-
1
-
-
0019590377
-
Hierarchical production planning: A single stage system
-
Bitran, G., Haas, E. and Hax, A., 1981. Hierarchical production planning: a single stage system, Oper. Res., 29(4): 717-743.
-
(1981)
Oper. Res.
, vol.29
, Issue.4
, pp. 717-743
-
-
Bitran, G.1
Haas, E.2
Hax, A.3
-
2
-
-
0020103083
-
Hierarchical production planning: A two stage system
-
Bitran, G., Haas, E. and Hax, A., 1982. Hierarchical production planning: a two stage system, Open Res., 30(2): 232-251.
-
(1982)
Open Res.
, vol.30
, Issue.2
, pp. 232-251
-
-
Bitran, G.1
Haas, E.2
Hax, A.3
-
3
-
-
84974861931
-
A two-level production control model with target amount rescheduling
-
Golenko-Ginzburg, D., 1990. A two-level production control model with target amount rescheduling, J. Oper. Res. Soc., 41(11): 1021-1028.
-
(1990)
J. Oper. Res. Soc.
, vol.41
, Issue.11
, pp. 1021-1028
-
-
Golenko-Ginzburg, D.1
-
4
-
-
0011747383
-
Controlling a two-level multi-product system
-
Sydney-Melbourne, December 17-21, 1990
-
Golenko-Ginzburg, D. and Sims, J., 1990. Controlling a Two-Level Multi-Product System. Presented at the 1990 Pacific Conference on Manufacturing, Sydney-Melbourne, December 17-21, 1990, Vol. 1, pp. 228-242.
-
(1990)
1990 Pacific Conference on Manufacturing
, vol.1
, pp. 228-242
-
-
Golenko-Ginzburg, D.1
Sims, J.2
-
5
-
-
0000623498
-
Hierarchical control of semiautomated production systems
-
Golenko-Ginzburg, D. and Sinuany-Stern, Z., 1993. Hierarchical control of semiautomated production systems, Prod. Planning Control, 4(4): 361-370.
-
(1993)
Prod. Planning Control
, vol.4
, Issue.4
, pp. 361-370
-
-
Golenko-Ginzburg, D.1
Sinuany-Stern, Z.2
-
6
-
-
0020247073
-
Hierarchical control in large-scale industrial systems
-
Y.Y. Haimes, (Ed.), North-Holland, Amsterdam
-
Lefkowitz, I., 1982. Hierarchical control in large-scale industrial systems, Large Scale Systems, In: Y.Y. Haimes, (Ed.), North-Holland, Amsterdam.
-
(1982)
Large Scale Systems
-
-
Lefkowitz, I.1
-
7
-
-
0011748603
-
Hierarchical production planning and scheduling in a flexible manufacturing system
-
RWTH Aachen
-
Sawik, T., 1991. Hierarchical Production Planning and Scheduling in a Flexible Manufacturing System. Presented at the 11th EURO Congress, RWTH Aachen.
-
(1991)
11th Euro Congress
-
-
Sawik, T.1
-
8
-
-
0342398783
-
A static adaptive approach for solving a dynamic problem of production control
-
D. Murray-Smith, J. Stephenson, and R. Zobel, (Eds.), Edinburgh
-
Sinuany-Stern, Z., Golenko-Ginzburg, D. and Keren, B., 1989. A Static Adaptive Approach for Solving a Dynamic Problem of Production Control, in: D. Murray-Smith, J. Stephenson, and R. Zobel, (Eds.), Proc. 3rd European Simulation Congress, Edinburgh, pp. 508-511.
-
(1989)
Proc. 3rd European Simulation Congress
, pp. 508-511
-
-
Sinuany-Stern, Z.1
Golenko-Ginzburg, D.2
Keren, B.3
-
9
-
-
0025671331
-
Physical simulation of a two stage control algorithm for FMS
-
Sinuany-Stern, Z. and Golenko-Ginzburg, D., 1990. Physical simulation of a two stage control algorithm for FMS, Comput. Indust. Eng., 18(4): 535-545.
-
(1990)
Comput. Indust. Eng.
, vol.18
, Issue.4
, pp. 535-545
-
-
Sinuany-Stern, Z.1
Golenko-Ginzburg, D.2
-
10
-
-
0027607825
-
On-line production control using the EVPI approach
-
Sinuany-Stern, Z., Golenko-Ginzburg, D. and Keren, B., 1993. On-Line Production Control Using the EVPI Approach. Eur. J. Oper. Res., 67: 344-357.
-
(1993)
Eur. J. Oper. Res.
, vol.67
, pp. 344-357
-
-
Sinuany-Stern, Z.1
Golenko-Ginzburg, D.2
Keren, B.3
|