-
1
-
-
0003415652
-
-
Addison-Wesley, Reading, MA
-
Aho, A.V., Hopcroft, J.E., and Ulmann, J.D., The Design and Analysis of Computer Algorithms, Addison-Wesley, Reading, MA, 1974.
-
(1974)
The Design and Analysis of Computer Algorithms
-
-
Aho, A.V.1
Hopcroft, J.E.2
Ulmann, J.D.3
-
2
-
-
0021450897
-
Scheduling independent 2-processor tasks to minimize schedule length
-
Błażewicz, J., Drabowski, M., and Wȩglarz, J., "Scheduling independent 2-processor tasks to minimize schedule length", Information Processing Letters 18 (1984) 267-273.
-
(1984)
Information Processing Letters
, vol.18
, pp. 267-273
-
-
Błazewicz, J.1
Drabowski, M.2
Wȩglarz, J.3
-
3
-
-
0022717856
-
Scheduling multiprocessor tasks to minimize schedule length
-
Błażewicz, J., Drabowski, M., and Wȩglarz, J., "Scheduling multiprocessor tasks to minimize schedule length", IEEE Transactions on Computers 35 (1986) 389-393.
-
(1986)
IEEE Transactions on Computers
, vol.35
, pp. 389-393
-
-
Błazewicz, J.1
Drabowski, M.2
Wȩglarz, J.3
-
4
-
-
0043159033
-
Scheduling independent two processor tasks on a uniform duo-processor system
-
Błażewicz, J., Drozdowski, M., Schmidt, G., and de Werra, D., "Scheduling independent two processor tasks on a uniform duo-processor system", Discrete Applied Mathematics 28 (1990) 11-20.
-
(1990)
Discrete Applied Mathematics
, vol.28
, pp. 11-20
-
-
Błazewicz, J.1
Drozdowski, M.2
Schmidt, G.3
De Werra, D.4
-
5
-
-
0028195959
-
Scheduling independent multiprocessor tasks on a uniform k-processor system
-
Błażewicz, J., Drozdowski, M., Schmidt, G., and de Werra, D., "Scheduling independent multiprocessor tasks on a uniform k-processor system", Parallel Computing 20 (1994) 15-28.
-
(1994)
Parallel Computing
, vol.20
, pp. 15-28
-
-
Błazewicz, J.1
Drozdowski, M.2
Schmidt, G.3
De Werra, D.4
-
6
-
-
0004048738
-
-
Springer-Verlag, Berlin
-
Błażewicz, J., Ecker, K., Schmidt, G., and Wȩglarz, J., Scheduling in Computer and Manufacturing Systems, Springer-Verlag, Berlin, 1993.
-
(1993)
Scheduling in Computer and Manufacturing Systems
-
-
Błazewicz, J.1
Ecker, K.2
Schmidt, G.3
Wȩglarz, J.4
-
7
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
Błażewicz, J., Lenstra, J.K., and Rinnooy Kan, A.H.G., "Scheduling subject to resource constraints: Classification and complexity", Discrete Applied Mathematics 5 (1983) 11-24.
-
(1983)
Discrete Applied Mathematics
, vol.5
, pp. 11-24
-
-
Błazewicz, J.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
9
-
-
0015482117
-
Optimal scheduling for two-processor systems
-
Coffman, Jr., E.G., and Graham, R.L., "Optimal scheduling for two-processor systems", Acta Informatica 1 (1972) 200-213.
-
(1972)
Acta Informatica
, vol.1
, pp. 200-213
-
-
Coffman E.G., Jr.1
Graham, R.L.2
-
12
-
-
0003603813
-
-
Freeman, San Francisco, CA
-
Garey, M.R., and Johnson, D.S., Computers and Intractability: A Guide to the Theory of NP-completeness, Freeman, San Francisco, CA, 1979.
-
(1979)
Computers and Intractability: A Guide to the Theory of NP-completeness
-
-
Garey, M.R.1
Johnson, D.S.2
-
13
-
-
74849101820
-
Optimization and Approximation in deterministic sequencing and scheduling theory: A survey
-
Graham, R.L., Lalwer, E.L., Lenstra, J.K., and Rinnooy Kan, A.H.G., "Optimization and Approximation in deterministic sequencing and scheduling theory: A survey", Annals of Discrete Mathematics (1979) 287-326.
-
(1979)
Annals of Discrete Mathematics
, pp. 287-326
-
-
Graham, R.L.1
Lalwer, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
14
-
-
0001430010
-
Parallel sequencing and assembly line problems
-
Hu, T.C., "Parallel sequencing and assembly line problems", Operations Research 9 (1961) 841-848.
-
(1961)
Operations Research
, vol.9
, pp. 841-848
-
-
Hu, T.C.1
-
15
-
-
0004251967
-
-
Mathematical Centre Tracts 69, Mathematisch Centrum, Amsterdam
-
Lenstra, J.K., "Sequencing by enumerative methods", Mathematical Centre Tracts 69, Mathematisch Centrum, Amsterdam, 1976.
-
(1976)
Sequencing by Enumerative Methods
-
-
Lenstra, J.K.1
-
16
-
-
0000507163
-
Preemptive scheduling with variable profile, precedence constraints and due dates
-
Liu, Z., and Sanlaville, E., "Preemptive scheduling with variable profile, precedence constraints and due dates", Discrete Applied Mathematics 58 (1995) 253-280.
-
(1995)
Discrete Applied Mathematics
, vol.58
, pp. 253-280
-
-
Liu, Z.1
Sanlaville, E.2
-
17
-
-
0000986929
-
Concurrent task systems
-
Lloyd, E.L., "Concurrent task systems", Operations Research 29 (1981) 189-201.
-
(1981)
Operations Research
, vol.29
, pp. 189-201
-
-
Lloyd, E.L.1
-
18
-
-
0002643827
-
Scheduling with deadlines and loss functions
-
McNaughton, R., "Scheduling with deadlines and loss functions", Management Science 12 (1959) 1-12.
-
(1959)
Management Science
, vol.12
, pp. 1-12
-
-
McNaughton, R.1
-
21
-
-
0025673181
-
Multiprocessor scheduling with communication delays
-
Veltman, B., Lageweg, B.J., and Lenstra, J.K., "Multiprocessor scheduling with communication delays", Parallel Computing 16 (1990) 173-182.
-
(1990)
Parallel Computing
, vol.16
, pp. 173-182
-
-
Veltman, B.1
Lageweg, B.J.2
Lenstra, J.K.3
|