-
1
-
-
0004274964
-
-
American Production and Inventory Control Society, Falls Church, VA
-
APICS Dictionary, 7th ed. Edited by J. F. Cox III, J. H. Blackstone, Jr., and M. S. Spencer. American Production and Inventory Control Society, Falls Church, VA, 1992.
-
(1992)
APICS Dictionary, 7th Ed.
-
-
Cox III, J.F.1
Blackstone Jr., J.H.2
Spencer, M.S.3
-
2
-
-
0011718706
-
Capacity Planning Techniques in Manufacturing Planning and Control Systems: Information Requirements and Operational Features
-
Berry, W. C., T. Schmitt, and T. E. Vollmann. "Capacity Planning Techniques in Manufacturing Planning and Control Systems: Information Requirements and Operational Features." Journal of Operations Management 3 (1982): 13-25.
-
(1982)
Journal of Operations Management
, vol.3
, pp. 13-25
-
-
Berry, W.C.1
Schmitt, T.2
Vollmann, T.E.3
-
3
-
-
1542604173
-
European Recycling
-
Birch, S. "European Recycling." Automotive Engineering 101, no. 4 (1993): 40-43.
-
(1993)
Automotive Engineering
, vol.101
, Issue.4
, pp. 40-43
-
-
Birch, S.1
-
4
-
-
0004140981
-
-
Cincinnati, OH: South-western Publishing Co.
-
Blackstone, J. H. Capacity Management. Cincinnati, OH: South-western Publishing Co., 1989.
-
(1989)
Capacity Management
-
-
Blackstone, J.H.1
-
5
-
-
0025593121
-
A Product Load Profile Approach to MRP Capacity Planning
-
Cheng, T. C. E. "A Product Load Profile Approach to MRP Capacity Planning. " Computers & Industrial Engineering 18 (1990): 83-91.
-
(1990)
Computers & Industrial Engineering
, vol.18
, pp. 83-91
-
-
Cheng, T.C.E.1
-
6
-
-
0023288854
-
A Simulation Study of Capacity Planning with Uncertain Operation Times
-
_. "A Simulation Study of Capacity Planning with Uncertain Operation Times." International Journal of Production Research 25 (1987): 245-258.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 245-258
-
-
-
7
-
-
0002138059
-
The Challenge of Going Green
-
Clarke, R. A., R. N. Stavins, J. L. Greeno, and J. L. Bavaria. "The Challenge of Going Green." Harvard Business Review 72, no. 4 (1994): 37-50.
-
(1994)
Harvard Business Review
, vol.72
, Issue.4
, pp. 37-50
-
-
Clarke, R.A.1
Stavins, R.N.2
Greeno, J.L.3
Bavaria, J.L.4
-
8
-
-
1542394630
-
Three Rs: Recycle, Reclaim, Remanufacture
-
Coates, J. F. "Three Rs: Recycle, Reclaim, Remanufacture." Research Technology Management 36, no. 3 (1993): 6-7.
-
(1993)
Research Technology Management
, vol.36
, Issue.3
, pp. 6-7
-
-
Coates, J.F.1
-
9
-
-
0041142818
-
Replace, Rebuild or Remanufacture
-
Cohen, M. "Replace, Rebuild or Remanufacture." Equipment Management 16, no. 1 (1988): 22-26.
-
(1988)
Equipment Management
, vol.16
, Issue.1
, pp. 22-26
-
-
Cohen, M.1
-
10
-
-
1542499563
-
Is Repair / Remanufacturing Really Different?
-
Falls Church, VA: American Production and Inventory Control Society
-
Fourcaud, R. "Is Repair / Remanufacturing Really Different?" In APICS 1993 Remanufacturing Seminar Proceedings. Falls Church, VA: American Production and Inventory Control Society: 4-9.
