|
Volumn 3, Issue , 1996, Pages 1339-
|
Branch-and-bound approach to minimizing total flowtime and maximum lateness in the two machine scheduling systems
a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
CONCURRENT ENGINEERING;
FUNCTIONS;
JOB ANALYSIS;
SCHEDULING;
BRANCH AND BOUND APPROACH;
OBJECTIVE FUNCTIONS;
MACHINE SHOPS;
|
EID: 0030354562
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (1)
|
References (0)
|