|
Volumn 51, Issue 2, 1996, Pages 1307-1320
|
Development of load and pressure controller for the 200 tons per day entrained flow IGCC pilot plant in Japan
a
|
Author keywords
[No Author keywords available]
|
Indexed keywords
COAL GASIFICATION PLANTS;
COMPUTER SIMULATION;
CONTROL EQUIPMENT;
ELECTRIC LOAD MANAGEMENT;
ELECTRIC POWER PLANT EQUIPMENT;
NUCLEAR POWER PLANTS;
OPERATIONS RESEARCH;
PILOT PLANTS;
PRESSURE CONTROL;
THERMOELECTRIC POWER PLANTS;
INTEGRATED COAL GASIFICATION COMBINED CYCLE (IGCC) POWER PLANTS;
COMBINED CYCLE POWER PLANTS;
|
EID: 0030419085
PISSN: 10540032
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (1)
|
References (0)
|