-
APICS 1993 Remanufacturing Seminar Proceedings
, pp. 4-9
-
-
Fourcaud, R.1
-
12
-
-
0029371528
-
A Simulation Model of Drum-Buffer-Rope for Production Planning and Control at a Naval Aviation Depot
-
_. "A Simulation Model of Drum-Buffer-Rope for Production Planning and Control at a Naval Aviation Depot. Simulation 65 (1995): 157-168.
-
(1995)
Simulation
, vol.65
, pp. 157-168
-
-
-
14
-
-
0023361256
-
Remanufacturing by Design, the Missing Link
-
Haynsworth, H. C., and R. T. Lyons. "Remanufacturing by Design, the Missing Link." Production and Inventory Management Journal 28, no. 2 (1987): 24-29.
-
(1987)
Production and Inventory Management Journal
, vol.28
, Issue.2
, pp. 24-29
-
-
Haynsworth, H.C.1
Lyons, R.T.2
-
15
-
-
0024650265
-
Can Old Workhorses Still Pull their Weight?
-
Heeb, H. B. "Can Old Workhorses Still Pull their Weight?" Manufacturing Engineering 102, no. 4 (1989): 74-76.
-
(1989)
Manufacturing Engineering
, vol.102
, Issue.4
, pp. 74-76
-
-
Heeb, H.B.1
-
16
-
-
0040236998
-
Designed for Disassemble
-
November
-
Inoue, H. "Designed for Disassemble." Look Japan (November 1992): 24-25.
-
(1992)
Look Japan
, pp. 24-25
-
-
Inoue, H.1
-
18
-
-
0026199514
-
What Does it Mean to be Green?
-
Kleiner, J. A. '"What Does it Mean to be Green?" Harvard Business Review 69, no. 4 (1993): 38-47.
-
(1993)
Harvard Business Review
, vol.69
, Issue.4
, pp. 38-47
-
-
Kleiner, J.A.1
-
19
-
-
1542394629
-
Designing the Modern Automobile for Recycling
-
Edited by B. R. Allenby and D. J. Richards. Washington, DC: National Academy Press
-
Klimisch, R. L. "Designing the Modern Automobile for Recycling." In The Greening of Industrial Ecosystems. Edited by B. R. Allenby and D. J. Richards. Washington, DC: National Academy Press, 1994.
-
(1994)
The Greening of Industrial Ecosystems
-
-
Klimisch, R.L.1
-
20
-
-
0011725222
-
Core Obsolescence Forecasting in Remanufacturing
-
Krupp, J. A. G. "Core Obsolescence Forecasting in Remanufacturing." Production and Inventory Management Journal 33, no. 2 (1992): 12-17.
-
(1992)
Production and Inventory Management Journal
, vol.33
, Issue.2
, pp. 12-17
-
-
Krupp, J.A.G.1
-
21
-
-
0027908820
-
Structuring Bills of Material for Automotive Remanufacturing
-
_. "Structuring Bills of Material for Automotive Remanufacturing." Production and Inventory Management Journal 34, no. 4 (1993): 46-52.
-
(1993)
Production and Inventory Management Journal
, vol.34
, Issue.4
, pp. 46-52
-
-
-
22
-
-
0021370421
-
Remanufacturing
-
Lund, R. I. "Remanufacturing." Technology Review 87, no. 2 (1984): 18-23.
-
(1984)
Technology Review
, vol.87
, Issue.2
, pp. 18-23
-
-
Lund, R.I.1
-
25
-
-
0039052992
-
The Impact of Lot Size and Production Scheduling on Inventory Investment in a Remanufacturing Environment
-
Perry, J. H. "The Impact of Lot Size and Production Scheduling on Inventory Investment in a Remanufacturing Environment." Production and Inventory Management Journal 32, no. 3 (1991): 41-45.
-
(1991)
Production and Inventory Management Journal
, vol.32
, Issue.3
, pp. 41-45
-
-
Perry, J.H.1
-
26
-
-
0040606713
-
World's First Automobile Disassembly Plant
-
Redd, A. "World's First Automobile Disassembly Plant." Biocycle: Journal of Waste Recycling 33, no. 2 (1992): 82-83.
