-
1
-
-
0027555415
-
A two-phase heuristic algorithm for determining buffer sizes of production lines
-
Park, T., "A two-phase heuristic algorithm for determining buffer sizes of production lines", International Journal of Production Research, Vol. 31 No. 3, 1993, pp. 613-31.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.3
, pp. 613-31
-
-
Park, T.1
-
2
-
-
0024139789
-
Allocating buffer storages in a pull system
-
So, K.C. and Pinault, S.C., "Allocating buffer storages in a pull system", International Journal of Production Research, Vol. 26 No. 12, 1988, pp. 1959-80.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.12
, pp. 1959-80
-
-
So, K.C.1
Pinault, S.C.2
-
3
-
-
0021484044
-
Some comparative and design aspects of series production systems
-
Sarker, B.R., "Some comparative and design aspects of series production systems", IIE Transactions, Vol. 16, 1984, p. 229.
-
(1984)
IIE Transactions
, vol.16
-
-
Sarker, B.R.1
-
4
-
-
0004289658
-
-
South Western Publishing Cincinnati, OH
-
Umble, M.M. and Srikanth, M.L., Synchronous Manufacturing, South Western Publishing, Cincinnati, OH, 1990.
-
(1990)
Synchronous Manufacturing
-
-
Umble, M.M.1
Srikanth, M.L.2
-
6
-
-
0024047988
-
-
Fry, T.D. et al., "Dispatching in a multistage job shop where machine capacities are unbalanced", nternational Journal of Production Research, Vol. 26 No. 7, 1988, pp. 1193-223.
-
-
-
Fry, T.D.1
-
7
-
-
3543101242
-
Object-oriented simulation for manufacturing control
-
Ahmed, M.M. Sullivan, W.G. Begell House Inc. New York, NY
-
Hurley, S. and Driscoll, J., "Object-oriented simulation for manufacturing control", in Ahmed, M.M. and Sullivan, W.G. (Eds), Proceedings of Flexible Automation and Integrated Manufacturing '94, Begell House Inc., New York, NY, pp. 158-66, 1994.
-
Proceedings of Flexible Automation and Integrated Manufacturing '94
, pp. 158-66
-
-
Hurley, S.1
Driscoll, J.2
-
8
-
-
0023578221
-
-
Karmarkar, U.S. et al., "Capacity analysis of a manufacturing cell", ournal of Manufacturing Systems, Vol. 6 No. 3, 1989, pp. 165-75.
-
-
-
Karmarkar, U.S.1
-
9
-
-
0023399062
-
Buffer capacity analysis for sequential production lines with variable process times
-
Chow, W., "Buffer capacity analysis for sequential production lines with variable process times", International Journal of Production Research, Vol. 25 No. 8, 1987, pp. 1183-96.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.8
, pp. 1183-96
-
-
Chow, W.1
|