메뉴 건너뛰기




Volumn 36, Issue 10, 1996, Pages 1537-1546

Optimal redundancies for reliability and availability of series systems

Author keywords

[No Author keywords available]

Indexed keywords

AVAILABILITY; COST EFFECTIVENESS; OPTIMIZATION; POWER PLANTS; REDUNDANCY; REPAIR; STATISTICAL METHODS; SYSTEMS ANALYSIS;

EID: 0030269135     PISSN: 00262714     EISSN: None     Source Type: Journal    
DOI: 10.1016/0026-2714(95)00209-X     Document Type: Article
Times cited : (31)

References (25)
  • 2
    • 0042856082 scopus 로고
    • A queueing model for spare coal faces
    • F. J. Toft and H. Boothroyd, A queueing model for spare coal faces. Opl Res. Q. 10, 245-251 (1959).
    • (1959) Opl Res. Q. , vol.10 , pp. 245-251
    • Toft, F.J.1    Boothroyd, H.2
  • 3
    • 0024878188 scopus 로고
    • Economic analysis of the M/M/R machine repair problem with warm standby spares
    • B. D. Sivazlian and K.-H. Wang, Economic analysis of the M/M/R machine repair problem with warm standby spares. Microelectron. Reliab. 29, 25-35 (1989).
    • (1989) Microelectron. Reliab. , vol.29 , pp. 25-35
    • Sivazlian, B.D.1    Wang, K.-H.2
  • 4
    • 0037565734 scopus 로고
    • The productivity of several machines under the care of one operator
    • H. Ashcroft, The productivity of several machines under the care of one operator. J. R. Statist. Soc. 12, 145-151 (1950).
    • (1950) J. R. Statist. Soc. , vol.12 , pp. 145-151
    • Ashcroft, H.1
  • 6
    • 0019613266 scopus 로고
    • An optimum repair policy for the machine interference problem
    • E. A. Elsayed, An optimum repair policy for the machine interference problem. J. Opl Res. Soc. 32, 793-801 (1981).
    • (1981) J. Opl Res. Soc. , vol.32 , pp. 793-801
    • Elsayed, E.A.1
  • 9
    • 0018997584 scopus 로고
    • Optimal maintenance repair policies for the machine repair problem
    • S. C. Albright, Optimal maintenance repair policies for the machine repair problem. Nav. Res. Logist. Q. 21, 17-27 (1980).
    • (1980) Nav. Res. Logist. Q. , vol.21 , pp. 17-27
    • Albright, S.C.1
  • 10
    • 0016927922 scopus 로고
    • An approach to cost analysis of maintenance float systems
    • J. E. Hilliard, An approach to cost analysis of maintenance float systems. IIE Trans. 8, 128-133 (1976).
    • (1976) IIE Trans. , vol.8 , pp. 128-133
    • Hilliard, J.E.1
  • 11
    • 0017675654 scopus 로고
    • Queueing models for spares provisioning
    • D. Gross, H. D. Kahn and J. D. Marsh, Queueing models for spares provisioning. Nav. Logist. Q. 24, 512-536 (1977).
    • (1977) Nav. Logist. Q. , vol.24 , pp. 512-536
    • Gross, D.1    Kahn, H.D.2    Marsh, J.D.3
  • 12
    • 0020887683 scopus 로고
    • A closed queueing network model for multi-echelon repairable item provisioning
    • D. Gross, D. R. Miller and R. M. Soland, A closed queueing network model for multi-echelon repairable item provisioning. IIE Trans. 15, 344-352 (1983).
    • (1983) IIE Trans. , vol.15 , pp. 344-352
    • Gross, D.1    Miller, D.R.2    Soland, R.M.3
  • 13
    • 0024898275 scopus 로고
    • System characteristics and economic analysis of the G/G/R machine repair problem with warm standby using diffusion approximation
    • B. D. Sivazlian and K.-H. Wang, System characteristics and economic analysis of the G/G/R machine repair problem with warm standby using diffusion approximation. Microelectron. Reliab. 29, 829-848 (1989).
    • (1989) Microelectron. Reliab. , vol.29 , pp. 829-848
