메뉴 건너뛰기




Volumn 37, Issue 4, 1996, Pages 70-74

Are production systems ready for the green revolution?

Author keywords

[No Author keywords available]

Indexed keywords

INVENTORY CONTROL; MANAGEMENT; MANUFACTURE; MODELS; PERFORMANCE; PLANNING; PRODUCTION CONTROL; SIMULATION;

EID: 0030386129     PISSN: 08978336     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (28)

References (36)
  • 2
    • 0011718706 scopus 로고
    • Capacity Planning Techniques in Manufacturing Planning and Control Systems: Information Requirements and Operational Features
    • Berry, W. C., T. Schmitt, and T. E. Vollmann. "Capacity Planning Techniques in Manufacturing Planning and Control Systems: Information Requirements and Operational Features." Journal of Operations Management 3 (1982): 13-25.
    • (1982) Journal of Operations Management , vol.3 , pp. 13-25
    • Berry, W.C.1    Schmitt, T.2    Vollmann, T.E.3
  • 3
    • 1542604173 scopus 로고
    • European Recycling
    • Birch, S. "European Recycling." Automotive Engineering 101, no. 4 (1993): 40-43.
    • (1993) Automotive Engineering , vol.101 , Issue.4 , pp. 40-43
    • Birch, S.1
  • 4
    • 0004140981 scopus 로고
    • Cincinnati, OH: South-western Publishing Co.
    • Blackstone, J. H. Capacity Management. Cincinnati, OH: South-western Publishing Co., 1989.
    • (1989) Capacity Management
    • Blackstone, J.H.1
  • 5
    • 0025593121 scopus 로고
    • A Product Load Profile Approach to MRP Capacity Planning
    • Cheng, T. C. E. "A Product Load Profile Approach to MRP Capacity Planning. " Computers & Industrial Engineering 18 (1990): 83-91.
    • (1990) Computers & Industrial Engineering , vol.18 , pp. 83-91
    • Cheng, T.C.E.1
  • 6
    • 0023288854 scopus 로고
    • A Simulation Study of Capacity Planning with Uncertain Operation Times
    • _. "A Simulation Study of Capacity Planning with Uncertain Operation Times." International Journal of Production Research 25 (1987): 245-258.
    • (1987) International Journal of Production Research , vol.25 , pp. 245-258
  • 8
    • 1542394630 scopus 로고
    • Three Rs: Recycle, Reclaim, Remanufacture
    • Coates, J. F. "Three Rs: Recycle, Reclaim, Remanufacture." Research Technology Management 36, no. 3 (1993): 6-7.
    • (1993) Research Technology Management , vol.36 , Issue.3 , pp. 6-7
    • Coates, J.F.1
  • 9
    • 0041142818 scopus 로고
    • Replace, Rebuild or Remanufacture
    • Cohen, M. "Replace, Rebuild or Remanufacture." Equipment Management 16, no. 1 (1988): 22-26.
    • (1988) Equipment Management , vol.16 , Issue.1 , pp. 22-26
    • Cohen, M.1
  • 10
    • 1542499563 scopus 로고    scopus 로고
    • Is Repair / Remanufacturing Really Different?
    • Falls Church, VA: American Production and Inventory Control Society
    • Fourcaud, R. "Is Repair / Remanufacturing Really Different?" In APICS 1993 Remanufacturing Seminar Proceedings. Falls Church, VA: American Production and Inventory Control Society: 4-9.
    • APICS 1993 Remanufacturing Seminar Proceedings , pp. 4-9
    • Fourcaud, R.1
  • 12
    • 0029371528 scopus 로고
    • A Simulation Model of Drum-Buffer-Rope for Production Planning and Control at a Naval Aviation Depot
    • _. "A Simulation Model of Drum-Buffer-Rope for Production Planning and Control at a Naval Aviation Depot. Simulation 65 (1995): 157-168.
    • (1995) Simulation , vol.65 , pp. 157-168
  • 15
    • 0024650265 scopus 로고
    • Can Old Workhorses Still Pull their Weight?
    • Heeb, H. B. "Can Old Workhorses Still Pull their Weight?" Manufacturing Engineering 102, no. 4 (1989): 74-76.
    • (1989) Manufacturing Engineering , vol.102 , Issue.4 , pp. 74-76
    • Heeb, H.B.1
  • 16
    • 0040236998 scopus 로고
    • Designed for Disassemble
    • November
    • Inoue, H. "Designed for Disassemble." Look Japan (November 1992): 24-25.
    • (1992) Look Japan , pp. 24-25
    • Inoue, H.1
  • 18
    • 0026199514 scopus 로고
    • What Does it Mean to be Green?
    • Kleiner, J. A. '"What Does it Mean to be Green?" Harvard Business Review 69, no. 4 (1993): 38-47.
    • (1993) Harvard Business Review , vol.69 , Issue.4 , pp. 38-47
    • Kleiner, J.A.1
  • 19
    • 1542394629 scopus 로고
    • Designing the Modern Automobile for Recycling
