Volumn 94, Issue 2, 1996, Pages 231-241

Scheduling multiprocessor tasks with chain constraints

Author keywords

Multiprocessor task; Parallel computation; Precedence constraint; Scheduling

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; CONSTRAINT THEORY; MATHEMATICAL MODELS; MULTIPROCESSING SYSTEMS; OPTIMIZATION; POLYNOMIALS; PROGRAM PROCESSORS; SCHEDULING;

EID: 0030259021     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/0377-2217(96)00126-9     Document Type: Article
Times cited : (23)

References (21)
  • 2
    • 0021450897 scopus 로고
    • Scheduling independent 2-processor tasks to minimize schedule length
    • Błażewicz, J., Drabowski, M., and Wȩglarz, J., "Scheduling independent 2-processor tasks to minimize schedule length", Information Processing Letters 18 (1984) 267-273.
    • (1984) Information Processing Letters , vol.18 , pp. 267-273
    • Błazewicz, J.1    Drabowski, M.2    Wȩglarz, J.3
  • 5
    • 0028195959 scopus 로고
    • Scheduling independent multiprocessor tasks on a uniform k-processor system
    • Błażewicz, J., Drozdowski, M., Schmidt, G., and de Werra, D., "Scheduling independent multiprocessor tasks on a uniform k-processor system", Parallel Computing 20 (1994) 15-28.
    • (1994) Parallel Computing , vol.20 , pp. 15-28
    • Błazewicz, J.1    Drozdowski, M.2    Schmidt, G.3    De Werra, D.4
  • 9
    • 0015482117 scopus 로고
    • Optimal scheduling for two-processor systems
    • Coffman, Jr., E.G., and Graham, R.L., "Optimal scheduling for two-processor systems", Acta Informatica 1 (1972) 200-213.
    • (1972) Acta Informatica , vol.1 , pp. 200-213
    • Coffman E.G., Jr.1    Graham, R.L.2
  • 14
    • 0001430010 scopus 로고
    • Parallel sequencing and assembly line problems
    • Hu, T.C., "Parallel sequencing and assembly line problems", Operations Research 9 (1961) 841-848.
    • (1961) Operations Research , vol.9 , pp. 841-848
    • Hu, T.C.1
  • 15
    • 0004251967 scopus 로고
    • Mathematical Centre Tracts 69, Mathematisch Centrum, Amsterdam
    • Lenstra, J.K., "Sequencing by enumerative methods", Mathematical Centre Tracts 69, Mathematisch Centrum, Amsterdam, 1976.
    • (1976) Sequencing by Enumerative Methods
    • Lenstra, J.K.1
  • 16
    • 0000507163 scopus 로고
    • Preemptive scheduling with variable profile, precedence constraints and due dates
    • Liu, Z., and Sanlaville, E., "Preemptive scheduling with variable profile, precedence constraints and due dates", Discrete Applied Mathematics 58 (1995) 253-280.
    • (1995) Discrete Applied Mathematics , vol.58 , pp. 253-280
    • Liu, Z.1    Sanlaville, E.2
  • 17
    • 0000986929 scopus 로고
    • Concurrent task systems
    • Lloyd, E.L., "Concurrent task systems", Operations Research 29 (1981) 189-201.
    • (1981) Operations Research , vol.29 , pp. 189-201
    • Lloyd, E.L.1
  • 18
    • 0002643827 scopus 로고
    • Scheduling with deadlines and loss functions
    • McNaughton, R., "Scheduling with deadlines and loss functions", Management Science 12 (1959) 1-12.
    • (1959) Management Science , vol.12 , pp. 1-12
    • McNaughton, R.1
  • 21
    • 0025673181 scopus 로고
    • Multiprocessor scheduling with communication delays
    • Veltman, B., Lageweg, B.J., and Lenstra, J.K., "Multiprocessor scheduling with communication delays", Parallel Computing 16 (1990) 173-182.
    • (1990) Parallel Computing , vol.16 , pp. 173-182
    • Veltman, B.1    Lageweg, B.J.2    Lenstra, J.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.