메뉴 건너뛰기




Volumn 31, Issue 4 PART A, 1997, Pages 335-348

Planning Australian freight rail operations: An overview

Author keywords

[No Author keywords available]

Indexed keywords

FREIGHT RAIL OPERATIONS PLANNING; TRACK MAINTENANCE PLANNING;

EID: 0030615841     PISSN: 09658564     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0965-8564(96)00026-2     Document Type: Article
Times cited : (28)

References (59)
  • 1
    • 8344265734 scopus 로고
    • Track maintenance to match the traffic task
    • Rail Track Association Australia, Sydney
    • Bell, F. and Marsden, B. (1990) Track maintenance to match the traffic task. Eighth International Rail Track Conference. Rail Track Association Australia, Sydney.
    • (1990) Eighth International Rail Track Conference
    • Bell, F.1    Marsden, B.2
  • 3
    • 0019070271 scopus 로고
    • The solution of a railway locomotive scheduling problem
    • Booler, J. P. (1980) The solution of a railway locomotive scheduling problem. Journal of the Operational Research Society 31, 943-948.
    • (1980) Journal of the Operational Research Society , vol.31 , pp. 943-948
    • Booler, J.P.1
  • 4
    • 0041487329 scopus 로고
    • International performance indicators: Rail freight update
    • AGPS, Canberra
    • Bureau of Industry Economics (1993) International Performance Indicators: Rail Freight Update, Research Report 52. AGPS, Canberra.
    • (1993) Research Report , vol.52
  • 5
    • 0041495017 scopus 로고
    • Working Paper 14.2. AGPS, Canberra
    • Bureau of Transport and Communications Economics (1995) Adequacy of transport infrastructure: rail. Working Paper 14.2. AGPS, Canberra.
    • (1995) Adequacy of Transport Infrastructure: Rail
  • 7
    • 0025512036 scopus 로고
    • Two moments estimation of delay on single-track rail lines with scheduled traffic
    • Chen, B. and Harker, P. (1990) Two moments estimation of delay on single-track rail lines with scheduled traffic. Transportation Science 24, 261-275.
    • (1990) Transportation Science , vol.24 , pp. 261-275
    • Chen, B.1    Harker, P.2
  • 8
    • 0041487324 scopus 로고
    • Designing rail services: An 'academic' research perspective, directions
    • University of Pennsylvania, Philadelphia
    • Crainic, T. G. (1995) Designing rail services: an 'academic' research perspective, directions. In Service Design and Management in Railroad Operations Workshop. University of Pennsylvania, Philadelphia.
    • (1995) Service Design and Management in Railroad Operations Workshop.
    • Crainic, T.G.1
  • 9
    • 0021423812 scopus 로고
    • A tactical planning model for rail freight transportation
    • Crainic, T. G., Ferland, J. A. and Rousseau, J. (1984) A tactical planning model for rail freight transportation. Transportation Science 18, 165-184.
    • (1984) Transportation Science , vol.18 , pp. 165-184
    • Crainic, T.G.1    Ferland, J.A.2    Rousseau, J.3
  • 10
    • 0025386354 scopus 로고
    • A model for the strategic planning of national freight transportation by rail
    • Crainic, T. G., Florian, M. and Leal, J.-E. (1990) A model for the strategic planning of national freight transportation by rail. Transportation Science 24(1), 1-24.
    • (1990) Transportation Science , vol.24 , Issue.1 , pp. 1-24
    • Crainic, T.G.1    Florian, M.2    Leal, J.-E.3
  • 11
    • 0042489206 scopus 로고
    • Multi commodity, multi mode freight transportation: A general modelling and algorithmic framework for the service network design problem
    • Crainic, T. and Rousseau, J. (1986) Multi commodity, multi mode freight transportation: a general modelling and algorithmic framework for the service network design problem. Transportation Research B 20, 242-255.
