-
2
-
-
0024017013
-
OPAL: A multi-knowledge-based system for industrial job shop scheduling
-
Bensana, E., Bel, G., and Dubois, D., "OPAL: A multi-knowledge-based system for industrial job shop scheduling", International Journal of Production Research 26 (1988) 795-819.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 795-819
-
-
Bensana, E.1
Bel, G.2
Dubois, D.3
-
3
-
-
0002069934
-
Fuzzy PERT
-
G. Evans, W. Karwowski and R. Wilhelm (eds.), Elsevier, Amsterdam
-
Buckely, J., "Fuzzy PERT", in: G. Evans, W. Karwowski and R. Wilhelm (eds.), Applications of Fuzzy Set Methodologies in Industrial Engineering, Elsevier, Amsterdam, 1989 103-114.
-
(1989)
Applications of Fuzzy Set Methodologies in Industrial Engineering
, pp. 103-114
-
-
Buckely, J.1
-
4
-
-
0014807274
-
A heuristic algorithm for the n-job m-machine sequencing problem
-
Campbell, H.G., Dudek, R.A., and Smith, M.L., "A heuristic algorithm for the n-job m-machine sequencing problem", Management Science 16 (1970) 630-697.
-
(1970)
Management Science
, vol.16
, pp. 630-697
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
5
-
-
0042976166
-
About membership function evaluation
-
Dishkant, H., "About membership function evaluation", Fuzzy Sets and Systems 5 (1981) 141-147.
-
(1981)
Fuzzy Sets and Systems
, vol.5
, pp. 141-147
-
-
Dishkant, H.1
-
6
-
-
0020142383
-
Membership functions, some mathematical programming models and production scheduling
-
Dumitru, V., and Luban, F., "Membership functions, some mathematical programming models and production scheduling", Fuzzy Sets and Systems 8 (1982) 19-33.
-
(1982)
Fuzzy Sets and Systems
, vol.8
, pp. 19-33
-
-
Dumitru, V.1
Luban, F.2
-
7
-
-
0028546121
-
One machine scheduling problem with fuzzy due dates
-
Han, S., Ishii, H., and Fujii, S., "One machine scheduling problem with fuzzy due dates", European Journal of Operational Research 79 (1994) 1-12.
-
(1994)
European Journal of Operational Research
, vol.79
, pp. 1-12
-
-
Han, S.1
Ishii, H.2
Fujii, S.3
-
8
-
-
0042976172
-
Ready time scheduling with stochastic service times
-
Industrial Engineering Department, N.C. State University, Raleigh, NC
-
Hodgson, T.J., King, R.E., and Stanfield, P.M., "Ready time scheduling with stochastic service times", NCSU-IE Technical Report 92-5, Industrial Engineering Department, N.C. State University, Raleigh, NC, 1992.
-
(1992)
NCSU-IE Technical Report 92-5
-
-
Hodgson, T.J.1
King, R.E.2
Stanfield, P.M.3
-
9
-
-
0000177367
-
Applications of the branch and bound technique to some flow shop scheduling problems
-
Ignall, E.J., and Schrage, L.E., "Applications of the branch and bound technique to some flow shop scheduling problems", Operations Research 13 (1965) 400-412.
-
(1965)
Operations Research
, vol.13
, pp. 400-412
-
-
Ignall, E.J.1
Schrage, L.E.2
-
10
-
-
0000996580
-
Two scheduling problems with fuzzy due dates
-
Ishii, H., Tada, M., and Masuda, T., "Two scheduling problems with fuzzy due dates", Fuzzy Sets and Systems 46 (1992) 339-347.
-
(1992)
Fuzzy Sets and Systems
, vol.46
, pp. 339-347
-
-
Ishii, H.1
Tada, M.2
Masuda, T.3
-
11
-
-
0003075019
-
Optimal two and three stage production schedules with setup times included
-
Johnson, S.M., "Optimal two and three stage production schedules with setup times included". Naval Research Logistics Quarterly 1 (1954) 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
12
-
-
0003733522
-
-
Lecture Notes in Economics and Mathematical Systems No. 394, Springer-Verlag, Berlin
-
Lai, Y.J., and Hwang, C.L., Fuzzy Mathematical Programming, Lecture Notes in Economics and Mathematical Systems No. 394, Springer-Verlag, Berlin, 1992.
-
(1992)
Fuzzy Mathematical Programming
-
-
Lai, Y.J.1
Hwang, C.L.2
-
17
-
-
0001497209
-
Using fuzzy set theory in a scheduling problem: A case study
-
Prade, H., "Using fuzzy set theory in a scheduling problem: A case study", Fuzzy Sets and Systems 2 (1979) 153-165.
-
(1979)
Fuzzy Sets and Systems
, vol.2
, pp. 153-165
-
-
Prade, H.1
-
18
-
-
0042976173
-
Formulation and solution of a fuzzy scheduling problem
-
Industrial Engineering Department, N.C. State University, Raleigh, NC
-
Stanfield, P.M., and Joines, J.A., "Formulation and solution of a fuzzy scheduling problem", NCSU-IE Technical Report 93-17, Industrial Engineering Department, N.C. State University, Raleigh, NC, 1993.
-
(1993)
NCSU-IE Technical Report 93-17
-
-
Stanfield, P.M.1
Joines, J.A.2
-
19
-
-
0027189296
-
An effective method for large scale project planning with multiple fuzzy activity times
-
Tsumjimura, Y., Chang, S., and Gen, M., "An effective method for large scale project planning with multiple fuzzy activity times", in: Proceedings Second IEEE Conference on Fuzzy Systems, 1993 1009-1015.
-
(1993)
Proceedings Second IEEE Conference on Fuzzy Systems
, pp. 1009-1015
-
-
Tsumjimura, Y.1
Chang, S.2
Gen, M.3
-
20
-
-
38249014234
-
Hierarchial scheduling based on approximate reasoning - A comparison with ISIS
-
Turksen, I.B., Ulguray, D., and Wang, Q., "Hierarchial scheduling based on approximate reasoning - A comparison with ISIS", Fuzzy Sets and Systems 46 (1992) 349-371.
-
(1992)
Fuzzy Sets and Systems
, vol.46
, pp. 349-371
-
-
Turksen, I.B.1
Ulguray, D.2
Wang, Q.3
-
21
-
-
84988201495
-
Constructing the membership function of a fuzzy set with objective and subjective information
-
Vallippan, S., and Pham, T.D., "Constructing the membership function of a fuzzy set with objective and subjective information", Microcomputers in Civil Engineering 8 (1993) 75-82.
-
(1993)
Microcomputers in Civil Engineering
, vol.8
, pp. 75-82
-
-
Vallippan, S.1
Pham, T.D.2
-
22
-
-
0043116632
-
A foundation for a theory of possibility
-
Yager, R.R., "A foundation for a theory of possibility", Journal of Cybernetics 10 (1980) 177-204.
-
(1980)
Journal of Cybernetics
, vol.10
, pp. 177-204
-
-
Yager, R.R.1
-
23
-
-
49349133217
-
Fuzzy sets as a basis for the theory of possibility
-
Zadeh, L., "Fuzzy sets as a basis for the theory of possibility", Fuzzy Sets and Systems 1 (1978) 3-28.
-
(1978)
Fuzzy Sets and Systems
, vol.1
, pp. 3-28
-
-
Zadeh, L.1
|