|
Volumn , Issue , 1996, Pages 281-286
|
Integration of just-in-time production and material handling for an assembly environment
a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ASSEMBLY;
COST EFFECTIVENESS;
HEURISTIC METHODS;
JUST IN TIME PRODUCTION;
MACHINERY;
MATERIALS HANDLING;
MATERIALS HANDLING EQUIPMENT;
OPTIMIZATION;
CUMULATIVE LEAD TIME;
INVENTORY HOLDING COSTS;
MATERIAL HANDLING SYSTEMS SCHEDULING;
SCHEDULING;
|
EID: 0030362321
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (2)
|
References (14)
|