    • Sivazlian, B.D.1    Wang, K.-H.2
  • 14
    • 0008906045 scopus 로고
    • An application of the birth and death process to the provision of spare machines
    • J. Taylor and R. R. P. Jackson, An application of the birth and death process to the provision of spare machines. Opl Res. Q. 5, 95-108 (1954).
    • (1954) Opl Res. Q. , vol.5 , pp. 95-108
    • Taylor, J.1    Jackson, R.R.P.2
  • 15
    • 0029323553 scopus 로고
    • Probabilistic analysis of a three-unit cold standby redundant system with repair
    • R. Subramanian and V. Anantharaman, Probabilistic analysis of a three-unit cold standby redundant system with repair. Microelectron. Reliab. 35, 1001-1008 (1995).
    • (1995) Microelectron. Reliab. , vol.35 , pp. 1001-1008
    • Subramanian, R.1    Anantharaman, V.2
  • 16
    • 0027680731 scopus 로고
    • On comparison of MTBF between four redundant systems
    • F. C. Meng, On comparison of MTBF between four redundant systems. Microelectron. Reliab. 33, 1987-1990 (1993).
    • (1993) Microelectron. Reliab. , vol.33 , pp. 1987-1990
    • Meng, F.C.1
  • 17
    • 0029342894 scopus 로고
    • Comparing the MTBF of four systems with standby components
    • F. C. Meng, Comparing the MTBF of four systems with standby components. Microelectron. Reliab. 35, 1031-1035 (1995).
    • (1995) Microelectron. Reliab. , vol.35 , pp. 1031-1035
    • Meng, F.C.1
  • 18
    • 0029290190 scopus 로고
    • Profit analysis of two-unit standby system with rest period for the operator and correlated failures and repairs
    • V. K. Tyagi, Profit analysis of two-unit standby system with rest period for the operator and correlated failures and repairs. Microelectron. Reliab. 35, 753-757 (1995).
    • (1995) Microelectron. Reliab. , vol.35 , pp. 753-757
    • Tyagi, V.K.1
  • 19
    • 0029207390 scopus 로고
    • Cost analysis, availability and MTTF of a three state standby complex system under common cause and human failures
    • D. Pandey and M. Jacob, Cost analysis, availability and MTTF of a three state standby complex system under common cause and human failures. Microelectron. Reliab. 35, 91-95 (1995).
    • (1995) Microelectron. Reliab. , vol.35 , pp. 91-95
    • Pandey, D.1    Jacob, M.2
  • 20
    • 0028518771 scopus 로고
    • Profit analysis of the machine repair problem with cold standbys and two modes of failure
    • K.-H. Wang, Profit analysis of the machine repair problem with cold standbys and two modes of failure. Microelectron. Reliab. 34, 1635-1642 (1994).
    • (1994) Microelectron. Reliab. , vol.34 , pp. 1635-1642
    • Wang, K.-H.1
  • 21
    • 0025475731 scopus 로고
    • Profit function analysis of system with mixture of warm and cold standby
    • R. Gupta, S. Bansal and L. R. Goel, Profit function analysis of system with mixture of warm and cold standby. Int. J. Syst. Sci. 21, 1577-1587 (1990).
    • (1990) Int. J. Syst. Sci. , vol.21 , pp. 1577-1587
    • Gupta, R.1    Bansal, S.2    Goel, L.R.3
  • 22
    • 0026909836 scopus 로고
    • Cost analysis of the M/M/R machine repair problem with spares operating under variable service rates. Microelectron
    • K.-H. Wang and B. D. Sivazlian, Cost analysis of the M/M/R machine repair problem with spares operating under variable service rates. Microelectron. Reliab. 32, 1171-1183 (1992).
    • (1992) Reliab. , vol.32 , pp. 1171-1183
    • Wang, K.-H.1    Sivazlian, B.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.