    • (1986) Transportation Research B , vol.20 , pp. 242-255
    • Crainic, T.1    Rousseau, J.2
  • 15
    • 0006847568 scopus 로고
    • Application of dynamic programming and other mathematical techniques to pavement management systems
    • Feighan, K., Shahin, M., Sinha, K. and White, T. (1988) Application of dynamic programming and other mathematical techniques to pavement management systems. Transportation Research Record 1200, 90-98.
    • (1988) Transportation Research Record , vol.1200 , pp. 90-98
    • Feighan, K.1    Shahin, M.2    Sinha, K.3    White, T.4
  • 16
    • 0041988344 scopus 로고    scopus 로고
    • Modelling rail track deterioration and maintenance: Current practices and future needs
    • forthcoming
    • Ferreira, L. and Murray, M. (1997) Modelling rail track deterioration and maintenance: current practices and future needs. Transport Reviews, (forthcoming).
    • (1997) Transport Reviews
    • Ferreira, L.1    Murray, M.2
  • 17
    • 84950041951 scopus 로고
    • Measuring the performance of intermodal freight terminals
    • Ferreira, L. and Sigut, J. (1993) Measuring the performance of intermodal freight terminals. Transportation Planning and Technology 17(3), 268-279.
    • (1993) Transportation Planning and Technology , vol.17 , Issue.3 , pp. 268-279
    • Ferreira, L.1    Sigut, J.2
  • 18
    • 0009304187 scopus 로고
    • Modelling intermodal freight terminal operations
    • Ferreira, L. and Sigut, J. (1995) Modelling intermodal freight terminal operations. Road and Transport Research 4(4), 4-16.
    • (1995) Road and Transport Research , vol.4 , Issue.4 , pp. 4-16
    • Ferreira, L.1    Sigut, J.2
  • 19
    • 0027722751 scopus 로고
    • Towards rail freight profitability in Australia
    • Ferreira, L. and Otway, N. (1993) Towards rail freight profitability in Australia. Transport Reviews 13(4), 91-106.
    • (1993) Transport Reviews , vol.13 , Issue.4 , pp. 91-106
    • Ferreira, L.1    Otway, N.2
  • 21
    • 0041988345 scopus 로고
    • Optimal control on a graph with application to train scheduling
    • Goh, C. J. and Mees, A. I. (1991) Optimal control on a graph with application to train scheduling. Mathematical Computer Modelling 15, 49-58.
    • (1991) Mathematical Computer Modelling , vol.15 , pp. 49-58
    • Goh, C.J.1    Mees, A.I.2
  • 22
    • 0024856116 scopus 로고
    • Formulation and solution of a combined train routing and makeup, and empty car distribution model
    • Haghani, A. E. (1989) Formulation and solution of a combined train routing and makeup, and empty car distribution model. Transportation Research B 23, 433-452.
    • (1989) Transportation Research B , vol.23 , pp. 433-452
    • Haghani, A.E.1
  • 25
    • 0042989965 scopus 로고
    • Development of a model to optimise the position of crossing and overtaking loops on a single line railway
    • Queensland University of Technology, Brisbane
    • Higgins, A., Kozan, E. and Ferreira, L. (1994) Development of a model to optimise the position of crossing and overtaking loops on a single line railway. Physical Infrastructure Research Report, 16-94. Queensland University of Technology, Brisbane.
    • (1994) Physical Infrastructure Research Report , pp. 16-94
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 26
    • 0029333123 scopus 로고
    • Modelling single line train operations
    • Railroad Transportation Research, Transportation Research Board, Washington DC
    • Higgins, A., Ferreira, L. and Kozan, E. (1995a) Modelling single line train operations. Transportation Research Record 1484, Railroad Transportation Research, 9-16. Transportation Research Board, Washington DC.
    • (1995) Transportation Research Record 1484 , pp. 9-16
