메뉴 건너뛰기




Volumn 16, Issue 8, 1996, Pages 81-103

Performance evaluation of cellular manufacturing systems: A taxonomy and review of research

Author keywords

Cellular manufacturing; Empirical studies; Performance

Indexed keywords


EID: 0030506277     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443579610125796     Document Type: Review
Times cited : (35)

References (74)
  • 2
    • 0027663979 scopus 로고
    • Design of cellular manufacturing systems: An invited review
    • Singh, N., "Design of cellular manufacturing systems: an invited review", European Journal of Operational Research, Vol. 69 No. 3, 1993, pp. 284-91.
    • (1993) European Journal of Operational Research , vol.69 , Issue.3 , pp. 284-91
    • Singh, N.1
  • 3
  • 4
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • Ramasesh, R., "Dynamic job shop scheduling: a survey of simulation research", OMEGA: The International Journal of Management Science, Vol. 18 No. 1, 1990, pp. 43-57.
    • (1990) OMEGA: The International Journal of Management Science , vol.18 , Issue.1 , pp. 43-57
    • Ramasesh, R.1
  • 5
    • 3042677003 scopus 로고
    • Some organizational aspects of cellular manufacture based on computer simulation
    • Tobias, S.A. Macmillan Birmingham
    • Athersmith, D. and Crookall, J.R., "Some organizational aspects of cellular manufacture based on computer simulation", in Tobias, S.A. (Ed.), Proceedings of the Fifteenth MTDR Conference, Macmillan, Birmingham, 1974.
    • (1974) Proceedings of the Fifteenth MTDR Conference
    • Athersmith, D.1    Crookall, J.R.2
  • 6
    • 0343711214 scopus 로고
    • Computer-aided performance analysis and design of cellular manufacturing systems
    • Crookall, J.R. and Lee, L.C., "Computer-aided performance analysis and design of cellular manufacturing systems", CIRP Journal of Manufacturing Systems, Vol. 6 No. 3, 1977, pp. 177-95.
    • (1977) CIRP Journal of Manufacturing Systems , vol.6 , Issue.3 , pp. 177-95
    • Crookall, J.R.1    Lee, L.C.2
  • 8
    • 84925911130 scopus 로고    scopus 로고
    • The group technology myths
    • January 1977
    • Leonard, R. and Rathmill, K., "The group technology myths", Management Today, January 1977, pp. 66-9.
    • Management Today , pp. 66-9
    • Leonard, R.1    Rathmill, K.2
  • 9
    • 0003032211 scopus 로고
    • The fundamental limitations of cellular manufacture when contrasted with efficient functional layout
    • Taylor & Francis London
    • Rathmill, K. and Leonard, R., "The fundamental limitations of cellular manufacture when contrasted with efficient functional layout", Fourth International Conference on Production Research (Preprints), Taylor & Francis, London, 1977.
    • (1977) Fourth International Conference on Production Research (Preprints)
    • Rathmill, K.1    Leonard, R.2
  • 10
    • 84952174404 scopus 로고
    • An examination of the dynamic behavior of part-families in group technology
    • Gupta, R.M. and Tompkins, J.A., "An examination of the dynamic behavior of part-families in group technology", Journal of Operations Management, Vol. 20, 1982, pp. 73-86.
    • (1982) Journal of Operations Management , vol.20 , pp. 73-86
    • Gupta, R.M.1    Tompkins, J.A.2
  • 11
    • 0021388884 scopus 로고
    • A comparative study of the performance of pure and hybrid group technology manufacturing systems using computer simulation
    • Ang, C.L. and Willey, P.C.T., "A comparative study of the performance of pure and hybrid group technology manufacturing systems using computer simulation", International Journal of Production Research, Vol. 22, 1984, pp. 193-233.
    • (1984) International Journal of Production Research , vol.22 , pp. 193-233
    • Ang, C.L.1    Willey, P.C.T.2
  • 12
    • 0022785585 scopus 로고
    • A simulation comparison of group technology with traditional job shop manufacturing
    • Flynn, B.B. and Jacobs, F.R., "A simulation comparison of group technology with traditional job shop manufacturing", International Journal of Production Research, Vol. 24, 1986, pp. 1171-92.
