|
Volumn , Issue , 1996, Pages 423-431
|
Horizontal well length: Drill short or long wells?
a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
HEAVY OIL PRODUCTION;
OIL WELL DRILLING;
PETROLEUM RESERVOIRS;
WELL WORKOVER;
WATER CONING;
WATER SHUT OFF METHOD;
WELL SEGMENTATION;
HORIZONTAL WELLS;
|
EID: 0030408967
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.2118/37084-ms Document Type: Conference Paper |
Times cited : (2)
|
References (0)
|