메뉴 건너뛰기




Volumn 24, Issue 6, 1996, Pages 339-350

Construction process performance variability: Focus on labour productivity

Author keywords

Labour productivity; Process performance; Statistical distribution; Tanzania; Variability

Indexed keywords

COMPETITION; CONCRETE CONSTRUCTION; COSTS; ESTIMATION; EXCAVATION; PERFORMANCE; PERSONNEL; PRODUCTIVITY; STATISTICAL METHODS;

EID: 0030287417     PISSN: 09613218     EISSN: None     Source Type: Journal    
DOI: 10.1080/09613219608727554     Document Type: Article
Times cited : (6)

References (50)
  • 3
    • 0029207882 scopus 로고
    • Benchmarking; performance improvement toward competitive advantage
    • Lema, N.M. and Price, A D.F. (1994) Benchmarking; performance improvement toward competitive advantage. Journal of Management in Engineering, 11(1), 28-36.
    • (1994) Journal of Management in Engineering , vol.11 , Issue.1 , pp. 28-36
    • Lema, N.M.1    Price, A.D.F.2
  • 4
    • 0004178374 scopus 로고
    • Joint review of Procurement and Contractual Arrangements in the United Kingdom Construction Industry, Final Report
    • Latham, M. (1994) 'Constructing the Team'. Joint review of Procurement and Contractual Arrangements in the United Kingdom Construction Industry, Final Report.
    • (1994) Constructing the Team
    • Latham, M.1
  • 7
    • 0003656231 scopus 로고
    • Technical Report No. 72 Centre for Integrated Facility Engineering, Department of Civil Engineering, Stanford University, California, September
    • Koskela, L (1992) 'Application of New Production Philosophy to Construction.' Technical Report No. 72 Centre for Integrated Facility Engineering, Department of Civil Engineering, Stanford University, California, September
    • (1992) Application of New Production Philosophy to Construction
    • Koskela, L.1
  • 9
    • 5844255413 scopus 로고
    • The measurement of productivity in the construction industry
    • Lowe, G. (1987) The measurement of productivity in the construction industry. Construction Management and Economics. 5, 101-13
    • (1987) Construction Management and Economics. , vol.5 , pp. 101-113
    • Lowe, G.1
  • 12
    • 5844279716 scopus 로고
    • Bricklayers productivity measurement
    • Emsley, M.W., Duff, A.R. and Zambetakis, D. (1990) Bricklayers productivity measurement. CIB 90, 161-71.
    • (1990) CIB 90 , pp. 161-171
    • Emsley, M.W.1    Duff, A.R.2    Zambetakis, D.3
  • 13
    • 0002408747 scopus 로고
    • Causes of variability in bricklayers productivity
    • Horner, R.M.W. and Talhouni, BT. (1990) Causes of variability in bricklayers productivity. CIB-90, 238-50.
    • (1990) CIB-90 , pp. 238-250
    • Horner, R.M.W.1    Talhouni, B.T.2
  • 25
    • 0019583265 scopus 로고
    • Can work sampling lower construction costs
    • Thomas, H.R. (1981) Can work sampling lower construction costs. Journal of Construction Division, 107(CO2), 263-77.
    • (1981) Journal of Construction Division , vol.107 , Issue.CO2 , pp. 263-277
    • Thomas, H.R.1
  • 28
    • 5844337432 scopus 로고
    • House building productivity: Activity sampling study at Crawley
    • Building Research Establishment, UK
    • Grant, E. and Stevens, A.J. (1982) House building productivity: activity sampling study at Crawley. Internal Note N73, Building Research Establishment, UK.
    • (1982) Internal Note N73
    • Grant, E.1    Stevens, A.J.2
  • 32
    • 0023537362 scopus 로고
    • Problems influencing craftsman's productivity in Nigeria
    • Olomolaiye, P O., Wahab, K.A. and Price, A.D.F. (1987) Problems influencing craftsman's productivity in Nigeria. Building and Environment, 22(3), 317-23.
    • (1987) Building and Environment , vol.22 , Issue.3 , pp. 317-323
    • Olomolaiye, P.O.1    Wahab, K.A.2    Price, A.D.F.3
  • 34
    • 85033841597 scopus 로고    scopus 로고
    • Gardiner and Gardiner (1982) See [19]
    • Gardiner and Gardiner (1982) See [19].
  • 35
    • 5844255412 scopus 로고
    • House-building productivity in USA
    • Shippam, R. (1987) House-building productivity in USA. Building, 15, 127-32.
    • (1987) Building , vol.15 , pp. 127-132
    • Shippam, R.1
  • 36
    • 5844247442 scopus 로고
    • Architects and productivity-2
    • Bishop, D. (1966) Architects and productivity-2, Building, 211(49), 79-82.
    • (1966) Building , vol.211 , Issue.49 , pp. 79-82
    • Bishop, D.1
  • 37
    • 5844272632 scopus 로고
    • A study of the variation in output in building operatives
    • Walker, A. (1971) A study of the variation in output in building operatives, The Architect and Surveyor, 10.
    • (1971) The Architect and Surveyor , vol.10
    • Walker, A.1
  • 39
    • 5844225011 scopus 로고
    • Dimensional disciplines and the output of bricklayers
    • Forbes, W.S. (1971) Dimensional disciplines and the output of bricklayers. Building, 221(35), 82-4.
    • (1971) Building , vol.221 , Issue.35 , pp. 82-84
    • Forbes, W.S.1
  • 40
    • 0041753870 scopus 로고
    • Manhours and interruptions in traditional house building
    • McLeish, D.C.W. (1981) Manhours and interruptions in traditional house building. Building and Environment, 16(1), 59-67.
    • (1981) Building and Environment , vol.16 , Issue.1 , pp. 59-67
    • McLeish, D.C.W.1
  • 46
    • 85033855271 scopus 로고
    • Purdue, Purdue University, Department of Statistics, School of Industrial Engineering. Pritsker and Associates, West Lafayette, USA
    • Department of Statistics (1989) Modelling Input Process with Johnson Distributions. Purdue, Purdue University, Department of Statistics, School of Industrial Engineering. Pritsker and Associates, West Lafayette, USA.
    • (1989) Modelling Input Process with Johnson Distributions
  • 48
    • 0000738834 scopus 로고
    • Monte Carlo methods and the PERT problem
    • Van Sykes, R.M (1963) Monte Carlo methods and the PERT problem. Operations Research, 11, 839-60.
    • (1963) Operations Research , vol.11 , pp. 839-860
    • Van Sykes, R.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.