    • (1986) International Journal of Production Research , vol.24 , pp. 1171-92
    • Flynn, B.B.1    Jacobs, F.R.2
  • 13
    • 84985773741 scopus 로고
    • An experimental comparison of cellular (GT) layout with process layout
    • Flynn, B.B. and Jacobs, F.R., "An experimental comparison of cellular (GT) layout with process layout", Decision Sciences, Vol. 18, 1987, pp. 562-81.
    • (1987) Decision Sciences , vol.18 , pp. 562-81
    • Flynn, B.B.1    Jacobs, F.R.2
  • 15
    • 0022034627 scopus 로고
    • Lot-sizing time performance in a manufacturing cell
    • Karmarkar, U.S., Kekre, S., Kekre, S. and Freeman, S., "Lot-sizing time performance in a manufacturing cell", Interfaces, Vol. 15, 1985, pp. 1-9.
    • (1985) Interfaces , vol.15 , pp. 1-9
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3    Freeman, S.4
  • 16
    • 0022162728 scopus 로고
    • A study of system characteristics in a manufacturing cell
    • Lee, L.C., "A study of system characteristics in a manufacturing cell", International Journal of Production Research, Vol. 23, 1985, pp. 1101-14.
    • (1985) International Journal of Production Research , vol.23 , pp. 1101-14
    • Lee, L.C.1
  • 17
    • 0025485232 scopus 로고
    • An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell
    • Mahmoodi, F., Dooley, K.J. and Starr, P.J., "An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell", International Journal of Production Research, Vol. 28, 1990, pp. 1695-711.
    • (1990) International Journal of Production Research , vol.28 , pp. 1695-711
    • Mahmoodi, F.1    Dooley, K.J.2    Starr, P.J.3
  • 18
    • 45149135939 scopus 로고
    • An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system
    • Mahmoodi, F., Dooley, K.J. and Starr, P.J., "An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system", Journal of Operations Management, Vol. 9 No. 4, 1990, pp. 548-72.
    • (1990) Journal of Operations Management , vol.9 , Issue.4 , pp. 548-72
    • Mahmoodi, F.1    Dooley, K.J.2    Starr, P.J.3
  • 19
    • 0026220052 scopus 로고
    • A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
    • Mahmoodi, F. and Dooley, K.J., "A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell", International Journal of Production Research, Vol. 29 No. 9, 1991, pp. 1923-39.
    • (1991) International Journal of Production Research , vol.29 , Issue.9 , pp. 1923-39
    • Mahmoodi, F.1    Dooley, K.J.2
  • 20
    • 0002765014 scopus 로고
    • Dynamic group scheduling heuristics in a flow-through cell environment
    • Mahmoodi, F., Tierney, E.J. and Mosier, C.T., "Dynamic group scheduling heuristics in a flow-through cell environment", Decision Sciences, Vol. 23, 1992, pp. 61-85.
    • (1992) Decision Sciences , vol.23 , pp. 61-85
    • Mahmoodi, F.1    Tierney, E.J.2    Mosier, C.T.3
  • 21
    • 0027606670 scopus 로고
    • A comprehensive analysis of group scheduling heuristics in a job shop cell
    • Ruben, R.S., Mosier, C.T. and Mahmoodi, F., "A comprehensive analysis of group scheduling heuristics in a job shop cell", International Journal of Production Research, Vol. 31 No. 6, 1993, pp. 1343-70.
    • (1993) International Journal of Production Research , vol.31 , Issue.6 , pp. 1343-70
    • Ruben, R.S.1    Mosier, C.T.2    Mahmoodi, F.3
  • 23
    • 84985846099 scopus 로고
    • Fundamental insights into part family scheduling: The single machine case
    • Wemmerlöv, U., "Fundamental insights into part family scheduling: the single machine case", Decision Sciences, Vol. 23, 1992, pp. 565-95.
