-
1
-
-
0002463446
-
Multi-Item Inventory Models with Coordinated Replenishments: A Survey
-
Askoy, Y. and S. S. Erenguc, "Multi-Item Inventory Models with Coordinated Replenishments: A Survey," International J. Oper. and Production Management, 8, 1 (1988), 63-73.
-
(1988)
International J. Oper. and Production Management
, vol.8
, Issue.1
, pp. 63-73
-
-
Askoy, Y.1
Erenguc, S.S.2
-
2
-
-
0001233812
-
Improved Algorithms for Economic Lot Size Problems
-
Aggarwal, A. and J. K. Park, "Improved Algorithms for Economic Lot Size Problems," Oper. Res., 41, 3 (1993), 549-571.
-
(1993)
Oper. Res.
, vol.41
, Issue.3
, pp. 549-571
-
-
Aggarwal, A.1
Park, J.K.2
-
3
-
-
0024641438
-
Computational Complexity of Uncapacitated Multi-Echelon Production Planning Problems
-
Arkin, E., D. Joneja, and R. Roundy, "Computational Complexity of Uncapacitated Multi-Echelon Production Planning Problems," Oper. Res. Letters, 8 (1989), 61-66.
-
(1989)
Oper. Res. Letters
, vol.8
, pp. 61-66
-
-
Arkin, E.1
Joneja, D.2
Roundy, R.3
-
4
-
-
0023963179
-
Multiproduct Dynamic Lot-Sizing Model with Coordinated Replenishments
-
Erenguc, S. S., "Multiproduct Dynamic Lot-Sizing Model with Coordinated Replenishments," Naval Res. Logistics, 35 (1988), 1-22.
-
(1988)
Naval Res. Logistics
, vol.35
, pp. 1-22
-
-
Erenguc, S.S.1
-
5
-
-
0018031445
-
A Dual-Based Procedure for Uncapacitated Facility Location
-
Erlenkotter, D., "A Dual-Based Procedure for Uncapacitated Facility Location," Oper. Res., 26, 6 (1978), 992-1009.
-
(1978)
Oper. Res.
, vol.26
, Issue.6
, pp. 992-1009
-
-
Erlenkotter, D.1
-
6
-
-
0026208005
-
A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in O(n log n) or O(n) Time
-
Federgruen, A. and M. Tzur, "A Simple Forward Algorithm To Solve General Dynamic Lot Sizing Models with n Periods in O(n log n) or O(n) Time," Management Sci., 37, 8 (1991), 909-925.
-
(1991)
Management Sci.
, vol.37
, Issue.8
, pp. 909-925
-
-
Federgruen, A.1
Tzur, M.2
-
7
-
-
84989685335
-
A Dual-Based Optimization Procedure for the Two-Echelon Uncapacitated Facility Location Problem
-
Gao, L. and E. P. Robinson, "A Dual-Based Optimization Procedure for the Two-Echelon Uncapacitated Facility Location Problem," Naval Res. Logistics, 39 (1992), 191-212.
-
(1992)
Naval Res. Logistics
, vol.39
, pp. 191-212
-
-
Gao, L.1
Robinson, E.P.2
-
8
-
-
0018442680
-
A Multi-Product Dynamic Lot-Size Model with Individual and Joint Setup Costs
-
Kao, E. P. C., "A Multi-Product Dynamic Lot-Size Model with Individual and Joint Setup Costs," Oper. Res., 27, 2 (1979), 279-289.
-
(1979)
Oper. Res.
, vol.27
, Issue.2
, pp. 279-289
-
-
Kao, E.P.C.1
-
9
-
-
0000245407
-
A Dual-Based Algorithm for Multiproduct Uncapacitated Facility Location
-
Klincewicz, J. G., and H. Luss, "A Dual-Based Algorithm for Multiproduct Uncapacitated Facility Location," Transportation Sci., 21 (1987), 198-206.
-
(1987)
Transportation Sci.
, vol.21
, pp. 198-206
-
-
Klincewicz, J.G.1
Luss, H.2
-
10
-
-
0018443805
-
Coordinated Replenishments of Items under Time-Varying Demand: Dynamic Programming Formulation
-
Silver, E. A., "Coordinated Replenishments of Items Under Time-Varying Demand: Dynamic Programming Formulation," Naval Res. Logistics Quarterly, 26, 1 (1979), 141-151.
-
(1979)
Naval Res. Logistics Quarterly
, vol.26
, Issue.1
, pp. 141-151
-
-
Silver, E.A.1
-
11
-
-
3142582965
-
More on Joint Order Release Decisions under Dependent Demand
-
_ and P. Kelle, "More on Joint Order Release Decisions Under Dependent Demand," Production and Inventory Management J., Second Quarter (1988), 71-72.
-
(1988)
Production and Inventory Management J.
, vol.SECOND QUARTER
, pp. 71-72
-
-
Kelle, P.1
-
12
-
-
0001653909
-
Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems
-
Veinott, A. F., Jr., "Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems," Oper. Res., 17 (1969), 262-291.
-
(1969)
Oper. Res.
, vol.17
, pp. 262-291
-
-
Veinott Jr., A.F.1
-
13
-
-
0001962762
-
Dynamic Version of the Economic Lot Size Model
-
Wagner, H. M. and T. M. Whitin, "Dynamic Version of the Economic Lot Size Model," Management Sci., 5, 1 (1958), 89-96.
-
(1958)
Management Sci.
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
14
-
-
0000495984
-
Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
-
Wagelmans, A., S. van Hoesel, and A. Kolen, "Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case," Oper. Res., 40, S1 (1992), S145-S156.
-
(1992)
Oper. Res.
, vol.40
, Issue.S1
-
-
Wagelmans, A.1
Van Hoesel, S.2
Kolen, A.3
-
15
-
-
0002967761
-
A Deterministic Multi-Period Production Scheduling Model with Backlogging
-
Zangwill, W. I., "A Deterministic Multi-Period Production Scheduling Model with Backlogging," Management Sci., 13, 1 (1966), 105-119.
-
(1966)
Management Sci.
, vol.13
, Issue.1
, pp. 105-119
-
-
Zangwill, W.I.1
-
16
-
-
0010895132
-
A Deterministic Multiproduct, Multifacility Production and Inventory Model
-
_, "A Deterministic Multiproduct, Multifacility Production and Inventory Model," Oper. Res., 14 (1966a), 486-507.
-
(1966)
Oper. Res.
, vol.14
, pp. 486-507
-
-
-
17
-
-
0000631024
-
A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System - A Network Approach
-
_, "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System - A Network Approach," Management Sci., 15, 9 (1969), 506-527.
-
(1969)
Management Sci.
, vol.15
, Issue.9
, pp. 506-527
-
-
|