-
1
-
-
0025944047
-
Synchronizing production and transportation schedules
-
Blumenfeld D. E., Burns L. D. and Daganzo C. F. (1991) Synchronizing production and transportation schedules. Transpn Res. 25B, 23-27.
-
(1991)
Transpn Res.
, vol.25 B
, pp. 23-27
-
-
Blumenfeld, D.E.1
Burns, L.D.2
Daganzo, C.F.3
-
2
-
-
0022267380
-
Analyzing trade-offs between transportation, inventory and production costs on freight networks
-
Blumenfeld D. E., Burns, L. D., Diltz J. D. and Daganzo C. F. (1985) Analyzing trade-offs between transportation, inventory and production costs on freight networks. Transpn Res. 19B, 361-380.
-
(1985)
Transpn Res.
, vol.19 B
, pp. 361-380
-
-
Blumenfeld, D.E.1
Burns, L.D.2
Diltz, J.D.3
Daganzo, C.F.4
-
3
-
-
0022059696
-
Distribution strategies that minimize transportation and inventory costs
-
Burns L. D., Hall R. W., Blumenfeld D. E. and Daganzo C. F. (1985) Distribution strategies that minimize transportation and inventory costs. Operat. Res. 33, 469-490.
-
(1985)
Operat. Res.
, vol.33
, pp. 469-490
-
-
Burns, L.D.1
Hall, R.W.2
Blumenfeld, D.E.3
Daganzo, C.F.4
-
4
-
-
0001887652
-
Dynamic lot size models with multi-stage assembly systems
-
Crowston W. and Wagner M. (1974) Dynamic lot size models with multi-stage assembly systems. Manage. Sci. 19, 14-21.
-
(1974)
Manage. Sci.
, vol.19
, pp. 14-21
-
-
Crowston, W.1
Wagner, M.2
-
5
-
-
0022178054
-
Supplying a single location from heterogeneous sources
-
Daganzo C. F. (1985) Supplying a single location from heterogeneous sources. Transpn Res. 19B, 409-420.
-
(1985)
Transpn Res.
, vol.19 B
, pp. 409-420
-
-
Daganzo, C.F.1
-
8
-
-
38249010317
-
The economic lot and delivery scheduling problem: The single item case
-
Hahm J. and Yano C. A. (1992) The economic lot and delivery scheduling problem: the single item case. Int. J. Prod. Econ. 28, 235-252.
-
(1992)
Int. J. Prod. Econ.
, vol.28
, pp. 235-252
-
-
Hahm, J.1
Yano, C.A.2
-
9
-
-
0022267382
-
Determining vehicle dispatch frequency when shipping frequency differs among suppliers
-
Hall R. W. (1985) Determining vehicle dispatch frequency when shipping frequency differs among suppliers. Transpn Res. 19B, 421-431.
-
(1985)
Transpn Res.
, vol.19 B
, pp. 421-431
-
-
Hall, R.W.1
-
10
-
-
0000227864
-
A 98% effective multi-stage production/inventory system
-
Roundy R. (1986) A 98% effective multi-stage production/inventory system. Math. Operat. Res. 11, 699-727.
-
(1986)
Math. Operat. Res.
, vol.11
, pp. 699-727
-
-
Roundy, R.1
-
11
-
-
0019589727
-
Operations research in inventory management: A review and critique
-
Silver E. A. (1981) Operations research in inventory management: a review and critique. Operat. Res. 29, 628-645.
-
(1981)
Operat. Res.
, vol.29
, pp. 628-645
-
-
Silver, E.A.1
-
13
-
-
0037859397
-
Research portfolio for inventory management and production planning systems
-
Wagner H. M. (1980) Research portfolio for inventory management and production planning systems. Operat. Res. 28, 445-475.
-
(1980)
Operat. Res.
, vol.28
, pp. 445-475
-
-
Wagner, H.M.1
-
14
-
-
0019539238
-
Heuristic techniques for simultaneous scheduling of production and distribution in multi-echelon structures: Theory and empirical comparisons
-
Williams J. (1981) Heuristic techniques for simultaneous scheduling of production and distribution in multi-echelon structures: theory and empirical comparisons. Manage. Sci. 27, 336-352.
-
(1981)
Manage. Sci.
, vol.27
, pp. 336-352
-
-
Williams, J.1
|