메뉴 건너뛰기




Volumn 8, Issue 3, 1996, Pages 263-278

Hybrid FMS control architectures based on holonic principles

Author keywords

Control Heuristic Embedded System Simulator (CHESS); Digital signal processing; Distributed control; Flexible Numerical Control (FNC); FMS; Heterarchical control; Hierarchical control; Holonics; Real time networks; Servo control

Indexed keywords

CONTROL HEURISTIC EMBEDDED SYSTEM SIMULATOR; FIXED MACHINE CONTROLLER BOUNDARIES; FLEXIBLE NUMERICAL CONTROL; HETERARCHICAL CONTROL; HIERARCHICAL CONTROL; HOLONIC PRINCIPLES; HYBRID FMS CONTROL ARCHITECTURES; PART MOVEMENT HOLON; REAL TIME NETWORKS; SERVO CONTROL;

EID: 0030181880     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1007/BF00403128     Document Type: Article
Times cited : (10)

References (22)
  • 2
    • 0026202434 scopus 로고
    • Proposed SERCOS Standard to Modernize Motion System Communications
    • Brennan, R. and Cortese, S., "Proposed SERCOS Standard to Modernize Motion System Communications," Power Conversion and Intelligent Motion, Vol. 17, No. 6 (1991).
    • (1991) Power Conversion and Intelligent Motion , vol.17 , Issue.6
    • Brennan, R.1    Cortese, S.2
  • 3
    • 0006510956 scopus 로고
    • An Efficient Heuristic for Scheduling Batches of Parts in a Flexible Flow System
    • Das, S.R. and Khumawala, B.M., "An Efficient Heuristic for Scheduling Batches of Parts in a Flexible Flow System," International Journal of Flexible Manufacturing Systems, Vol. 3, pp. 121-147 (1991).
    • (1991) International Journal of Flexible Manufacturing Systems , vol.3 , pp. 121-147
    • Das, S.R.1    Khumawala, B.M.2
  • 4
    • 0023385665 scopus 로고
    • Experimental Investigation of FMS Scheduling Decision Rules
    • Denzerl, D.R. and Boe, W.J., "Experimental Investigation of FMS Scheduling Decision Rules," International Journal of Production Research, Vol. 25, No. 7, pp. 979-994 (1987).
    • (1987) International Journal of Production Research , vol.25 , Issue.7 , pp. 979-994
    • Denzerl, D.R.1    Boe, W.J.2
  • 5
    • 26444435248 scopus 로고
    • Scheduling to Minimize Makespan When a Changeover Penalty Exists
    • Dessouky, Y. and Mackulak, G.T., "Scheduling to Minimize Makespan When a Changeover Penalty Exists," Journal of Manufacturing Systems, Vol. 9, No. 2, pp. 139-158 (1990).
    • (1990) Journal of Manufacturing Systems , vol.9 , Issue.2 , pp. 139-158
    • Dessouky, Y.1    Mackulak, G.T.2
  • 6
    • 44949284972 scopus 로고
    • The Evolution of Control Architectures for Automated Manufacturing Systems
    • Dilts, D.M., Boyd, N.P., and Whorms, H.H., "The Evolution of Control Architectures for Automated Manufacturing Systems," Journal of Manufacturing Systems, Vol. 10, No. 1, pp. 79-93 (1991).
    • (1991) Journal of Manufacturing Systems , vol.10 , Issue.1 , pp. 79-93
    • Dilts, D.M.1    Boyd, N.P.2    Whorms, H.H.3
  • 11
  • 13
    • 3342927721 scopus 로고
    • Master of Engineering thesis, Swinburne University of Technology, Hawthorn, Victoria, Australia January
    • Overmars, A.H., "A DSP Approach to Discrete Time Control of Distributed Systems," Master of Engineering thesis, Swinburne University of Technology, Hawthorn, Victoria, Australia (January 1993).
    • (1993) A DSP Approach to Discrete Time Control of Distributed Systems
    • Overmars, A.H.1
  • 16
    • 0003054955 scopus 로고
    • A Survey of Scheduling Rules
    • January/February
    • Panwalker, S.S. and Iskander, W., "A Survey of Scheduling Rules," Journal of Operations Research, Vol. 25, No. 1, pp. 45-61 (January/February 1977).
    • (1977) Journal of Operations Research , vol.25 , Issue.1 , pp. 45-61
    • Panwalker, S.S.1    Iskander, W.2
  • 17
    • 0024682175 scopus 로고
    • An Artificial Intelligence Approach to the Scheduling of Flexible Manufacturing Systems
    • Shaw, M.J. and Winston, A.B., "An Artificial Intelligence Approach to the Scheduling of Flexible Manufacturing Systems," IIE Transactions, Vol. 21, No. 2, pp. 170-183 (1989).
    • (1989) IIE Transactions , vol.21 , Issue.2 , pp. 170-183
    • Shaw, M.J.1    Winston, A.B.2
  • 18
    • 0041536086 scopus 로고
    • An Expert Systems Approach to Scheduling in FMS
    • Elsevier Science Publishers, North-Holland
    • Subramanyam, S. and Askin, R.G., "An Expert Systems Approach to Scheduling in FMS," in FMS: Methods and Studies, Elsevier Science Publishers, North-Holland, pp. 243-256 (1986).
    • (1986) FMS: Methods and Studies , pp. 243-256
    • Subramanyam, S.1    Askin, R.G.2
  • 21
    • 26444585485 scopus 로고
    • CHESS and Flexible Manufacturing
    • April
    • Toncich, D.J., "CHESS and Flexible Manufacturing," Engineering World, pp. 39-43 (April 1995).
    • (1995) Engineering World , pp. 39-43
    • Toncich, D.J.1
  • 22
    • 0023868237 scopus 로고
    • Multi-Pass Expert Control System - A Control/Scheduling Structure for Flexible Manufacturing Cells
    • Wu, S.Y. and Wysk, R.A., "Multi-Pass Expert Control System - A Control/Scheduling Structure for Flexible Manufacturing Cells," Journal of Manufacturing Systems, Vol. 7, No. 2, pp. 107-114 (1988).
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.2 , pp. 107-114
    • Wu, S.Y.1    Wysk, R.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.