|
Volumn 4, Issue , 1996, Pages 2934-2941
|
Resolution of some 2-stage hybrid flowshop scheduling problems
a a a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
HEURISTIC METHODS;
LINEAR PROGRAMMING;
MANUFACTURE;
MATHEMATICAL MODELS;
OPTIMIZATION;
PROBLEM SOLVING;
PRODUCTION CONTROL;
SCHEDULING;
FLOWSHOP SCHEDULING PROBLEM;
HEURISTIC RESOLUTION METHODS;
MAXIMUM TARDINESS;
TWO STAGE HYBRID FLOWSHOP;
OPERATIONS RESEARCH;
|
EID: 0030409110
PISSN: 08843627
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (13)
|
References (22)
|