메뉴 건너뛰기




Volumn 7, Issue 3, 1996, Pages 236-241

Experimental push/pull production control system

Author keywords

JIT; MRP II; Production planning; Production inventory control; Push pull

Indexed keywords

COMPUTER SIMULATION; COMPUTER SOFTWARE; CONTROL SYSTEMS; INVENTORY CONTROL; JUST IN TIME PRODUCTION; MANUFACTURE; PERFORMANCE; PHILOSOPHICAL ASPECTS; PLANNING; SCHEDULING;

EID: 0030151354     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537289608930349     Document Type: Article
Times cited : (23)

References (18)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, K. R., and Scudder, G. D., 1990, Sequencing with earliness and tardiness penalties: a review. Operations Research, 38, 22-36
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 2
    • 0025792925 scopus 로고
    • Scheduling to minimize weighted earliness and tardiness about a common due-date
    • De, P., Ghosh, J. B., and Wells, C. E., 1991, Scheduling to minimize weighted earliness and tardiness about a common due-date. Computer & Operations Research, 18, 465-475
    • (1991) Computer & Operations Research , vol.18 , pp. 465-475
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 3
    • 0027543702 scopus 로고
    • On general solution for a class of early/tardy problems
    • De, P., Ghosh, J. B., and Wells, C. E., 1993, On general solution for a class of early/tardy problems. Computer & Operations Research, 20, 141-149
    • (1993) Computer & Operations Research , vol.20 , pp. 141-149
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 7
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part 1
    • Hodgson, T.J., and Wang, D., 1991a, Optimal hybrid push/pull control strategies for a parallel multistage system: part 1. International Journal of Production Research, 29, 1279-1287
    • (1991) International Journal of Production Research , vol.29 , pp. 1279-1287
    • Hodgson, T.J.1    Wang, D.2
  • 8
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part 2
    • Hodgson, T.J., and Wang, D., 1991b, Optimal hybrid push/pull control strategies for a parallel multistage system: part 2. International Journal of Production Research, 29, 1453-1460
    • (1991) International Journal of Production Research , vol.29 , pp. 1453-1460
    • Hodgson, T.J.1    Wang, D.2
  • 9
    • 84952179325 scopus 로고
    • Design and analysis of pull system, a method of multistage production control
    • Kimura O., and Terada, H., 1981, Design and analysis of pull system, a method of multistage production control. International Journal of Production Research, 19, 241-253
    • (1981) International Journal of Production Research , vol.19 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 10
    • 0011757454 scopus 로고
    • Criteria for selecting a production control philosophy
    • Larsen, N. E., and Alting, L., 1993, Criteria for selecting a production control philosophy. Production Planning & Control, 4, 54-68
    • (1993) Production Planning & Control , vol.4 , pp. 54-68
    • Larsen, N.E.1    Alting, L.2
  • 12
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • Sarker, B. R., and Fitzsimmons, J. A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27, 1715-1732
    • (1989) International Journal of Production Research , vol.27 , pp. 1715-1732
    • Sarker, B.R.1    Fitzsimmons, J.A.2
  • 13
    • 0017557653 scopus 로고
    • Toyota production system and Kanban system materialization of just-in-time and respect-for-human system
    • Sugimori, Y., Kusunoki, K., Cho, F., and Uchikavva, K., 1977, Toyota production system and Kanban system materialization of just-in-time and respect-for-human system. International Journal of Production Research, 15, 553-564
    • (1977) International Journal of Production Research , vol.15 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikavva, K.4
  • 14
    • 0012331409 scopus 로고
    • Production management: Beyond the dichotomy between ‘push’ and ‘puli’
    • Villa, A., and Watanabe, T., 1993, Production management: beyond the dichotomy between ‘push’ and ‘puli’. Computer Integrated Manufacturing Systems, 6, 53-63
    • (1993) Computer Integrated Manufacturing Systems , vol.6 , pp. 53-63
    • Villa, A.1    Watanabe, T.2
  • 15
    • 0027594826 scopus 로고
    • A comparative study on material requirements planning and just-in-time
    • Wang, D. and Xu, C. G., 1993, A comparative study on material requirements planning and just-in-time. Acta Automatica Sinica, 19, 363-372
    • (1993) Acta Automatica Sinica , vol.19 , pp. 363-372
    • Wang, D.1    Xu, C.G.2
  • 16
    • 6244308872 scopus 로고
    • Optimization of control strategies and buffer sizes in discrete manufacturing systems
    • Wang, D., 1993, Optimization of control strategies and buffer sizes in discrete manufacturing systems. PrePrints of IFAC 12th World Congress, 9, Sydney (1993) pp. 343-348
    • (1993) Preprints of IFAC 12Th World Congress , vol.9 , pp. 343-348
    • Wang, D.1
  • 17
    • 6244251238 scopus 로고
    • Structure design of an experimental push/pull production management system
    • Beijing
    • Wang, D., Chen, X., and Li Y., 1993, Structure design of an experimental push/pull production management system. Proceedings of International Conference on CIM, Beijing, pp. 138-141
    • (1993) Proceedings of International Conference on CIM , pp. 138-141
    • Wang, D.1    Chen, X.2    Li, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.