메뉴 건너뛰기




Volumn 26, Issue 3, 1996, Pages 85-92

Damming the Theun river: Nordic companies in Laos

Author keywords

[No Author keywords available]

Indexed keywords

DAM CONSTRUCTION; DEVELOPING COUNTRY; ENVIRONMENTAL IMPACT; HYDROPOWER DEVELOPMENT; NORDIC INVESTMENT; SOCIAL IMPACT;

EID: 0030465701     PISSN: 02613131     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (6)

References (41)
  • 1
    • 0004229747 scopus 로고
    • 4 June
    • Bangkok Post, 4 June 1994.
    • (1994) Bangkok Post
  • 2
    • 0004691874 scopus 로고
    • 4 March
    • The Nation, 4 March 1994.
    • (1994) The Nation
  • 3
    • 5644292570 scopus 로고
    • Final Report, Theun Hinboun Environmental Studies in the Lao PDR. Submitted to Norplan, October
    • MIDAS Agronomics and Burapha Development Consultant, "Rural Development and Land Use", Final Report, Theun Hinboun Environmental Studies in the Lao PDR. Submitted to Norplan, October 1995, p.9.
    • (1995) Rural Development and Land Use , pp. 9
  • 4
    • 5644266775 scopus 로고
    • a report to the Hydropower Office of the Lao PDR Ministry of Industry and Handicrafts and to Norplan, Vientiane, August
    • Wildlife Conservation Society, "A wildlife and habitat survey of the area to be affected by Theun Hinboun hydropower project, Lao PDR", a report to the Hydropower Office of the Lao PDR Ministry of Industry and Handicrafts and to Norplan, Vientiane, August 1995, p.1.
    • (1995) A Wildlife and Habitat Survey of the Area to Be Affected by Theun Hinboun Hydropower Project, Lao PDR , pp. 1
  • 5
    • 5644249998 scopus 로고
    • Final Report, February
    • Department of Livestock-Veterinary in Association with Burapha Development Consultants, "Nam Theun 1-2 Study on Aquatic Life", Final Report, February 1992, p.5.1.
    • (1992) Nam Theun 1-2 Study on Aquatic Life
  • 6
    • 0025237888 scopus 로고
    • Remaking the Mekong
    • Mar/April
    • Lohmann, L., "Remaking the Mekong", The Ecologist, Vol. 20, No. 2, Mar/April 1990, p.62.
    • (1990) The Ecologist , vol.20 , Issue.2 , pp. 62
    • Lohmann, L.1
  • 7
    • 5644299610 scopus 로고    scopus 로고
    • Statkraft of Norway own 50 per cent, Vattenfall 40 per cent and the remaining 10 per cent is owned by Nordic Power Invest (which is, in turn, owned by Sydkraft of Sweden, Imatran Voima of Finland and Elkraft of Denmark)
    • Statkraft of Norway own 50 per cent, Vattenfall 40 per cent and the remaining 10 per cent is owned by Nordic Power Invest (which is, in turn, owned by Sydkraft of Sweden, Imatran Voima of Finland and Elkraft of Denmark).
  • 8
    • 5644268506 scopus 로고
    • Nam Theun 1/2 Hydropower Project, Feasibility Study
    • May
    • Asian Development Bank, Report and Recommendation of the President to the Board of Directors on a Proposed Loan to the Lao People's Democratic Republic for the Theun-Hinboun Hydropower Project, October 1994 (confidential). The Norwegian consultants' 1993 financial analysis of Theun Hinboun estimated a peak price ranging from 5.8 to 8.69 US cents per kilowatt hour. See Norpower, "Nam Theun 1/2 Hydropower Project, Feasibility Study", Volume 3, Environmental Impact Assessment Report, May 1993.
    • (1993) Environmental Impact Assessment Report , vol.3
    • Norpower1
  • 9
    • 5644293789 scopus 로고    scopus 로고
    • See Asian Development Bank, op. cit. 8., p.26. The rest of the finance comes from commercial banks, export credit agencies and the Thai financial market. Citibank is coordinating export credits for equipment purchases which are likely to come from Nordic companies such as turbine manufacturer Kvärner.
    • Environmental Impact Assessment Report , vol.8 , pp. 26
  • 10
    • 5644280634 scopus 로고    scopus 로고
    • Author's interview, 16 April 1996
    • Author's interview, 16 April 1996.
  • 11
    • 5644274576 scopus 로고    scopus 로고
    • The Dams Debate in Sweden
    • Nordic Dam-building in the South, Swedish Society for Nature Conservation, Stockholm
    • Lövgren, L., "The Dams Debate in Sweden" in Nordic Dam-building in the South, Proceedings of an International Conference 3-4 August 1994, Swedish Society for Nature Conservation, Stockholm, p.56.
    • Proceedings of An International Conference 3-4 August 1994 , pp. 56
    • Lövgren, L.1
  • 12
    • 5644260728 scopus 로고    scopus 로고
    • Author's interview with Norwegian anthropologist Terje Brantenberg, May 1995
    • Author's interview with Norwegian anthropologist Terje Brantenberg, May 1995.
  • 13
    • 5644267304 scopus 로고
    • Dam-building in the South: The Nordic Connection
