581-587.
    • (1996) Annals of CIRP , vol.45 , Issue.2-1996 , pp. 581-587
    • Chryssolouris, G.1
  • 2
    • 0343334676 scopus 로고
    • Experiences with a multi-indentured, multi-echelon inventory model
    • L. Schwarz, Ed. North-Holland
    • CLARK, A. Experiences with a multi-indentured, multi-echelon inventory model. In Multi-Level Production/Inventory Systems: Theory and Practice., L. Schwarz, Ed. North-Holland, 1981, pp. 299-330.
    • (1981) Multi-Level Production/Inventory Systems: Theory and Practice , pp. 299-330
    • Clark, A.1
  • 3
    • 0042010472 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Department of Applied Economics, Katholieke Universiteit Leuven
    • DEMEULEMESTER, E., HERROELEN, W. New benchmark results for the resource-constrained project scheduling problem. Tech. Rep. 9521, Department of Applied Economics, Katholieke Universiteit Leuven, 1996.
    • (1996) Tech. Rep. 9521
    • Demeulemester, E.1    Herroelen, W.2
  • 6
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • To appear
    • KOLISCH, R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. To appear in: European Journal of Operational Research.
    • European Journal of Operational Research
    • Kolisch, R.1
  • 7
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive search for solving hard project scheduling problems
    • KOLISCH, R., DREXL, A. Adaptive search for solving hard project scheduling problems. Naval Research Logistics 43 (1996), 23-40.
    • (1996) Naval Research Logistics , vol.43 , pp. 23-40
    • Kolisch, R.1    Drexl, A.2
  • 8
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li, R.-Y., WILLIS, J. An iterative scheduling technique for resource-constrained project scheduling. European Journal of Operational Research 56 (1992), 370-379.
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, R.-Y.1    Willis, J.2
  • 10
    • 0042359839 scopus 로고
    • An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation
    • Department of Mathematics, University of Bologna
    • MINGOZZI, A., MANIEZZO, V., RICCIARDELLI, S., BIANCO, L. An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation. Tech. Rep. 32, Department of Mathematics, University of Bologna, 1994.
    • (1994) Tech. Rep. 32
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 12
    • 0029708788 scopus 로고    scopus 로고
    • Re-engineering production systems: The Royal Netherlands Naval Dockyard
    • ZIJM, W. Re-engineering production systems: The Royal Netherlands Naval Dockyard. Annals of CIRP 45/1/1996 (1996), 427-432.
    • (1996) Annals of CIRP , vol.45 , Issue.1-1996 , pp. 427-432
    • Zijm, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.