|
Volumn 1276, Issue , 1996, Pages 3-22
|
Modeling the measured time to corrosion cracking
|
Author keywords
Chloride; Concrete cracking; Corrosion; Corrosion measurement; Corrosion rate
|
Indexed keywords
CALCULATIONS;
CHLORINE;
CONCRETE CONSTRUCTION;
CRACK INITIATION;
DETERIORATION;
MATHEMATICAL MODELS;
POLARIZATION;
REINFORCED CONCRETE;
STEEL;
STRENGTH OF MATERIALS;
TEMPERATURE;
CORROSION CRACKING;
CORROSION RATE MEASUREMENT;
METAL LOSS MEASUREMENT;
CORROSION;
|
EID: 0030258467
PISSN: 00660558
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1520/stp16964s Document Type: Article |
Times cited : (11)
|
References (8)
|