메뉴 건너뛰기




Volumn 27, Issue 1-2, 1996, Pages 11-20

Object-oriented fabrication cost model for the economic appraisal of tubular truss design

Author keywords

Cost modelling; Design; Economic appraisal; Integration; Object oriented; Steel structures

Indexed keywords

COSTS; ESTIMATION; EXPERT SYSTEMS; FABRICATION; INTEGRATION; MATHEMATICAL MODELS; OBJECT ORIENTED PROGRAMMING; STEEL STRUCTURES; STRUCTURAL DESIGN; TRUSSES;

EID: 0030269809     PISSN: 09659978     EISSN: None     Source Type: Journal    
DOI: 10.1016/0965-9978(96)00016-6     Document Type: Article
Times cited : (7)

References (10)
  • 1
    • 30244455814 scopus 로고
    • Economic design and shorter lead times
    • Steel Construction Institute, Economic design and shorter lead times. Steel Construction Today, 1992, 6(5), 228.
    • (1992) Steel Construction Today , vol.6 , Issue.5 , pp. 228
  • 4
    • 30244539088 scopus 로고
    • Construction-led design of tubular trusses using a cost model: Knowledge acquisition and representation
    • Melbourne, Australia, December
    • Tizani, W. M. K., Davies, G., Nethercot, D. A. & Smith, N. J., Construction-led design of tubular trusses using a cost model: knowledge acquisition and representation. In Proc. 6th Int. Symp. Tubular Structures. Melbourne, Australia, December 1994, pp. 411-416.
    • (1994) Proc. 6th Int. Symp. Tubular Structures , pp. 411-416
    • Tizani, W.M.K.1    Davies, G.2    Nethercot, D.A.3    Smith, N.J.4
  • 5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.