    • Higgins, A.1    Ferreira, L.2    Kozan, E.3
  • 28
    • 0042005121 scopus 로고
    • Rescheduling of trains on a single line track: Improved heuristic solution techniques
    • Queensland University of Technology, Brisbane
    • Higgins, A., Kozan, E. and Ferreira, L. (1995c) Rescheduling of trains on a single line track: Improved heuristic solution techniques. Physical Infrastructure Research Report, 1-95. Queensland University of Technology, Brisbane.
    • (1995) Physical Infrastructure Research Report , pp. 1-95
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 30
    • 0041487327 scopus 로고
    • MARPAS relates track costs to traffic
    • London
    • Hope, R. (1992) MARPAS relates track costs to traffic. Railway Gazette International. London.
    • (1992) Railway Gazette International
    • Hope, R.1
  • 31
    • 41049096052 scopus 로고
    • AGPS, Canberra
    • Industry Commission (1991) Rail Transport. AGPS, Canberra.
    • (1991) Rail Transport
  • 34
    • 0026104713 scopus 로고
    • Tactical scheduling of rail operations: The SCAN I system
    • Jovanovic, D. and Harker, P. (1991) Tactical scheduling of rail operations: The SCAN I system. Transportation Science 25, 46-64.
    • (1991) Transportation Science , vol.25 , pp. 46-64
    • Jovanovic, D.1    Harker, P.2
  • 35
    • 0026945296 scopus 로고
    • Designing railroad operating plans: A dual adjustment method for implementing lagrangian relaxation
    • Keaton, M. E. (1992) Designing railroad operating plans: a dual adjustment method for implementing lagrangian relaxation. Transportation Science 26, 263-279.
    • (1992) Transportation Science , vol.26 , pp. 263-279
    • Keaton, M.E.1
  • 36
    • 0002175846 scopus 로고
    • Optimal pacing of trains in freight railroads
    • Kraay, D., Harker, P. and Chen, B. (1991) Optimal pacing of trains in freight railroads. Operations Research 39, 82-99.
    • (1991) Operations Research , vol.39 , pp. 82-99
    • Kraay, D.1    Harker, P.2    Chen, B.3
  • 38
    • 0012634684 scopus 로고
    • Analytical models for rail line capacity analysis
    • Kraft, E. R. (1983) Analytical models for rail line capacity analysis. Transportation Research Forum Proceedings 24, 153-162.
    • (1983) Transportation Research Forum Proceedings , vol.24 , pp. 153-162
    • Kraft, E.R.1
  • 39
    • 38249008808 scopus 로고
    • Rail freight service productivity from the manager's perspective
    • Martland, C. D. (1992) Rail freight service productivity from the manager's perspective. Transportation Research A 26, 457-469.
    • (1992) Transportation Research A , vol.26 , pp. 457-469
    • Martland, C.D.1
  • 43
    • 0002699729 scopus 로고
    • Railway scheduling by network optimisation
    • Mees, A. I. (1991) Railway scheduling by network optimisation. Mathematical Computer Modelling 15, 33-41.
    • (1991) Mathematical Computer Modelling , vol.15 , pp. 33-41
    • Mees, A.I.1
  • 46
    • 0042989967 scopus 로고
    • National Rail Corporation Ltd, Sydney
    • National Rail Corporation (1995) Corporate Plan 4. National Rail Corporation Ltd, Sydney.
    • (1995) Corporate Plan 4 , vol.4
  • 47
    • 0017458041 scopus 로고
    • Railyard modelling: Part 1, prediction of put-through time
    • Petersen, E. R. (1977a) Railyard modelling: Part 1, prediction of put-through time. Transportation Science 11, 37-49.
    • (1977) Transportation Science , vol.11 , pp. 37-49
    • Petersen, E.R.1
  • 48
    • 0017460352 scopus 로고
    • Railyard modelling: Part 2, the effect of yard facilities on congestion
    • Petersen, E. R. (1977b) Railyard modelling: Part 2, the effect of yard facilities on congestion. Transportation Science 11, 50-59.
    • (1977) Transportation Science , vol.11 , pp. 50-59
