메뉴 건너뛰기




Volumn 34, Issue 7, 1996, Pages 1859-1873

Evaluating capacity change and setup time reduction in a capacity-constrained, joint lot sizing situation

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; DECISION MAKING; INDUSTRIAL MANAGEMENT; INVENTORY CONTROL; MACHINERY; MATHEMATICAL MODELS; PRODUCTION;

EID: 0030193404     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608905001     Document Type: Article
Times cited : (4)

References (19)
  • 3
    • 0015669867 scopus 로고
    • An iterative procedure for the single-machine multi-product lot scheduling problem
    • Doll, C. and Whybark, C., 1973, An iterative procedure for the single-machine multi-product lot scheduling problem. Management Science, 20, 50-55.
    • (1973) Management Science , vol.20 , pp. 50-55
    • Doll, C.1    Whybark, C.2
  • 4
    • 0023576978 scopus 로고
    • The effects of setup time on output capacity in cellular manufacturing
    • Flynn, B., 1987, The effects of setup time on output capacity in cellular manufacturing. International Journal of Production Research, 25, 1761-1772.
    • (1987) International Journal of Production Research , vol.25 , pp. 1761-1772
    • Flynn, B.1
  • 5
    • 38249018808 scopus 로고
    • Guidelines for setup-cost reduction programs to achieve zero inventory
    • Freeland, J. R., Leschke, J. P. and Weiss, E. N., 1990, Guidelines for setup-cost reduction programs to achieve zero inventory. Journal of Operations Management, 9, 85-100.
    • (1990) Journal of Operations Management , vol.9 , pp. 85-100
    • Freeland, J.R.1    Leschke, J.P.2    Weiss, E.N.3
  • 6
    • 0002687992 scopus 로고
    • Impact of the setup variable on capacity and inventory decisions
    • Hahn, C. K., Bragg, D. J. and Shin, D., 1988, Impact of the setup variable on capacity and inventory decisions. Academy of Management Review, 13, 91-103.
    • (1988) Academy of Management Review , vol.13 , pp. 91-103
    • Hahn, C.K.1    Bragg, D.J.2    Shin, D.3
  • 7
    • 0004102426 scopus 로고
    • Homewood, IL: Dow Jones-lrwin)
    • Hall, R. W., 1983, Zero Inventory (Homewood, IL: Dow Jones-lrwin).
    • (1983) Zero Inventory
    • Hall, R.W.1
  • 9
  • 10
    • 0003449926 scopus 로고
    • Norcross, GA: Industrial Engineering and Management Press)
    • Monden, Y., 1983, Toyota Production System (Norcross, GA: Industrial Engineering and Management Press).
    • (1983) Toyota Production System
    • Monden, Y.1
  • 11
  • 12
    • 84985817984 scopus 로고
    • A joint lot-sizing rule for fixed labor-cost situations
    • Pinto, P. A. and Mabert, V. A., 1986, A joint lot-sizing rule for fixed labor-cost situations. Decision Sciences, 17, 139-150.
    • (1986) Decision Sciences , vol.17 , pp. 139-150
    • Pinto, P.A.1    Mabert, V.A.2
  • 13
    • 0000752798 scopus 로고
    • Investing in reduced setups in the EOQ model
    • Porteus, E., 1985, Investing in reduced setups in the EOQ model. Management Science, 31, 998-1010.
    • (1985) Management Science , vol.31 , pp. 998-1010
    • Porteus, E.1
  • 14
    • 0022613610 scopus 로고
    • Optimal lot size, process quality improvement and setup cost reduction
    • Porteus, E., 1986, Optimal lot size, process quality improvement and setup cost reduction. Operations Research, 34, 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.1
  • 17
    • 0023437336 scopus 로고
    • Setup reduction and increased effective capacity
    • Spence, A. and Porteus, E., 1987, Setup reduction and increased effective capacity. Management Science, 33, 1291-1301.
    • (1987) Management Science , vol.33 , pp. 1291-1301
    • Spence, A.1    Porteus, E.2
  • 18
    • 0019286974 scopus 로고
    • Scheduling components for group technology lines (A new application for MRP)
    • Spencer, M. S., 1980, Scheduling components for group technology lines (a new application for MRP). Production and Inventory Management, 21, 43-49.
    • (1980) Production and Inventory Management , vol.21 , pp. 43-49
    • Spencer, M.S.1
  • 19
    • 0017557653 scopus 로고
    • Toyota production system and kanban system: Materialization of just-in-time and respect-for-human system
    • Sugimori, Y., ICusunoki, K., Cho, F. and Uchikawa, S., 1977, Toyota production system and kanban system: materialization of just-in-time and respect-for-human system. International Journal of Production Research, 15, 553-564.
    • (1977) International Journal of Production Research , vol.15 , pp. 553-564
    • Sugimori, Y.1    Icusunoki, K.2    Cho, F.3    Uchikawa, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.