-
3
-
-
0019546385
-
Optimal maintenance models for systems subject to failure - A review
-
Sherif, Y.S. & Smith, M.L., Optimal maintenance models for systems subject to failure - a review. Naval Res. Log. Quar., 28 (1978) 47-74.
-
(1978)
Naval Res. Log. Quar.
, vol.28
, pp. 47-74
-
-
Sherif, Y.S.1
Smith, M.L.2
-
4
-
-
0026417692
-
A survey of maintenance models for multi-unit systems
-
Cho, D.I. & Parlar, M., A survey of maintenance models for multi-unit systems. Eur. J. Operational Res., 51 (1991) 1-23.
-
(1991)
Eur. J. Operational Res.
, vol.51
, pp. 1-23
-
-
Cho, D.I.1
Parlar, M.2
-
5
-
-
0018019976
-
Optimum ordering policies with lead time for an operating unit in preventive maintenance
-
Kaio, N. & Osaki, S., Optimum ordering policies with lead time for an operating unit in preventive maintenance. IEEE Trans. Reliab., 27 (1978) 270-271.
-
(1978)
IEEE Trans. Reliab.
, vol.27
, pp. 270-271
-
-
Kaio, N.1
Osaki, S.2
-
6
-
-
0019554744
-
Optimum planned maintenance policies with lead time
-
Kaio, N. & Osaki, S., Optimum planned maintenance policies with lead time. IEEE Trans. Reliab., 30 (1981) 79.
-
(1981)
IEEE Trans. Reliab.
, vol.30
, pp. 79
-
-
Kaio, N.1
Osaki, S.2
-
7
-
-
0008102339
-
An ordering policy with lead time
-
Osaki, S., An ordering policy with lead time. Int. J. System Sci., 8 (1977) 1091-1095.
-
(1977)
Int. J. System Sci.
, vol.8
, pp. 1091-1095
-
-
Osaki, S.1
-
8
-
-
0042634553
-
Two models for ordering policies
-
(note number 34), University of Manchester, Manchester, UK
-
Osaki, S. & Nakagawa, T., Two models for ordering policies. In Notes in Decision Theory, (note number 34), University of Manchester, Manchester, UK, 1977.
-
(1977)
Notes in Decision Theory
-
-
Osaki, S.1
Nakagawa, T.2
-
9
-
-
0019606592
-
A summary of optimal ordering policies
-
Osaki, S., Kaio, N. & Yamada, S., A summary of optimal ordering policies. IEEE Trans. Reliab., 30 (1981) 272-277.
-
(1981)
IEEE Trans. Reliab.
, vol.30
, pp. 272-277
-
-
Osaki, S.1
Kaio, N.2
Yamada, S.3
-
11
-
-
0018032458
-
An optimal ordering policy for a spare unit with lead time
-
Thomas, L.C. & Osaki, S., An optimal ordering policy for a spare unit with lead time. Eur. J. Operational Res., 2 (1978) 409-419.
-
(1978)
Eur. J. Operational Res.
, vol.2
, pp. 409-419
-
-
Thomas, L.C.1
Osaki, S.2
-
12
-
-
0022679932
-
Generalized spare ordering policies with random lead time
-
Park, Y.T. & Park, K.S., Generalized spare ordering policies with random lead time. Eur. J. Operational Res., 23 (1986) 320-330.
-
(1986)
Eur. J. Operational Res.
, vol.23
, pp. 320-330
-
-
Park, Y.T.1
Park, K.S.2
-
13
-
-
0022791672
-
Jointly optimal block-replacement and spare provisioning policy
-
Acharya, D., Nagabhushanam, G. & Alam, S.S., Jointly optimal block-replacement and spare provisioning policy. IEEE Trans. Reliab., 35 (1986) 447-451.
-
(1986)
IEEE Trans. Reliab.
, vol.35
, pp. 447-451
-
-
Acharya, D.1
Nagabhushanam, G.2
Alam, S.S.3
-
14
-
-
21344492783
-
Joint optimization of age replacement and continuous review spare provisioning policy
-
Kabir, A.B.M.Z. & Al-Olayan, A.S., Joint optimization of age replacement and continuous review spare provisioning policy. Int. J. Operations & Prod. Man., 14 (1994) 53-69.
-
(1994)
Int. J. Operations & Prod. Man.
, vol.14
, pp. 53-69
-
-
Kabir, A.B.M.Z.1
Al-Olayan, A.S.2
-
16
-
-
0023104509
-
A new graphic presentation of cost optimal age replacement policies
-
Kabir, A.B.M.Z., A new graphic presentation of cost optimal age replacement policies. Reliab. Engng, 17 (1987) 59-71.
-
(1987)
Reliab. Engng
, vol.17
, pp. 59-71
-
-
Kabir, A.B.M.Z.1
|