    • (1992) Decision Sciences , vol.23 , pp. 565-95
    • Wemmerlöv, U.1
  • 25
    • 84990617466 scopus 로고
    • An investigation of scheduling policies in a dual-constrained manufacturing cell
    • Wirth, G.T., Mahmoodi, F. and Mosier, C.T., "An investigation of scheduling policies in a dual-constrained manufacturing cell", Decision Sciences, Vol. 24 No. 4, 1993, pp. 761-88.
    • (1993) Decision Sciences , vol.24 , Issue.4 , pp. 761-88
    • Wirth, G.T.1    Mahmoodi, F.2    Mosier, C.T.3
  • 26
    • 0023417844 scopus 로고
    • Performance of a manufacturing cell with increased product mix
    • Kekre, S., "Performance of a manufacturing cell with increased product mix", IIE Transactions, Vol. 19 No. 3, 1987, pp. 329-39.
    • (1987) IIE Transactions , vol.19 , Issue.3 , pp. 329-39
    • Kekre, S.1
  • 27
    • 9644287019 scopus 로고
    • Job and family scheduling of a flow-line manufacturing cell: A simulation study
    • Wemmerlöv, U. and Vakharia, A.J., "Job and family scheduling of a flow-line manufacturing cell: a simulation study", IIE Transactions, Vol. 23 No. 4, 1991, pp. 383-93.
    • (1991) IIE Transactions , vol.23 , Issue.4 , pp. 383-93
    • Wemmerlöv, U.1    Vakharia, A.J.2
  • 28
    • 84985788526 scopus 로고
    • A study of labor allocation strategies in cellular manufacturing
    • Russell, R.S., Huang, P.Y. and Leu, Y., "A study of labor allocation strategies in cellular manufacturing", Decision Sciences, Vol. 22 No. 3, 1991, pp. 594-611.
    • (1991) Decision Sciences , vol.22 , Issue.3 , pp. 594-611
    • Russell, R.S.1    Huang, P.Y.2    Leu, Y.3
  • 29
    • 0000358905 scopus 로고
    • A simulation study on performance improvement of group technology cells
    • Sassani, F., "A simulation study on performance improvement of group technology cells", International Journal of Production Research, Vol. 28 No. 2, 1990, pp. 293-300.
    • (1990) International Journal of Production Research , vol.28 , Issue.2 , pp. 293-300
    • Sassani, F.1
  • 30
    • 0023451292 scopus 로고
    • A simulation study of some maintenance policies in a group technology shop
    • Banerjee, A. and Flynn, B.B., "A simulation study of some maintenance policies in a group technology shop", International Journal of Production Research, Vol. 25, 1987, pp. 1595-609.
    • (1987) International Journal of Production Research , vol.25 , pp. 1595-609
    • Banerjee, A.1    Flynn, B.B.2
  • 34
    • 38249034192 scopus 로고
    • Repetitive lots: The use of a sequence-dependent scheduling procedure in group technology and traditional shops
    • Flynn, B.B., "Repetitive lots: the use of a sequence-dependent scheduling procedure in group technology and traditional shops", Journal of Operations Management, Vol. 7 No. 2, 1987, pp. 203-16.
    • (1987) Journal of Operations Management , vol.7 , Issue.2 , pp. 203-16
    • Flynn, B.B.1
  • 35
    • 0023576978 scopus 로고
    • The effects of set-up time on output capacity in cellular manufacturing
    • Flynn, B.B., "The effects of set-up time on output capacity in cellular manufacturing", International Journal of Production Research, Vol. 25 No. 12, 1987, pp. 1761-72.
    • (1987) International Journal of Production Research , vol.25 , Issue.12 , pp. 1761-72
    • Flynn, B.B.1
  • 36
    • 0002855196 scopus 로고
    • Countering the negative impact of inter-cell flow in cellular manufacturing
    • Garza, O. and Smunt, T.L., "Countering the negative impact of inter-cell flow in cellular manufacturing", Journal of Operations Management, Vol. 10 No. 1, 1991, pp. 92-118.
