메뉴 건너뛰기




Volumn 23, Issue 10, 1996, Pages 945-956

Scheduling two parallel semiautomatic machines to minimize machine interference

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; EFFICIENCY; INTERFERENCE SUPPRESSION; OPERATIONS RESEARCH; OPTIMIZATION; PERFORMANCE; ROBOTS;

EID: 0030269665     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/0305-0548(96)00011-1     Document Type: Article
Times cited : (48)

References (8)
  • 1
    • 0021934896 scopus 로고
    • Review of operator/machine interference models
    • K. Stecke and J. Aronson, Review of operator/machine interference models. Int. J. Prod. Res. 23, 129-151 (1985).
    • (1985) Int. J. Prod. Res. , vol.23 , pp. 129-151
    • Stecke, K.1    Aronson, J.2
  • 2
    • 0015283718 scopus 로고
    • Single-server, two-machine sequencing with switching time
    • V. K. Sahney, Single-server, two-machine sequencing with switching time. Opns Res. 20, 24-26 (1972).
    • (1972) Opns Res. , vol.20 , pp. 24-26
    • Sahney, V.K.1
  • 3
    • 0024082389 scopus 로고
    • Look-ahead scheduling for minimizing machine interference
    • C. P. Koulamas and M. L. Smith, Look-ahead scheduling for minimizing machine interference. Int. J. Prod. Res. 26, 1523-1533 (1988).
    • (1988) Int. J. Prod. Res. , vol.26 , pp. 1523-1533
    • Koulamas, C.P.1    Smith, M.L.2
  • 4
    • 0025413493 scopus 로고
    • Some heuristics for scheduling jobs on parallel machines with setups
    • C. K. So, Some heuristics for scheduling jobs on parallel machines with setups. Mgmt Sci. 36, 467-475 (1990).
    • (1990) Mgmt Sci. , vol.36 , pp. 467-475
    • So, C.K.1
  • 5
    • 0024701172 scopus 로고
    • Simultaneous resource scheduling to minimize weighted flow times
    • G. Dobson and U. S. Karmarkar, Simultaneous resource scheduling to minimize weighted flow times. Opns Res. 37, 592-600 (1989).
    • (1989) Opns Res. , vol.37 , pp. 592-600
    • Dobson, G.1    Karmarkar, U.S.2
  • 6
    • 0027306874 scopus 로고
    • Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck and resource pricing heuristics
    • S. R. Lawrence and T. E. Morton, Resource-constrained multi-project scheduling with tardy costs: comparing myopic, bottleneck and resource pricing heuristics. Eur. J. Opl Res. 64, 168-187 (1993).
    • (1993) Eur. J. Opl Res. , vol.64 , pp. 168-187
    • Lawrence, S.R.1    Morton, T.E.2
  • 8
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • P. S. Ow and T. E. Morton, The single machine early/tardy problem. Mgmt Sci. 35, 177-191 (1989).
    • (1989) Mgmt Sci. , vol.35 , pp. 177-191
    • Ow, P.S.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.