메뉴 건너뛰기




Volumn 46-47, Issue , 1996, Pages 261-276

Stochastic lot-sizing: Solution and heuristic methods

Author keywords

Heuristics; Make to order; Production planning

Indexed keywords

ALGORITHMS; COST ACCOUNTING; DECISION MAKING; HEURISTIC METHODS; MARKOV PROCESSES; MATHEMATICAL MODELS; OPTIMIZATION; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 0030421937     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/0925-5273(95)00112-3     Document Type: Article
Times cited : (7)

References (20)
  • 1
    • 0024718805 scopus 로고
    • Computerization of manufacturing planning and control systems: Minicomputer-based systems 1980-1987
    • Mattsson, L., Olhager, J., Ovrin, P. and Rapp, B., 1989. Computerization of manufacturing planning and control systems: Minicomputer-based systems 1980-1987, Eng. Costs Prod. Econom., 17: 71-78.
    • (1989) Eng. Costs Prod. Econom. , vol.17 , pp. 71-78
    • Mattsson, L.1    Olhager, J.2    Ovrin, P.3    Rapp, B.4
  • 2
    • 0040796269 scopus 로고
    • A study of small subcontracting and make-to-order firms in relation to quotation for orders
    • Tobin N., Mercer, A. and Kingsman, B.G., 1988. A study of small subcontracting and make-to-order firms in relation to quotation for orders. Int. J. Oper. Prod. Mgmt., 6: 46-59.
    • (1988) Int. J. Oper. Prod. Mgmt. , vol.6 , pp. 46-59
    • Tobin, N.1    Mercer, A.2    Kingsman, B.G.3
  • 3
    • 0024961857 scopus 로고
    • Production planning systems and their applicability to make-to-order companies
    • Hendry, L.C. and Kingsman, B.G., 1989. Production planning systems and their applicability to make-to-order companies. Eur. J. Oper. Res., 40: 1-15.
    • (1989) Eur. J. Oper. Res. , vol.40 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 4
    • 0022678213 scopus 로고
    • Designing a material-requirements-planning system to meet the needs of low-volume, make-to-order companies (with case study)
    • Hoey, J., Kilmartin, B.R. and Leonard, R., 1986. Designing a material-requirements-planning system to meet the needs of low-volume, make-to-order companies (with case study). Int. J. Prod. Res., 24: 375-386.
    • (1986) Int. J. Prod. Res. , vol.24 , pp. 375-386
    • Hoey, J.1    Kilmartin, B.R.2    Leonard, R.3
  • 5
    • 0024048651 scopus 로고
    • Designing the closed loop elements of a material requirements planning system in a low-volume, make-to-order company (with case study)
    • McAreavey, D., Hoey, J. and Leonard, R., 1988. Designing the closed loop elements of a material requirements planning system in a low-volume, make-to-order company (with case study). Int. J. Prod. Res., 26: 1141-1159.
    • (1988) Int. J. Prod. Res. , vol.26 , pp. 1141-1159
    • McAreavey, D.1    Hoey, J.2    Leonard, R.3
  • 6
    • 0024664315 scopus 로고
    • Structuring the bills of material for a complex make-to-order product (a case study)
    • Rusk, P.S. and Barber, K.D., 1988. Structuring the bills of material for a complex make-to-order product (a case study). Eng. Costs Prod. Econom., 15: 215-222.
    • (1988) Eng. Costs Prod. Econom. , vol.15 , pp. 215-222
    • Rusk, P.S.1    Barber, K.D.2
  • 7
    • 24644521968 scopus 로고
    • Order promising and the master production schedule
    • McClelland, M.K., 1988. Order promising and the master production schedule. Dec. Sci., 19: 858-879.
    • (1988) Dec. Sci. , vol.19 , pp. 858-879
    • McClelland, M.K.1
  • 10
    • 0019560165 scopus 로고
    • Due date assignment for production systems
    • Seidmann, A. and Smith, M.L., 1981. Due date assignment for production systems. Mgmt. Sci., 27: 571-581.
    • (1981) Mgmt. Sci. , vol.27 , pp. 571-581
    • Seidmann, A.1    Smith, M.L.2
  • 11
    • 0023326988 scopus 로고
    • A generalised method of optimal due date assignment by linear programming
    • Quaddus, M.A., 1987. A generalised method of optimal due date assignment by linear programming. J. Oper. Res. Soc., 38: 353-359.
    • (1987) J. Oper. Res. Soc. , vol.38 , pp. 353-359
    • Quaddus, M.A.1
  • 13
    • 30244543172 scopus 로고
    • Heuristic procedures for stochastic lot-sizing with capacity constraints
    • Tinbergen Institute, Rotterdam, Netherlands
    • Dellaert, N.P. and Melo, M.T., 1993. Heuristic procedures for stochastic lot-sizing with capacity constraints. Technical Report TI-93-222, Tinbergen Institute, Rotterdam, Netherlands.
    • (1993) Technical Report TI-93-222
    • Dellaert, N.P.1    Melo, M.T.2
  • 14
    • 30244475281 scopus 로고
    • Heuristic procedures for the uncapacitated stochastic lot-sizing problem
    • Tinbergen Institute, Rotterdam, Netherlands
    • Dellaert, N.P. and Melo, M.T., 1993. Heuristic procedures for the uncapacitated stochastic lot-sizing problem. Technical Report TI-93-91, Tinbergen Institute, Rotterdam, Netherlands.
    • (1993) Technical Report TI-93-91
    • Dellaert, N.P.1    Melo, M.T.2
  • 15
    • 0002657699 scopus 로고
    • A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
    • Silver, E.A. and Meal, H.C., 1973. A heuristic for selecting lot size requirements for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Prod. Inv. Mgmt., 14: 64-74.
    • (1973) Prod. Inv. Mgmt. , vol.14 , pp. 64-74
    • Silver, E.A.1    Meal, H.C.2
  • 17
    • 0002967761 scopus 로고
    • A deterministic multi-period production scheduling model with backlogging
    • Zangwill, W.I., 1966. A deterministic multi-period production scheduling model with backlogging. Mgmt. Sci., 13: 105-119.
    • (1966) Mgmt. Sci. , vol.13 , pp. 105-119
    • Zangwill, W.I.1
  • 18
    • 0022697657 scopus 로고
    • A simple heuristic for the multi item single level capacitated lotsizing problem
    • Maes, J. and Van Wassenhove, L.N., 1986. A simple heuristic for the multi item single level capacitated lotsizing problem. Oper. Res. L., 4: 265-273.
    • (1986) Oper. Res. L. , vol.4 , pp. 265-273
    • Maes, J.1    Van Wassenhove, L.N.2
  • 19
    • 0038533425 scopus 로고
    • Production to order: Models and rules for production planning
    • Springer, Berlin
    • Dellaert, N.P., 1989. Production to order: Models and rules for production planning. Lecture Notes in Economics and Mathematical Systems, Vol. 333. Springer, Berlin.
    • (1989) Lecture Notes in Economics and Mathematical Systems , vol.333
    • Dellaert, N.P.1
  • 20
    • 30244465673 scopus 로고
    • Heuristic procedures for a stochastic lot-sizing problem in make-to-order manufacturing
    • Dellaert, N.P. and Melo, M.T., 1995. Heuristic procedures for a stochastic lot-sizing problem in make-to-order manufacturing. Ann. Oper. Res., 59.
    • (1995) Ann. Oper. Res. , pp. 59
    • Dellaert, N.P.1    Melo, M.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.