    • (1991) Journal of Operations Management , vol.10 , Issue.1 , pp. 92-118
    • Garza, O.1    Smunt, T.L.2
  • 37
    • 0001935574 scopus 로고
    • Effects of processing time variability and routeing flexibility on group technology implementation in flow-shops
    • New Orleans LA
    • Moily, J. and Stinson, J.P., "Effects of processing time variability and routeing flexibility on group technology implementation in flow-shops", Proceedings of the National Decision Sciences Institute, New Orleans, LA, 1989, pp. 898-901.
    • (1989) Proceedings of the National Decision Sciences Institute , pp. 898-901
    • Moily, J.1    Stinson, J.P.2
  • 39
    • 0025560330 scopus 로고
    • A simulation analysis of factors influencing the attractiveness of group technology cellular layouts
    • Morris, J.S. and Tersine, R.J., "A simulation analysis of factors influencing the attractiveness of group technology cellular layouts", Management Science, Vol. 36 No. 12, 1990, pp. 1567-78.
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1567-78
    • Morris, J.S.1    Tersine, R.J.2
  • 40
    • 0028532489 scopus 로고
    • A simulation comparison of process and cellular layouts in a dual resource constrained environment
    • Morris, J.S. and Tersine, R.J., "A simulation comparison of process and cellular layouts in a dual resource constrained environment", Computers and Industrial Engineering, Vol. 26 No. 4, 1994, pp. 733-41.
    • (1994) Computers and Industrial Engineering , vol.26 , Issue.4 , pp. 733-41
    • Morris, J.S.1    Tersine, R.J.2
  • 41
    • 0002885973 scopus 로고
    • A simulation study of cellular versus functional layouts under a variety of shop operating conditions
    • San Diego CA
    • Shafer, S.M., "A simulation study of cellular versus functional layouts under a variety of shop operating conditions", Proceedings of the National Decision Sciences Institute, San Diego, CA, 1990, pp. 1714-16.
    • (1990) Proceedings of the National Decision Sciences Institute , pp. 1714-16
    • Shafer, S.M.1
  • 42
    • 84990614224 scopus 로고
    • Cellular versus functional layouts under a variety of shop operating conditions
    • Shafer, S. M. and Charnes, J. M., "Cellular versus functional layouts under a variety of shop operating conditions", Decision Sciences, 1993, Vol. 24 No. 3, pp. 65-81.
    • (1993) Decision Sciences
    • Shafer, S.M.1    Charnes, J.M.2
  • 43
    • 0001076076 scopus 로고
    • A simulation analysis of factors influencing loading practices in cellular manufacturing
    • Shafer, S.M. and Charnes, J.M., "A simulation analysis of factors influencing loading practices in cellular manufacturing", International Journal of Production Research, Vol. 33 No. 1, 1995, pp. 279-90.
    • (1995) International Journal of Production Research , vol.33 , Issue.1 , pp. 279-90
    • Shafer, S.M.1    Charnes, J.M.2
  • 45
    • 84985788221 scopus 로고
    • Partitioning work centers for group technology: Analytical-extension and shop-level simulation investigation
    • Suresh, N.C., "Partitioning work centers for group technology: analytical-extension and shop-level simulation investigation", Decision Sciences, Vol. 23 No. 2, 1992, pp. 267-90.
    • (1992) Decision Sciences , vol.23 , Issue.2 , pp. 267-90
    • Suresh, N.C.1
  • 46
    • 0028406510 scopus 로고
    • Coping with the loss of pooling synergy in cellular manufacturing systems
    • Suresh, N.C. and Meredith, J.R., "Coping with the loss of pooling synergy in cellular manufacturing systems", Management Science, Vol. 40 No. 4, 1994, pp. 466-83.
    • (1994) Management Science , vol.40 , Issue.4 , pp. 466-83
    • Suresh, N.C.1    Meredith, J.R.2
  • 47
    • 33749276677 scopus 로고
    • Sequencing rules and due date setting procedures in flow line cells with family set-ups
    • Russell, G.R. and Philipoom, P.R., "Sequencing rules and due date setting procedures in flow line cells with family set-ups", Journal of Operations Management, Vol. 10 No. 4, 1991, pp. 524-45.
