|
Volumn , Issue , 1996, Pages 1135-1140
|
Use of resource blocks in SLAM II for the evaluation of operator-machine assignments
|
Author keywords
[No Author keywords available]
|
Indexed keywords
EVALUATION;
FABRICATION;
PERSONNEL RATING;
SEMICONDUCTOR DEVICE MANUFACTURE;
SIMULATION;
OPERATOR-MACHINE ASSIGNMENTS;
RESOURCE BLOCKS;
SIMULATION MODEL;
MAN MACHINE SYSTEMS;
|
EID: 0030388796
PISSN: 02750708
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1145/256562.256923 Document Type: Conference Paper |
Times cited : (2)
|
References (5)
|