    • Edited by B. R. Allenby and D. J. Richards. Washington, DC: National Academy Press
    • Klimisch, R. L. "Designing the Modern Automobile for Recycling." In The Greening of Industrial Ecosystems. Edited by B. R. Allenby and D. J. Richards. Washington, DC: National Academy Press, 1994.
    • (1994) The Greening of Industrial Ecosystems
    • Klimisch, R.L.1
  • 20
    • 0011725222 scopus 로고
    • Core Obsolescence Forecasting in Remanufacturing
    • Krupp, J. A. G. "Core Obsolescence Forecasting in Remanufacturing." Production and Inventory Management Journal 33, no. 2 (1992): 12-17.
    • (1992) Production and Inventory Management Journal , vol.33 , Issue.2 , pp. 12-17
    • Krupp, J.A.G.1
  • 21
    • 0027908820 scopus 로고
    • Structuring Bills of Material for Automotive Remanufacturing
    • _. "Structuring Bills of Material for Automotive Remanufacturing." Production and Inventory Management Journal 34, no. 4 (1993): 46-52.
    • (1993) Production and Inventory Management Journal , vol.34 , Issue.4 , pp. 46-52
  • 22
    • 0021370421 scopus 로고
    • Remanufacturing
    • Lund, R. I. "Remanufacturing." Technology Review 87, no. 2 (1984): 18-23.
    • (1984) Technology Review , vol.87 , Issue.2 , pp. 18-23
    • Lund, R.I.1
  • 25
    • 0039052992 scopus 로고
    • The Impact of Lot Size and Production Scheduling on Inventory Investment in a Remanufacturing Environment
    • Perry, J. H. "The Impact of Lot Size and Production Scheduling on Inventory Investment in a Remanufacturing Environment." Production and Inventory Management Journal 32, no. 3 (1991): 41-45.
    • (1991) Production and Inventory Management Journal , vol.32 , Issue.3 , pp. 41-45
    • Perry, J.H.1
  • 26
    • 0040606713 scopus 로고
    • World's First Automobile Disassembly Plant
    • Redd, A. "World's First Automobile Disassembly Plant." Biocycle: Journal of Waste Recycling 33, no. 2 (1992): 82-83.
    • (1992) Biocycle: Journal of Waste Recycling , vol.33 , Issue.2 , pp. 82-83
    • Redd, A.1
  • 27
    • 84985849832 scopus 로고
    • An Analysis of Capacity Planning Procedures for Material Requirements Planning Systems
    • Schmitt, T. G., W. L. Berry, and T. E. Vollmann. "An Analysis of Capacity Planning Procedures for Material Requirements Planning Systems." Decision Sciences 15 (1984): 522-541.
    • (1984) Decision Sciences , vol.15 , pp. 522-541
    • Schmitt, T.G.1    Berry, W.L.2    Vollmann, T.E.3
  • 28
    • 0026840066 scopus 로고
    • The Mechanics of Remanufacture
    • Sprow, E. "The Mechanics of Remanufacture." Manufacturing Engineering 108, no. 3 (1992): 38-45.
    • (1992) Manufacturing Engineering , vol.108 , Issue.3 , pp. 38-45
    • Sprow, E.1
  • 29
    • 0025402313 scopus 로고
    • Making the Right Moves in Machine Make-Over
    • Stauffer, R. N. "Making the Right Moves in Machine Make-Over." Manufacturing Engineering 104, no. 3 (1990): 49-53.
    • (1990) Manufacturing Engineering , vol.104 , Issue.3 , pp. 49-53
    • Stauffer, R.N.1
  • 31
    • 0039363447 scopus 로고
    • Specifying Replacement Parts: The Buyer Beware
    • Sturgess, S. "Specifying Replacement Parts: The Buyer Beware." World Wastes 35, no. 8 (1992): 50-54.
    • (1992) World Wastes , vol.35 , Issue.8 , pp. 50-54
    • Sturgess, S.1
  • 33
    • 0039955752 scopus 로고
    • Remanufacture Does More than Just Save on Investment
    • Toensmeier, P. A. "Remanufacture Does More than Just Save on Investment." Modern Plastics 69, no. 4 (1992): 77-79.
    • (1992) Modern Plastics , vol.69 , Issue.4 , pp. 77-79
    • Toensmeier, P.A.1
  • 35
    • 0343422888 scopus 로고
    • Know the MRP II Fundamentals that Support Remanufacturing
    • Wassweiler, W. "Know the MRP II Fundamentals that Support Remanufacturing." Manufacturing Systems 11 (1993): 52-55.
    • (1993) Manufacturing Systems , vol.11 , pp. 52-55
    • Wassweiler, W.1
  • 36
    • 0039955753 scopus 로고
    • Remanufacturing: Upgrading Can be Better than Buying New
    • Wilder, R. V. "Remanufacturing: Upgrading Can be Better than Buying New." Modern Plastics 65, no. 4 (1988): 73-77.
    • (1988) Modern Plastics , vol.65 , Issue.4 , pp. 73-77
    • Wilder, R.V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.