    • (1991) Journal of Operations Management , vol.10 , Issue.4 , pp. 524-45
    • Russell, G.R.1    Philipoom, P.R.2
  • 48
    • 84985829464 scopus 로고
    • Partitioning work centers for group technology: Insights from an analytical model
    • Suresh, N.C., "Partitioning work centers for group technology: insights from an analytical model", Decision Sciences, Vol. 22 No. 4, 1991, pp. 772-91.
    • (1991) Decision Sciences , vol.22 , Issue.4 , pp. 772-91
    • Suresh, N.C.1
  • 50
    • 0001663057 scopus 로고
    • Impact of family-based scheduling on transfer batches in a job shop manufacturing cell
    • Kannan, V.R. and Lyman, S.B., "Impact of family-based scheduling on transfer batches in a job shop manufacturing cell", International Journal of Production Research, Vol. 32 No. 12, 1994, pp. 2777-94.
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2777-94
    • Kannan, V.R.1    Lyman, S.B.2
  • 54
    • 0023310940 scopus 로고
    • Lot sizes, lead times, and in-process inventories
    • Karmarkar, U.S., "Lot sizes, lead times, and in-process inventories", Management Science, Vol. 33, 1987, pp. 409-18.
    • (1987) Management Science , vol.33 , pp. 409-18
    • Karmarkar, U.S.1
  • 55
    • 84985801774 scopus 로고
    • Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing
    • Jacobs, F.R. and Bragg, D., "Repetitive lots: flow-time reductions through sequencing and dynamic batch sizing", Decision Sciences, Vol. 19, 1988, pp. 281-94.
    • (1988) Decision Sciences , vol.19 , pp. 281-94
    • Jacobs, F.R.1    Bragg, D.2
  • 56
    • 0018700364 scopus 로고
    • Optimizing intermittent production systems through group technology and an MRP system
    • Suresh, N.C., "Optimizing intermittent production systems through group technology and an MRP system", Production and Inventory Management, Vol. 20 No. 4, 1979, pp. 77-84.
    • (1979) Production and Inventory Management , vol.20 , Issue.4 , pp. 77-84
    • Suresh, N.C.1
  • 57
    • 0018470787 scopus 로고
    • Optimal group scheduling and machining speed decision under due-date constraints
    • Ham, I., Hitomi, K., Nakamura and Yoshida, T., "Optimal group scheduling and machining speed decision under due-date constraints", Journal of Enqineering for Industry, Vol. 101, 1979, pp. 128-34.
    • (1979) Journal of Enqineering for Industry , vol.101 , pp. 128-34
    • Ham, I.1    Hitomi, K.2    Nakamura3    Yoshida, T.4
  • 58
    • 0017526656 scopus 로고
    • Group scheduling technique for multiproduct, multistage manufacturing systems
    • Hitomi, K. and Ham, I., "Group scheduling technique for multiproduct, multistage manufacturing systems", Journal of Enqineering for Industry, Vol. 99, 1977, pp. 759-65.
    • (1977) Journal of Enqineering for Industry , vol.99 , pp. 759-65
    • Hitomi, K.1    Ham, I.2
  • 59
    • 0018005819 scopus 로고
    • Machine loading and product-mix analysis for group technology
    • Hitomi, K. and Ham, I., "Machine loading and product-mix analysis for group technology", Journal of Engineering for Industry, Vol. 100, 1978, pp. 370-4.
    • (1978) Journal of Engineering for Industry , vol.100 , pp. 370-4
    • Hitomi, K.1    Ham, I.2
  • 60
    • 0027663577 scopus 로고
    • Set-up time reduction and competitive advantage in a closed manufacturing cell
    • Yang, J. and Deane, R.H., "Set-up time reduction and competitive advantage in a closed manufacturing cell", European Journal of Operational Research, Vol. 69 No. 3, 1993, pp. 413-23.
