Volumn 26, Issue 4, 1996, Pages 287-294

Discrete time parallel-machine scheduling: A case of ship scheduling

Author keywords

Integer programming; Scheduling

Indexed keywords

INTEGER PROGRAMMING; MATHEMATICAL MODELS; PARALLEL PROCESSING SYSTEMS; SCHEDULING; SHIPS;

EID: 0030358302     PISSN: 0305215X     EISSN: None     Source Type: Journal    
DOI: 10.1080/03052159608941123     Document Type: Article
Times cited : (8)

References (19)
  • 1
    • 0025474221 scopus 로고
    • A state-of-the-art review of parallel-machine scheduling research
    • Cheng, T. C. E. and Sin, C. C. S. (1990) A state-of-the-art review of parallel-machine scheduling research. European J. Operational Res., 47, 271-292.
    • (1990) European J. Operational Res. , vol.47 , pp. 271-292
    • Cheng, T.C.E.1    Sin, C.C.S.2
  • 3
    • 0024107852 scopus 로고
    • On the two-phase method for preemptive scheduling
    • DeWerra, D. (1988) On the two-phase method for preemptive scheduling. European J. Operational Res., 37, 227-235.
    • (1988) European J. Operational Res. , vol.37 , pp. 227-235
    • DeWerra, D.1
  • 4
    • 0024628849 scopus 로고
    • Preemptive scheduling of two uniform machines to minimize the number of late jobs
    • Lawler, E. L. and Martel, C .U. (1989) Preemptive scheduling of two uniform machines to minimize the number of late jobs. Operations Res., 37, 314-318.
    • (1989) Operations Res. , vol.37 , pp. 314-318
    • Lawler, E.L.1    Martel, C.U.2
  • 5
    • 0027906633 scopus 로고
    • Two parallel machine sequencing problems involving controllable job processing times
    • Alidaee, B. and Ahmadian, A. (1993) Two parallel machine sequencing problems involving controllable job processing times. European J. Operational Res., 70, 335-341.
    • (1993) European J. Operational Res. , vol.70 , pp. 335-341
    • Alidaee, B.1    Ahmadian, A.2
  • 6
    • 0025700720 scopus 로고
    • Scheduling stochastic jobs with due dates on parallel machines
    • Emmons, H. and Pinedo, M. (1990) Scheduling stochastic jobs with due dates on parallel machines. European J. Operational Res., 47, 49-55.
    • (1990) European J. Operational Res. , vol.47 , pp. 49-55
    • Emmons, H.1    Pinedo, M.2
  • 7
    • 84989427485 scopus 로고
    • Scheduling to minimize makespan on unequal parallel processors
    • De, P. and Morton, T. E. (1980) Scheduling to minimize makespan on unequal parallel processors. Decision Sci., 11, 586-602.
    • (1980) Decision Sci. , vol.11 , pp. 586-602
    • De, P.1    Morton, T.E.2
  • 8
    • 0023400268 scopus 로고
    • Parallel machine scheduling: Processing rates dependent on number of jobs in operations
    • Dror, M., Stern, H. I. and Lenstra, J. K. (1987) Parallel machine scheduling: Processing rates dependent on number of jobs in operations. Management Sci., 33. 1001-1009.
    • (1987) Management Sci. , vol.33 , pp. 1001-1009
    • Dror, M.1    Stern, H.I.2    Lenstra, J.K.3
  • 9
    • 0020815626 scopus 로고
    • Solving large-scale zero-one linear programming problems
    • Crowder, H., Johnson, E. L. and Padberg, M. (1983) Solving large-scale zero-one linear programming problems. Operations Res., 31, 803-834.
    • (1983) Operations Res. , vol.31 , pp. 803-834
    • Crowder, H.1    Johnson, E.L.2    Padberg, M.3
  • 10
    • 0022101121 scopus 로고
    • Solving 0-1 integer programming problems arising from large scale planning models
    • Johnson, E. L., Kostreva, M. M. and Suhl, U. H. (1985) Solving 0-1 integer programming problems arising from large scale planning models. Operations Res., 33, 803-819.
    • (1985) Operations Res. , vol.33 , pp. 803-819
    • Johnson, E.L.1    Kostreva, M.M.2    Suhl, U.H.3
  • 11
    • 0018986005 scopus 로고
    • Scheduling jobs on two facilities to minimize makespan
    • Bulfin, R. L. and Parker, R. G. (1980) Scheduling jobs on two facilities to minimize makespan. Management Sci., 26, 202-214.
    • (1980) Management Sci. , vol.26 , pp. 202-214
    • Bulfin, R.L.1    Parker, R.G.2
  • 12
    • 0025413493 scopus 로고
    • Some heuristics for scheduling jobs on parallel machines with setups
    • So, K. C. (1990) Some heuristics for scheduling jobs on parallel machines with setups. Management Sci., 36, 467-475.
    • (1990) Management Sci. , vol.36 , pp. 467-475
    • So, K.C.1
  • 13
    • 0027906580 scopus 로고
    • A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems
    • Webster, S. T. (1983) A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems. European J. Operational Res., 70, 327-334.
    • (1983) European J. Operational Res. , vol.70 , pp. 327-334
    • Webster, S.T.1
  • 14
    • 0020707231 scopus 로고
    • Cargo ships routing and scheduling: Survey of models and problems
    • Ronen, D. (1983) Cargo ships routing and scheduling: Survey of models and problems. European J. Operational Res., 12, 119-126.
    • (1983) European J. Operational Res. , vol.12 , pp. 119-126
    • Ronen, D.1
  • 15
    • 0027870674 scopus 로고
    • Ship scheduling: The last decade
    • Ronen, D. (1993) Ship scheduling: The last decade. European J. Operational Res., 71, 325-333.
    • (1993) European J. Operational Res. , vol.71 , pp. 325-333
    • Ronen, D.1
  • 16
    • 5544277984 scopus 로고
    • Knowledge-based approach to the optimal dock arrangement
    • Kao, C., Li, D. C., Wu, C. and Tsai, C. C. (1990) knowledge-based approach to the optimal dock arrangement. International J. Systems Sci., 21, 2209-2215.
    • (1990) International J. Systems Sci. , vol.21 , pp. 2209-2215
    • Kao, C.1    Li, D.C.2    Wu, C.3    Tsai, C.C.4
  • 17
    • 0018685640 scopus 로고
    • Evaluation of a heuristic for scheduling independent jobs on parallel identical processors
    • Dogramaci, A. and Surkis, J. (1979) Evaluation of a heuristic for scheduling independent jobs on parallel identical processors. Management Sci., 25, 1208-1216.
    • (1979) Management Sci. , vol.25 , pp. 1208-1216
    • Dogramaci, A.1    Surkis, J.2
  • 19
    • 0016883405 scopus 로고
    • Algorithm for scheduling independent tasks
    • Sahni, S. K. (1976) Algorithm for scheduling independent tasks. J. Asso. Computing Machinery, 23, 116-127.
    • (1976) J. Asso. Computing Machinery , vol.23 , pp. 116-127
    • Sahni, S.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.