Volumn 16, Issue 9, 1996, Pages 5-
|
WSCC unfolds causes of the july 2 disturbance
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ELECTRIC LINES;
ELECTRIC LOAD SHEDDING;
ELECTRIC POWER GENERATION;
ELECTRIC POWER SYSTEM INTERCONNECTION;
ELECTRIC POWER SYSTEM PROTECTION;
ELECTRIC RELAYS;
ELECTRIC SUBSTATIONS;
OUTAGES;
PLANNING;
RELIABILITY;
CUSTOMER INTERRUPTIONS;
ELECTRIC SERVICE INTERRUPTION;
ELECTRIC SYSTEM RELIABILITY;
POWER RESTORATION;
UNDERFREQUENCY CONDITIONS;
ELECTRIC POWER SYSTEMS;
|
EID: 0030241127
PISSN: 02721724
EISSN: None
Source Type: Journal
DOI: 10.1109/mper.1996.535475 Document Type: Article |
Times cited : (3)
|
References (0)
|