메뉴 건너뛰기




Volumn 43, Issue 5, 1996, Pages 629-654

The customer order lead-time problem on parallel machines

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC METHODS; JOB ANALYSIS; OPTIMIZATION; PRODUCTION CONTROL; SCHEDULING;

EID: 0030214445     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO;2-7     Document Type: Article
Times cited : (40)

References (15)
  • 2
    • 0002844386 scopus 로고
    • Scheduling the Production of Components at a Common Facility
    • Baker, K.R., "Scheduling the Production of Components at a Common Facility," IIE Transaciions, 20, 32-35 (1988).
    • (1988) IIE Transaciions , vol.20 , pp. 32-35
    • Baker, K.R.1
  • 3
    • 84989699714 scopus 로고
    • Scheduling of Parallel Processors: A Posterior Bound on LPT Sequencing and a Two-Step Algorithm
    • Blocher, J.D., and Chand, S., "Scheduling of Parallel Processors: A Posterior Bound on LPT Sequencing and a Two-Step Algorithm," Naval Research Logistics, 38, 273-287 (1991).
    • (1991) Naval Research Logistics , vol.38 , pp. 273-287
    • Blocher, J.D.1    Chand, S.2
  • 5
    • 0016080006 scopus 로고
    • Scheduling Independent Tasks to Reduce Mean Finishing Time
    • Bruno, J., Coffman, E.G., and Sethi, R., "Scheduling Independent Tasks to Reduce Mean Finishing Time," Communications of the ACM, 17, 382-387 (1974).
    • (1974) Communications of the ACM , vol.17 , pp. 382-387
    • Bruno, J.1    Coffman, E.G.2    Sethi, R.3
  • 6
    • 0024664606 scopus 로고
    • Optimal Scheduling of Products with Two Subassemblies on a Single Machine
    • Coffman, E.G., Nozari, A., and Yannakakis, M., "Optimal Scheduling of Products with Two Subassemblies on a Single Machine," Operations Research, 37, 426-436 (1989).
    • (1989) Operations Research , vol.37 , pp. 426-436
    • Coffman, E.G.1    Nozari, A.2    Yannakakis, M.3
  • 7
    • 0002554041 scopus 로고
    • Lagrangian Relaxation for Integer Programming
    • Geoffrion, A.M., "Lagrangian Relaxation for Integer Programming," Mathematical Programming Study, 2, 82-114 (1974).
    • (1974) Mathematical Programming Study , vol.2 , pp. 82-114
    • Geoffrion, A.M.1
  • 8
    • 0001596897 scopus 로고
    • Empirical Analysis of Heuristics
    • E.L. Lawler, J.K. Lenstra, A.H.G. Rinnoy Kan, and D.B. Shmoys, Eds., John Wiley & Sons, New York, Chap. 7
    • Golden, B.L., and Stewart. W.R., "Empirical Analysis of Heuristics," The Traveling Salesman Problem, E.L. Lawler, J.K. Lenstra, A.H.G. Rinnoy Kan, and D.B. Shmoys, Eds., John Wiley & Sons, New York, 1985, Chap. 7.
    • (1985) The Traveling Salesman Problem
    • Golden, B.L.1    Stewart, W.R.2
  • 13
    • 0025430088 scopus 로고
    • A Comparison of Dispatching Rules for Job Shops with Multiple Identical Jobs and Alternate Routings
    • Kirn, Y.-D., "A Comparison of Dispatching Rules for Job Shops with Multiple Identical Jobs and Alternate Routings," International Journal of Production Research, 28, 953-962 (1990).
    • (1990) International Journal of Production Research , vol.28 , pp. 953-962
    • Kirn, Y.-D.1
  • 15
    • 0027569358 scopus 로고
    • Batching and Scheduling Components at a Single Facility
    • Vickson, R.G., Santos, C.A., and Magazine, M.J., "Batching and Scheduling Components at a Single Facility," IIE Transactions, 25, 65-70 (1993).
    • (1993) IIE Transactions , vol.25 , pp. 65-70
    • Vickson, R.G.1    Santos, C.A.2    Magazine, M.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.