-
(1992)
Biocycle: Journal of Waste Recycling
, vol.33
, Issue.2
, pp. 82-83
-
-
Redd, A.1
-
27
-
-
84985849832
-
An Analysis of Capacity Planning Procedures for Material Requirements Planning Systems
-
Schmitt, T. G., W. L. Berry, and T. E. Vollmann. "An Analysis of Capacity Planning Procedures for Material Requirements Planning Systems." Decision Sciences 15 (1984): 522-541.
-
(1984)
Decision Sciences
, vol.15
, pp. 522-541
-
-
Schmitt, T.G.1
Berry, W.L.2
Vollmann, T.E.3
-
28
-
-
0026840066
-
The Mechanics of Remanufacture
-
Sprow, E. "The Mechanics of Remanufacture." Manufacturing Engineering 108, no. 3 (1992): 38-45.
-
(1992)
Manufacturing Engineering
, vol.108
, Issue.3
, pp. 38-45
-
-
Sprow, E.1
-
29
-
-
0025402313
-
Making the Right Moves in Machine Make-Over
-
Stauffer, R. N. "Making the Right Moves in Machine Make-Over." Manufacturing Engineering 104, no. 3 (1990): 49-53.
-
(1990)
Manufacturing Engineering
, vol.104
, Issue.3
, pp. 49-53
-
-
Stauffer, R.N.1
-
30
-
-
0027594827
-
The State of Garbage in America
-
Steuteville, R., N. Goldstein, and K. Grotz. "The State of Garbage in America." Biocycle: Journal of Waste Recycling 34, no. 6 (1993): 32-37.
-
(1993)
Biocycle: Journal of Waste Recycling
, vol.34
, Issue.6
, pp. 32-37
-
-
Steuteville, R.1
Goldstein, N.2
Grotz, K.3
-
31
-
-
0039363447
-
Specifying Replacement Parts: The Buyer Beware
-
Sturgess, S. "Specifying Replacement Parts: The Buyer Beware." World Wastes 35, no. 8 (1992): 50-54.
-
(1992)
World Wastes
, vol.35
, Issue.8
, pp. 50-54
-
-
Sturgess, S.1
-
32
-
-
84968082184
-
Strategic Issues in Product Recovery Management
-
Thierry, M., M. Salomon, J. Von Nunen, and L. Van Wassenhove. "Strategic Issues in Product Recovery Management." California Management Review 37, no. 2 (1995): 114-135.
-
(1995)
California Management Review
, vol.37
, Issue.2
, pp. 114-135
-
-
Thierry, M.1
Salomon, M.2
Von Nunen, J.3
Van Wassenhove, L.4
-
33
-
-
0039955752
-
Remanufacture Does More than Just Save on Investment
-
Toensmeier, P. A. "Remanufacture Does More than Just Save on Investment." Modern Plastics 69, no. 4 (1992): 77-79.
-
(1992)
Modern Plastics
, vol.69
, Issue.4
, pp. 77-79
-
-
Toensmeier, P.A.1
-
35
-
-
0343422888
-
Know the MRP II Fundamentals that Support Remanufacturing
-
Wassweiler, W. "Know the MRP II Fundamentals that Support Remanufacturing." Manufacturing Systems 11 (1993): 52-55.
-
(1993)
Manufacturing Systems
, vol.11
, pp. 52-55
-
-
Wassweiler, W.1
-
36
-
-
0039955753
-
Remanufacturing: Upgrading Can be Better than Buying New
-
Wilder, R. V. "Remanufacturing: Upgrading Can be Better than Buying New." Modern Plastics 65, no. 4 (1988): 73-77.
-
(1988)
Modern Plastics
, vol.65
, Issue.4
, pp. 73-77
-
-
Wilder, R.V.1
|