메뉴 건너뛰기




Volumn 16, Issue 3, 1996, Pages 87-96

The effects of varying set-up costs

Author keywords

Production costs; Set up costs; Storage costs

Indexed keywords


EID: 0030550061     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443579610110512     Document Type: Review
Times cited : (4)

References (11)
  • 1
    • 0023439708 scopus 로고
    • From EOQ towards ZI
    • Zangwill, W.I., "From EOQ towards ZI", Management Science, Vol. 33 No. 10, 1987, pp. 1209-23.
    • (1987) Management Science , vol.33 , Issue.10 , pp. 1209-23
    • Zangwill, W.I.1
  • 2
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H.M. and Whitin, T., "Dynamic version of the economic lot size model", Management Science, Vol. 5 No. 1, 1958, pp. 89-96.
    • (1958) Management Science , vol.5 , Issue.1 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.2
  • 3
    • 0004102424 scopus 로고
    • Dow Jones-Irwin Homewood, IL
    • Hall, R., Zero Inventories, Dow Jones-Irwin, Homewood, IL, 1983.
    • (1983) Zero Inventories
    • Hall, R.1
  • 4
    • 0022613610 scopus 로고
    • Optimal lot-sizing, process quality improvement and set-up cost reductions
    • Porteus, E.L., "Optimal lot-sizing, process quality improvement and set-up cost reductions", Operations Research, Vol. 34 No. 1, 1986, pp. 137-44.
    • (1986) Operations Research , vol.34 , Issue.1 , pp. 137-44
    • Porteus, E.L.1
  • 5
    • 0017557653 scopus 로고
    • Toyota production system and kanban system, materialization of just-in-time and respect-for-human system
    • Sugimori, Y., Kusunaki, K., Cho, F. and Uchikawa, S., "Toyota production system and kanban system, materialization of just-in-time and respect-for-human system", International Journal of Production Research, Vol. 15, 1977, pp. 553-64.
    • (1977) International Journal of Production Research , vol.15 , pp. 553-64
    • Sugimori, Y.1    Kusunaki, K.2    Cho, F.3    Uchikawa, S.4
  • 7
    • 16744364386 scopus 로고
    • Adaptable kanban system helps Toyota maintain just-in-time production
    • Monden, Y., "Adaptable kanban system helps Toyota maintain just-in-time production", Industrial Engineering, Vol. 13 No. 5, 1981, pp. 29-46.
    • (1981) Industrial Engineering , vol.13 , Issue.5 , pp. 29-46
    • Monden, Y.1
  • 8
    • 0003091893 scopus 로고
    • What makes the Toyota production system really tick?
    • Monden, Y., "What makes the Toyota production system really tick?", Industrial Engineering, 1981, Vol. 13 No. 1, pp. 6-46.
    • (1981) Industrial Engineering
    • Monden, Y.1
  • 9
    • 0021502727 scopus 로고    scopus 로고
    • Just-in-time production systems: Replacing complexity with simplicity in manufacturing management
    • October 1984
    • Schonberger, R.J., "Just-in-time production systems: replacing complexity with simplicity in manufacturing management", Industrial Engineering, October 1984, pp. 52-63.
    • Industrial Engineering , pp. 52-63
    • Schonberger, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.