메뉴 건너뛰기




Volumn 9, Issue 2-3, 1996, Pages 126-130

Analysis of present scheme of MRPII-CAD integration: Problems and prospects

Author keywords

Automated manufacturing system; Automation; MRPII system analysis; MRPII CAD integration

Indexed keywords

COMPUTER AIDED DESIGN; COMPUTER AIDED MANUFACTURING; FACTORY AUTOMATION; PRODUCTION CONTROL; SYSTEMS ANALYSIS;

EID: 0030377678     PISSN: 09528091     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (12)
  • 1
    • 3342982164 scopus 로고
    • Manufacturing parts features: CIM's technological common denominator
    • editor: Vincent A. Mabert and F.R. Jacobs, Industrial Engineering and Management Press
    • Atkinson, A. (1991) 'Manufacturing parts' features: CIM's technological common denominator', Integrated Production Systems: Design, Planning, Control, and Scheduling, 4th edn. editor: Vincent A. Mabert and F.R. Jacobs, Industrial Engineering and Management Press, pp. 155-167.
    • (1991) Integrated Production Systems: Design, Planning, Control, and Scheduling, 4th Edn. , pp. 155-167
    • Atkinson, A.1
  • 5
    • 0024882895 scopus 로고
    • A hierarchical structure for form features
    • Gindy, N.N.Z. (1989) 'A hierarchical structure for form features', International Journal of Production Research, Vol. 27, No. 12, pp. 2089-2103.
    • (1989) International Journal of Production Research , vol.27 , Issue.12 , pp. 2089-2103
    • Gindy, N.N.Z.1
  • 6
    • 3343014728 scopus 로고
    • Integrating CAD and MRPII systems
    • Nanyang Technological Institute, Singapore
    • Jin, C.T., Choon, H.N. and Teck, Y.K. (1991) 'Integrating CAD and MRPII systems', Annual Report 1990/1991, Nanyang Technological Institute, Singapore.
    • (1991) Annual Report 1990/1991
    • Jin, C.T.1    Choon, H.N.2    Teck, Y.K.3
  • 9
    • 3343026082 scopus 로고
    • An integration plan: ISO 9000 quality management system and manufacturing resource planning (MRPII)
    • Duendin and Queenstown, New Zealand, 29 May-1 June
    • Pandey, P.C. and Hasin, M.A.A. (1995) 'An integration plan: ISO 9000 quality management system and manufacturing resource planning (MRPII)', Proceedings of the Pan-Pacific Conference XII, Duendin and Queenstown, New Zealand, 29 May-1 June, pp. 264-266.
    • (1995) Proceedings of the Pan-Pacific Conference XII , pp. 264-266
    • Pandey, P.C.1    Hasin, M.A.A.2
  • 11
    • 0026869290 scopus 로고
    • Process plan generation for sheet metal parts using an integrated feature-based expert system approach
    • Smith, J.S., Cohen, P.H., Davis, J.W. and Irani, S.A. (1992) 'Process plan generation for sheet metal parts using an integrated feature-based expert system approach', International Journal of Production Research, Vol. 30, No. 5, pp. 1175-1190.
    • (1992) International Journal of Production Research , vol.30 , Issue.5 , pp. 1175-1190
    • Smith, J.S.1    Cohen, P.H.2    Davis, J.W.3    Irani, S.A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.