-
1
-
-
0001507294
-
Batching and scheduling jobs on batch and discrete processors
-
Ahmadi, J. H., Ahmadi, R. H., Dasu, S., and Tang, C. S., 1992, Batching and scheduling jobs on batch and discrete processors. Operations Research, 40, 750-763.
-
(1992)
Operations Research
, vol.40
, pp. 750-763
-
-
Ahmadi, J.H.1
Ahmadi, R.H.2
Dasu, S.3
Tang, C.S.4
-
2
-
-
40849105768
-
The complexity of one-machine batching problem
-
Albers, S, and Brucker, P., 1993, The complexity of one-machine batching problem. Discrete Applied Mathematics, 47, 87-107.
-
(1993)
Discrete Applied Mathematics
, vol.47
, pp. 87-107
-
-
Albers, S.1
Brucker, P.2
-
3
-
-
0023817925
-
Planning and scheduling for epitaxial wafer production facilities
-
Bjtran, G. R. and Tirupati, D., 1988, Planning and scheduling for epitaxial wafer production facilities. Operations Research, 36, 34-49.
-
(1988)
Operations Research
, vol.36
, pp. 34-49
-
-
Bjtran, G.R.1
Tirupati, D.2
-
4
-
-
0027656856
-
Minimizing total completion time on batch processing machines
-
Chandru, V., Lee, C. Y. and Uzsoy, R., 1993a, Minimizing total completion time on batch processing machines. International Journal of Production Research, 31, 2097-2121.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2097-2121
-
-
Chandru, V.1
Lee, C.Y.2
Uzsoy, R.3
-
5
-
-
0027560273
-
Minimizing total completion time on a batch processing machine with job families
-
Chandru, V., Lee, C. Y. and Uzsoy, R., 1993b, Minimizing total completion time on a batch processing machine with job families. Operations Research Letters, 13, 61-65.
-
(1993)
Operations Research Letters
, vol.13
, pp. 61-65
-
-
Chandru, V.1
Lee, C.Y.2
Uzsoy, R.3
-
6
-
-
0026866908
-
Real-time control of multiproduct bulk-service semiconductor manufacturing processes
-
Fowler, J. W., Phillips, D. T. and Hogg, G. L., 1992, Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Transaction on Semiconductor Manufacturing, 5, 158-163.
-
(1992)
IEEE Transaction on Semiconductor Manufacturing
, vol.5
, pp. 158-163
-
-
Fowler, J.W.1
Phillips, D.T.2
Hogg, G.L.3
-
7
-
-
0026153052
-
Dynamic batching heuristics for simultaneous processing
-
Glassey, C. R. and Weng, W. W., 1991, Dynamic batching heuristics for simultaneous processing. IEEE Transaction on Semiconductor Manufacturing, 4, 77-82
-
(1991)
IEEE Transaction on Semiconductor Manufacturing
, vol.4
, pp. 77-82
-
-
Glassey, C.R.1
Weng, W.W.2
-
8
-
-
0026944363
-
Control of batch processing systems in semiconductor wafer fabrication facilities
-
Gurnani, H., Anupindi, R. and Akella, R., 1992, Control of batch processing systems in semiconductor wafer fabrication facilities, IEEE Transaction on Semiconductor Manufacturing, 5, 319-328.
-
(1992)
IEEE Transaction on Semiconductor Manufacturing
, vol.5
, pp. 319-328
-
-
Gurnani, H.1
Anupindi, R.2
Akella, R.3
-
9
-
-
38149058172
-
Scheduling algorithms for a single batch processing machine
-
Ikura, Y, and Gimple, M., 1986, Scheduling algorithms for a single batch processing machine. Operations Research Letters, 5, 61-65.
-
(1986)
Operations Research Letters
, vol.5
, pp. 61-65
-
-
Ikura, Y.1
Gimple, M.2
-
10
-
-
0026898494
-
Efficient algorithms for scheduling semiconductor born-in operations
-
Lee, C. Y., Uzsoy, R. and Martin-Vega, L. A., 1992, Efficient algorithms for scheduling semiconductor born-in operations. Operations Research, 40, 764-775.
-
(1992)
Operations Research
, vol.40
, pp. 764-775
-
-
Lee, C.Y.1
Uzsoy, R.2
Martin-Vega, L.A.3
-
11
-
-
0003725604
-
-
Englewood Cliffs, NJ: Prentice-Hall)
-
Papadimitriou, C. H. and Steiglitz, K., 1982, Combinatorial Optimization, Algorithms and Complexity (Englewood Cliffs, NJ: Prentice-Hall)
-
(1982)
Combinatorial Optimization, Algorithms and Complexity
-
-
Papadimitriou, C.H.1
Steiglitz, K.2
-
12
-
-
0004225698
-
-
Englewood Cliffs, NJ: Prentice-Hall)
-
Reingold, E. M., Nievergelt J. and Deo, N., 1977, Combinatorial Algorithms, Theory and Practice (Englewood Cliffs, NJ: Prentice-Hall).
-
(1977)
Combinatorial Algorithms, Theory and Practice
-
-
Reingold, E.M.1
Nievergelt, J.2
Deo, N.3
-
13
-
-
0028461472
-
Scheduling a single batch processing machine with non-identical job sizes
-
Uzsoy, R., 1994, Scheduling a single batch processing machine with non-identical job sizes. International Journal of Production Research, 32, 1615-1635.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1615-1635
-
-
Uzsoy, R.1
|