    • May
    • Usher, A. D., "Dam-building in the South: The Nordic Connection", Sveriges Natur, May 1994.
    • (1994) Sveriges Natur
    • Usher, A.D.1
  • 14
    • 5644286859 scopus 로고
    • 13 August
    • The Nation, 13 August, 1993.
    • (1993) The Nation
  • 15
    • 84965951885 scopus 로고
    • Swedish Ministry of Foreign Affairs, Stockholm, 1 May
    • See Palme, O., Documents on Swedish Foreign Policy 1970, Swedish Ministry of Foreign Affairs, Stockholm, 1 May 1970, p.111.
    • (1970) Documents on Swedish Foreign Policy 1970 , pp. 111
    • Palme, O.1
  • 16
    • 5644248746 scopus 로고    scopus 로고
    • SIDA was restructured in 1995 and renamed the Swedish International Development Cooperation Agency (Sida). All references in this article are to SIDA before this restructuring
    • SIDA was restructured in 1995 and renamed the Swedish International Development Cooperation Agency (Sida). All references in this article are to SIDA before this restructuring.
  • 17
    • 5644237211 scopus 로고    scopus 로고
    • Author's interview, June 1994
    • Author's interview, June 1994.
  • 18
    • 5644270969 scopus 로고    scopus 로고
    • Letter from Paho Boonaphol, Lao Minister for External Economic Relations, to Norwegian Ministry of Foreign Affairs, undated
    • Letter from Paho Boonaphol, Lao Minister for External Economic Relations, to Norwegian Ministry of Foreign Affairs, undated.
  • 19
    • 5644269748 scopus 로고    scopus 로고
    • Author's interview, March 1994
    • Author's interview, March 1994.
  • 20
    • 0004229752 scopus 로고
    • 24 February
    • Bangkok Post, 24 February 1995.
    • (1995) Bangkok Post
  • 21
    • 84913014024 scopus 로고
    • 13 April
    • The Nation, 13 April, 1993.
    • (1993) The Nation
  • 22
    • 5644291357 scopus 로고    scopus 로고
    • Although SIDA had financed the Xeset dam to export electricity to Thailand, it reasoned that further development aid funds should not be used to underwrite Thailand's electricity consumption. As Jan Bjerninger, who was in charge of SIDA's Infrastructure Division at the time,said, "once was enough"
    • Although SIDA had financed the Xeset dam to export electricity to Thailand, it reasoned that further development aid funds should not be used to underwrite Thailand's electricity consumption. As Jan Bjerninger, who was in charge of SIDA's Infrastructure Division at the time,said, "once was enough".
  • 23
    • 5644286859 scopus 로고
    • 13 August
    • The Nation, 13 August 1993.
    • (1993) The Nation
  • 25
    • 5644241567 scopus 로고
    • Department of Cultural Anthropology, Uppsala University, Sweden, for Norpower, EdL, Hydropower Project Office, Ministry of Industry and Handicraft, Vientiane, Lao PDR, 7 April
    • Ovesen, J., "Social Anthropological Survey, Nam Theun 1/2 Hydropower Feasibility Study", Department of Cultural Anthropology, Uppsala University, Sweden, for Norpower, EdL, Hydropower Project Office, Ministry of Industry and Handicraft, Vientiane, Lao PDR, 7 April 1993, p.55.
    • (1993) Social Anthropological Survey, Nam Theun 1/2 Hydropower Feasibility Study , pp. 55
    • Ovesen, J.1
  • 27
    • 5644246851 scopus 로고
    • Laos: NORAD says Norconsult's role in Nam Theun 1/2 project is a case of setting the fox to keep the geese
    • 15 Oct.
    • "Laos: NORAD says Norconsult's role in Nam Theun 1/2 project is a case of setting the fox to keep the geese", Development Today, 15 Oct. 1993.
    • (1993) Development Today
  • 31
    • 5644264326 scopus 로고    scopus 로고
    • Author's interview, March 1994
    • Author's interview, March 1994.
  • 34
    • 5644267303 scopus 로고
    • Draft Final Report, Ministry of Industry and Handicrafts Hydropower Office, 10 November
    • Norplan sub-contracted various parts of the study: vegetation and wildlife to the Wildlife Conservation Society; water quality, minimum flow release and aquatic ecology to the Norwegian Institute for Water Research (NIVA) and the Norwegian Institute for Nature Research (NINA); hydrology, erosion and sediment transport to the Swedish firm Hydroconsult AB; and land use and rural development to the Vientiane-based, Swedish firm Burapha and the Bangkok-based MIDAS. See Norplan Consulting Engineers and Planners, "Impact Studies for the Theun-Hinboun Hydropower Project, Laos", Draft Final Report, Ministry of Industry and Handicrafts Hydropower Office, 10 November 1995.
    • (1995) Impact Studies for the Theun-Hinboun Hydropower Project, Laos


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.