    • Petersen, E.R.1
  • 49
    • 0020128317 scopus 로고
    • A structured model for rail line simulation and optimisation
    • Petersen, E. R. and Taylor, A. J. (1982) A structured model for rail line simulation and optimisation. Transportation Science 16, 192-205.
    • (1982) Transportation Science , vol.16 , pp. 192-205
    • Petersen, E.R.1    Taylor, A.J.2
  • 50
    • 0023163047 scopus 로고
    • Design of a single-track rail line for high speed trains
    • Petersen, E. R. and Taylor, A. J. (1987) Design of a single-track rail line for high speed trains. Transportation Research A 21, 47-57.
    • (1987) Transportation Research A , vol.21 , pp. 47-57
    • Petersen, E.R.1    Taylor, A.J.2
  • 52
    • 0041988342 scopus 로고
    • Real-time control of logistics: Issues, models and formulations
    • University of Pennsylvania, Philadelphia
    • Powell, W. B. (1995) Real-time control of logistics: issues, models and formulations. In Service Design and Management in Railroad Operations Workshop. University of Pennsylvania, Philadelphia.
    • (1995) Service Design and Management in Railroad Operations Workshop
    • Powell, W.B.1
  • 53
    • 0041988341 scopus 로고
    • Preventive maintenance - A mature approach (technical maintenance plans - The way ahead)
    • Brisbane, Australia
    • Stead, J. and Martin, T. (1994) Preventive maintenance - a mature approach (technical maintenance plans - the way ahead). Tenth International Rail Track Conference, Brisbane, Australia.
    • (1994) Tenth International Rail Track Conference
    • Stead, J.1    Martin, T.2
  • 54
    • 0011877979 scopus 로고
    • Optimal train scheduling on a single line railway
    • Szpigel, B. (1973) Optimal train scheduling on a single line railway. Operations Research 72, 344-351.
    • (1973) Operations Research , vol.72 , pp. 344-351
    • Szpigel, B.1
  • 56
    • 0020125732 scopus 로고
    • Queuing models of classification and connection delay in railyards
    • Turnquist, M. and Daskin, M. (1982) Queuing models of classification and connection delay in railyards. Transportation Science 16, 207-230.
    • (1982) Transportation Science , vol.16 , pp. 207-230
    • Turnquist, M.1    Daskin, M.2
  • 57
    • 0042489202 scopus 로고
    • Railroad service design and control: Problem definition, state-of-the art practice and future directions
    • University of Pennsylvania, Philadelphia
    • Van Dyke, C.D. (1995) Railroad service design and control: Problem definition, state-of-the art practice and future directions. In Service Design and Management in Railroad Operations Workshop. University of Pennsylvania, Philadelphia.
    • (1995) Service Design and Management in Railroad Operations Workshop
    • Van Dyke, C.D.1
  • 58
    • 0042989963 scopus 로고
    • Software tools for railway operations/service planning: The service planning families of software
    • Computational Mechanics Publications, Southampton, U.K.
    • Van Dyke, C. D. and Davis, L. C. (1990) Software tools for railway operations/service planning: the service planning families of software. In Computer Applications in Railway Planning and Management, pp. 51-62. Computational Mechanics Publications, Southampton, U.K.
    • (1990) Computer Applications in Railway Planning and Management , pp. 51-62
    • Van Dyke, C.D.1    Davis, L.C.2
  • 59
    • 84974870136 scopus 로고
    • A survey of applications of Markov decision processes
    • White, D. J. (1993) A survey of applications of Markov decision processes. Journal of Operations Research Society 44(11), 1073-1096.
    • (1993) Journal of Operations Research Society , vol.44 , Issue.11 , pp. 1073-1096
    • White, D.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.