|
Volumn 108, Issue 6, 1996, Pages 41-57
|
Navy proactive maintenance
a,b,c,d,e,f,g,h |
Author keywords
[No Author keywords available]
|
Indexed keywords
FAILURE ANALYSIS;
MACHINE DESIGN;
MAINTENANCE;
PRODUCTIVITY;
STRATEGIC PLANNING;
SYSTEMS ENGINEERING;
CONDITION BASED MAINTENANCE METHODOLOGIES;
PREVENTIVE MAINTENANCE;
PROACTIVE MAINTENANCE (PAM);
RECURRING PREMATURE EQUIPMENT FAILURE;
RELIABILITY CENTERED MAINTENANCE (RCM);
MARINE ENGINEERING;
|
EID: 0030284475
PISSN: 00281425
EISSN: None
Source Type: Journal
DOI: 10.1111/j.1559-3584.1996.tb01589.x Document Type: Article |
Times cited : (8)
|
References (14)
|