메뉴 건너뛰기




Volumn 11, Issue 3, 1996, Pages 1191-1200

Load frequency control issues in power system operations after deregulation

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; DISTRIBUTED PARAMETER CONTROL SYSTEMS; ELECTRIC LOADS; ELECTRIC POWER DISTRIBUTION; ELECTRIC POWER SYSTEMS; ELECTRIC POWER TRANSMISSION; ELECTRIC UTILITIES; STANDARDS;

EID: 0030215541     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/59.535590     Document Type: Article
Times cited : (299)

References (5)
  • 2
    • 0005326238 scopus 로고
    • Coordination of Power System Operation in a Competitive Power Market Environment
    • 28 August-September 3, Paris, France
    • O. Ojerde, I. Glende, G. Nussen, L. Nesse, Coordination of Power System Operation in a Competitive Power Market Environment, CIGRE Paper 39-204, CIGRE, 28 August-September 3,1994, Paris, France.
    • (1994) CIGRE Paper 39-204, CIGRE
    • Ojerde, O.1    Glende, I.2    Nussen, G.3    Nesse, L.4
  • 3
    • 0012594124 scopus 로고
    • Changes and Challenges for the National Grid
    • July
    • D. Jeffries, Changes and Challenges for the National Grid, Modern Power Systems, July 1992, suppl. pp. 23, 25.
    • (1992) Modern Power Systems , vol.SUPPL , pp. 23
    • Jeffries, D.1
  • 5
    • 0026203761 scopus 로고
    • Modified Automatic Time Error Control and Inadvertent Interchange Reduction for the WSCC Interconnected Power Systems
    • August
    • R.P. Schulte, W.R. McReynolds and D.E. Badley, Modified Automatic Time Error Control and Inadvertent Interchange Reduction for the WSCC Interconnected Power Systems, IEEE Transactions on Power Apparatus andSystems, Vol. 6, No. 3, August 1991, pp. 904-913.
    • (1991) IEEE Transactions on Power Apparatus AndSystems , vol.6 , Issue.3 , pp. 904-913
    • Schulte, R.P.1    McReynolds, W.R.2    Badley, D.E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.