-
1
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker, K. R., and Scudder, G. D., 1990, Sequencing with earliness and tardiness penalties: a review. Operations Research, 38, 22-36
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
2
-
-
0025792925
-
Scheduling to minimize weighted earliness and tardiness about a common due-date
-
De, P., Ghosh, J. B., and Wells, C. E., 1991, Scheduling to minimize weighted earliness and tardiness about a common due-date. Computer & Operations Research, 18, 465-475
-
(1991)
Computer & Operations Research
, vol.18
, pp. 465-475
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
3
-
-
0027543702
-
On general solution for a class of early/tardy problems
-
De, P., Ghosh, J. B., and Wells, C. E., 1993, On general solution for a class of early/tardy problems. Computer & Operations Research, 20, 141-149
-
(1993)
Computer & Operations Research
, vol.20
, pp. 141-149
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
4
-
-
0000436165
-
Kanban controlled pull systems: An analytic approach
-
Deleersnyder, J. L., Hodgson, T. J., Mueller-Malek, H., and O’Grady, P. J., 1989, Kanban controlled pull systems: an analytic approach. Management Science, 35, 1079-1091
-
(1989)
Management Science
, vol.35
, pp. 1079-1091
-
-
Deleersnyder, J.L.1
Hodgson, T.J.2
Mueller-Malek, H.3
O’Grady, P.J.4
-
5
-
-
0026112946
-
Embedding JIT into MRP
-
Flapper, S. D. P., Miltenburg, G.J., and Wijugard, J., 1991, Embedding JIT into MRP. International Journal of Production Research, 29, 329-341
-
(1991)
International Journal of Production Research
, vol.29
, pp. 329-341
-
-
Flapper, S.D.P.1
Miltenburg, G.J.2
Wijugard, J.3
-
7
-
-
0026168681
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part 1
-
Hodgson, T.J., and Wang, D., 1991a, Optimal hybrid push/pull control strategies for a parallel multistage system: part 1. International Journal of Production Research, 29, 1279-1287
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1279-1287
-
-
Hodgson, T.J.1
Wang, D.2
-
8
-
-
0026187108
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part 2
-
Hodgson, T.J., and Wang, D., 1991b, Optimal hybrid push/pull control strategies for a parallel multistage system: part 2. International Journal of Production Research, 29, 1453-1460
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1453-1460
-
-
Hodgson, T.J.1
Wang, D.2
-
9
-
-
84952179325
-
Design and analysis of pull system, a method of multistage production control
-
Kimura O., and Terada, H., 1981, Design and analysis of pull system, a method of multistage production control. International Journal of Production Research, 19, 241-253
-
(1981)
International Journal of Production Research
, vol.19
, pp. 241-253
-
-
Kimura, O.1
Terada, H.2
-
10
-
-
0011757454
-
Criteria for selecting a production control philosophy
-
Larsen, N. E., and Alting, L., 1993, Criteria for selecting a production control philosophy. Production Planning & Control, 4, 54-68
-
(1993)
Production Planning & Control
, vol.4
, pp. 54-68
-
-
Larsen, N.E.1
Alting, L.2
-
11
-
-
0024731470
-
Scheduling mixed-model multi-level just-in-time production systems
-
Miltenburg, J., and Sinnamon, G., 1989, Scheduling mixed-model multi-level just-in-time production systems. International Journal of Production Research, 29, 1487-1509
-
(1989)
International Journal of Production Research
, vol.29
, pp. 1487-1509
-
-
Miltenburg, J.1
Sinnamon, G.2
-
12
-
-
0024748621
-
The performance of push and pull systems: A simulation and comparative study
-
Sarker, B. R., and Fitzsimmons, J. A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27, 1715-1732
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1715-1732
-
-
Sarker, B.R.1
Fitzsimmons, J.A.2
-
13
-
-
0017557653
-
Toyota production system and Kanban system materialization of just-in-time and respect-for-human system
-
Sugimori, Y., Kusunoki, K., Cho, F., and Uchikavva, K., 1977, Toyota production system and Kanban system materialization of just-in-time and respect-for-human system. International Journal of Production Research, 15, 553-564
-
(1977)
International Journal of Production Research
, vol.15
, pp. 553-564
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Uchikavva, K.4
-
14
-
-
0012331409
-
Production management: Beyond the dichotomy between ‘push’ and ‘puli’
-
Villa, A., and Watanabe, T., 1993, Production management: beyond the dichotomy between ‘push’ and ‘puli’. Computer Integrated Manufacturing Systems, 6, 53-63
-
(1993)
Computer Integrated Manufacturing Systems
, vol.6
, pp. 53-63
-
-
Villa, A.1
Watanabe, T.2
-
15
-
-
0027594826
-
A comparative study on material requirements planning and just-in-time
-
Wang, D. and Xu, C. G., 1993, A comparative study on material requirements planning and just-in-time. Acta Automatica Sinica, 19, 363-372
-
(1993)
Acta Automatica Sinica
, vol.19
, pp. 363-372
-
-
Wang, D.1
Xu, C.G.2
-
16
-
-
6244308872
-
Optimization of control strategies and buffer sizes in discrete manufacturing systems
-
Wang, D., 1993, Optimization of control strategies and buffer sizes in discrete manufacturing systems. PrePrints of IFAC 12th World Congress, 9, Sydney (1993) pp. 343-348
-
(1993)
Preprints of IFAC 12Th World Congress
, vol.9
, pp. 343-348
-
-
Wang, D.1
-
17
-
-
6244251238
-
Structure design of an experimental push/pull production management system
-
Beijing
-
Wang, D., Chen, X., and Li Y., 1993, Structure design of an experimental push/pull production management system. Proceedings of International Conference on CIM, Beijing, pp. 138-141
-
(1993)
Proceedings of International Conference on CIM
, pp. 138-141
-
-
Wang, D.1
Chen, X.2
Li, Y.3
|