    • (1993) European Journal of Operational Research , vol.69 , Issue.3 , pp. 413-23
    • Yang, J.1    Deane, R.H.2
  • 61
    • 0011718914 scopus 로고
    • A survey of cellular manufacturing cells
    • Pullen, R.D., "A survey of cellular manufacturing cells", The Production Engineer, Vol. 55, 1976, pp. 451-4.
    • (1976) The Production Engineer , vol.55 , pp. 451-4
    • Pullen, R.D.1
  • 64
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves,. S.C., "A review of production scheduling", Operations Research, Vol. 29 No. 4, 1981, pp. 646-75.
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 646-75
    • Graves., S.C.1
  • 65
    • 0001944101 scopus 로고
    • A review of cellular manufacturing assumptions, advantages and design techniques
    • Greene, T.J. and Sadowski, P.R., "A review of cellular manufacturing assumptions, advantages and design techniques", Journal of Operations Management, Vol. 4, 1984, pp. 85-97.
    • (1984) Journal of Operations Management , vol.4 , pp. 85-97
    • Greene, T.J.1    Sadowski, P.R.2
  • 67
    • 0039900597 scopus 로고
    • The potential of group technology for US manufacturing
    • Hyer, N.L., "The potential of group technology for US manufacturing", Journal of Operations Management, Vol. 4 No. 3, 1984.
    • (1984) Journal of Operations Management , vol.4 , Issue.3
    • Hyer, N.L.1
  • 68
    • 84989422139 scopus 로고
    • MRP/GT: A framework for production planning and control of cellular manufacturing
    • Hyer, N.L. and Wemmerlöv, U., "MRP/GT: a framework for production planning and control of cellular manufacturing", Decision Sciences, 1982, Vol. 13, pp. 681-701.
    • (1982) Decision Sciences
    • Hyer, N.L.1    Wemmerlöv, U.2
  • 70
    • 0000637977 scopus 로고
    • The facts of group technology and their impacts on implementation: A state-of-the-art survey
    • Mosier, C.T. and Taube, L., "The facts of group technology and their impacts on implementation: a state-of-the-art survey", OMEGA International Journal of Management Science, Vol. 13, 1985, pp. 381-91.
    • (1985) OMEGA International Journal of Management Science , vol.13 , pp. 381-91
    • Mosier, C.T.1    Taube, L.2
  • 71
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow shop sequencing problem
    • Nawaz, M., Enscore, E.E. and Ham, I., "A heuristic algorithm for the m-machine, n-job flow shop sequencing problem", OMEGA International Journal of Management Science, Vol. 11 No. 1, 1983, pp. 91-5.
    • (1983) OMEGA International Journal of Management Science , vol.11 , Issue.1 , pp. 91-5
    • Nawaz, M.1    Enscore, E.E.2    Ham, I.3
  • 72
    • 0021494594 scopus 로고
    • A review of production control problems in cellular manufacturing
    • Sinha, R.K. and Hollier, R.H., "A review of production control problems in cellular manufacturing", International Journal of Production Research, Vol. 22, 1984, pp. 773-89.
    • (1984) International Journal of Production Research , vol.22 , pp. 773-89
    • Sinha, R.K.1    Hollier, R.H.2
  • 73
    • 0010210371 scopus 로고
    • Achieving factory automation through group technology principles
    • Suresh, N.C. and Meredith, J.R., "Achieving factory automation through group technology principles", Journal of Operations Management, Vol. 5, 1985, pp. 151-67.
    • (1985) Journal of Operations Management , vol.5 , pp. 151-67
    • Suresh, N.C.1    Meredith, J.R.2
  • 74
    • 0024731874 scopus 로고
    • A review of the dual resource constrained system research
    • Treleven, M., "A review of the dual resource constrained system research", IIE Transactions, Vol. 21 No. 3, 1989, pp. 279-87.
    • (1989) IIE Transactions , vol.21 , Issue.3 , pp. 279-87
    • Treleven, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.