메뉴 건너뛰기




Volumn 16, Issue 12, 1996, Pages 98-105

Using delay-time analysis to study the maintenance problem of gearboxes

Author keywords

Hong Kong; Inspection; Maintenance programmes; Modelling; Motor industry; Preventive maintenance

Indexed keywords


EID: 0030510938     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443579610151779     Document Type: Article
Times cited : (28)

References (8)
  • 1
    • 0020844127 scopus 로고
    • An operational research approach to breakdown maintenance: Problem recognition
    • Christer, A.H. and Whitelaw, J., "An operational research approach to breakdown maintenance: problem recognition", Journal of the Operational Research Society, Vol. 34, 1983, pp. 1041-52.
    • (1983) Journal of the Operational Research Society , vol.34 , pp. 1041-52
    • Christer, A.H.1    Whitelaw, J.2
  • 6
    • 0021522019 scopus 로고
    • An operational research approach to planned maintenance: Modelling PM for a vehicle fleet
    • Christer, A.H. and Waller, W.M., "An operational research approach to planned maintenance: modelling PM for a vehicle fleet", Journal of the Operational Research Society, Vol. 35, 1984, pp. 967-84.
    • (1984) Journal of the Operational Research Society , vol.35 , pp. 967-84
    • Christer, A.H.1    Waller, W.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.