메뉴 건너뛰기




Volumn 11, Issue 3, 1996, Pages 155-161

Nash reservoir management study with stochastic images - A case study

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; FLOW OF FLUIDS; OIL WELL PRODUCTION; PETROLEUM GEOLOGY;

EID: 0030235975     PISSN: 0885923X     EISSN: None     Source Type: Journal    
DOI: 10.2118/28417-pa     Document Type: Article
Times cited : (3)

References (6)
  • 1
    • 33747464073 scopus 로고
    • Misener Sandstone (Middle-Upper Devonian), North-Central Oklahoma
    • Dec.
    • Amsden, T.W. and Klapper, G.: "Misener Sandstone (Middle-Upper Devonian), North-Central Oklahoma," AAPG Bulletin 56 (Dec. 1972) 2323.
    • (1972) AAPG Bulletin 56 , pp. 2323
    • Amsden, T.W.1    Klapper, G.2
  • 3
    • 33747476901 scopus 로고
    • Intera Information Technologies Ltd., Oxfordshire, England
    • ECLIPSE 200 REFERENCE MANUAL, Intera Information Technologies Ltd., Oxfordshire, England (1993).
    • (1993) Eclipse 200 Reference Manual
  • 5
    • 0026449974 scopus 로고
    • GEOLITH: An Interactive Geostatistical Modeling Application
    • SPE 24432 presented Houston, 19-22 July
    • Araktingi, U.G., Hewett, T.A., and Tran, T.T.B.: "GEOLITH: An Interactive Geostatistical Modeling Application," SPE 24432 presented at the Seventh SPE Computer Conference, Houston, 19-22 July 1992.
    • (1992) Seventh SPE Computer Conference
    • Araktingi, U.G.1    Hewett, T.A.2    Tran, T.T.B.3
  • 6
    • 0027629470 scopus 로고
    • Reservoir Performance Forecasting: Acceleration by Parallel Planning
    • July
    • Saleri, N.G.. "Reservoir Performance Forecasting: Acceleration by Parallel Planning," JPT, July, 1993, p. 652.
    • (1993) JPT , pp. 652
    • Saleri, N.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.